OÜ Projekteerimisbüroo Maa ja Vesi

In the registerRegistry code: 10033667

OÜ Projekteerimisbüroo Maa ja Vesi: 2025 revenue 381,083 €, net profit -54,525 € (Company only). 10 employees, 2025 annual average (Company only). Äriregister. Snapshot: 06.11.2026.

  • Current tax-debt statusNot listedEMTA. Observation: 05.11.2026Not on the EMTA public tax-debt list (≥100 €) as of 05.11.2026.
  • Report 2025FiledÄriregisterCompany only
  • NoticesNo warning noticesAmetlikud Teadaanded. Observation: 05.11.2026
  • Revenue 2025381,083 €ÄriregisterCompany only
  • Employees 202510Äriregisterannual average; Company only

Place in the peer group

EMTAK 71121, Harju County, 2025

Revenue 2025, company only, n = 939 filed reports

0100p25p50 (median)p7512,072 €38,695 €113,812 €OÜ Projekteerimisbüroo Maa ja Vesi381,083 €, p920100p25medianp7512,072 €38,695 €113,812 €OÜ Projekteerimisbüroo Maa…381,083 €, p92

marker = company, band = p25–p75, axis = percentile 0–100

The company against its peer group by metric, 2025 · Company only
MetricCompanyMedianPer­cen­tile
Revenue381,083 €38,695 €p92 (n = 939)
Net profit-54,525 €2,292 €p2 (n = 1,200)
Equity184,468 €26,811 €p85 (n = 1,202)
Employees100p98 (n = 1,200)

Each percentile is computed separately, so n differs; hidden below 5 companies; medians and quartiles in whole euros (rounded). Source: Business Register (annual reports), snapshot 06.11.2026.

Not an official extract; no credit rating is provided.

Register details and contacts
Registered name
OÜ Projekteerimisbüroo Maa ja Vesi
Registry code
10033667
Status
in the register (R)
Legal form
Private limited company
Registered
23.05.1996
Share capital
25,728 €
VAT number
EE100125212
Address
Harju County · Tallinn, Kristiine linnaosa, Tulika tn 19

Source: Business Register (open data), CC BY 4.0

Former names / legal succession

Former names: aktsiaselts Projekteerimisbüroo Maa ja Vesi

Business Register (open data)

Names of current board members load in the interactive view.

Report coverage

Annual reports found in our data as of 2026-11-06

Cohort: R-status OÜs registered before 2023, with a 31 December fiscal year end. Years 2024 and 2025 are fixed, independent of the financial benchmark year. Sector and county use current principal company details.

Absence from our data is not evidence of non-filing. Each company counts once per year, including zero or missing revenue. Completeness of national coverage is unknown.

Source extract cutoff: 2026-09-30

↔ Scroll horizontally to see all columns.

Report coverage
Fiscal yearData status
2024Found in data
2025Found in data
Äriregister · CC BY 4.0; calculations by Ärikratt2026-11-06

OÜ Projekteerimisbüroo Maa ja Vesi is a private limited company. In 2025, revenue fell 24.4 % to 381,083 €, profit was -54,525 € (previous year 64,636 €). The main activity is NACE class: Engineering activities and related technical consultancy (71121). The company is located in Harju County. Registered 23.05.1996. Share capital is 25,728 €. 2025 annual-report figures (Company only): annual average employees 10. Taxes for III quarter of 2026 were 52,192 €. Not on the EMTA public tax-debt list (≥100 €) as of 05.11.2026. EMTA. Snapshot: 06.11.2026. There are 4 activity-licence records (including history). There are 13 single-winner procurement wins (2023–2026); recorded contract/framework ceiling value 7,216,596.5 €, not actual payments. Shared-award ceilings are recorded separately and are not added to this company total.

What are the company indicators (2025)?

OÜ Projekteerimisbüroo Maa ja Vesi: revenue 381,083 € (period: 2025; company only; source: Äriregister; snapshot: 06.11.2026).

#naitajadSnapshot

Annual-report figures: Company only Tax data refers to this legal entity.

Peer group: 71121 · Harju County · 2025 · n = 939

↔ Scroll horizontally to see all columns.

Key figures
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
RevenueRevenue: 2019 to 2025, min 2025 · 381,083 €, max 2020 · 522,761 €, latest 2025 · 381,083 €2019 – 2025381,083 €-24.4 %p92 (n = 939)2025; Company onlyRIKchecked 08.11.2026Δ: -24.4 %Position: p92 (n = 939)2025; Company onlyRIKAs of: checked 08.11.2026
Net profitNet profit: 2019 to 2025, min 2025 · -54,525 €, max 2020 · 82,443 €, latest 2025 · -54,525 €2019 – 2025-54,525 €-184.4 %p2 (n = 1200)2025 · margin -14.3 % (previous year 12.8 %); Company onlyRIKchecked 08.11.2026Δ: -184.4 %Position: p2 (n = 1200)2025 · margin -14.3 % (previous year 12.8 %); Company onlyRIKAs of: checked 08.11.2026
EquityEquity: 2019 to 2025, min 2025 · 184,468 €, max 2020 · 305,331 €, latest 2025 · 184,468 €2019 – 2025184,468 €—p85 (n = 1202)2025 · share of assets 76.8 % (previous year 78.8 %); Company onlyRIKchecked 08.11.2026Position: p85 (n = 1202)2025 · share of assets 76.8 % (previous year 78.8 %); Company onlyRIKAs of: checked 08.11.2026
EmployeesEmployees: 2019 to 2025, min 2024 · 9, max 2020 · 12, latest 2025 · 102019 – 202510—p98 (n = 1200)2025; Company onlyRIKchecked 08.11.2026Position: p98 (n = 1200)2025; Company onlyRIKAs of: checked 08.11.2026
Turnover per the Tax BoardTurnover per the Tax Board: 2022 I to 2026 III, min 2026 I · 74,717 €, max 2022 I · 171,964 €, latest 2026 III · 89,996 €2022 I – 2026 III74,760 €——2025 IV · VAT registered; Company onlyMTAchecked 08.11.20262025 IV · VAT registered; Company onlyMTAAs of: checked 08.11.2026
State taxesState taxes: 2022 I to 2026 III, min 2026 I · 39,212 €, max 2025 II · 66,277 €, latest 2026 III · 52,192 €2022 I – 2026 III42,923 €——2025 IV; Company onlyMTAchecked 08.11.20262025 IV; Company onlyMTAAs of: checked 08.11.2026
Labour taxesLabour taxes: 2022 I to 2026 III, min 2022 III · 27,834 €, max 2026 III · 36,737 €, latest 2026 III · 36,737 €2022 I – 2026 III33,115 €——2025 IV; Company onlyMTAchecked 08.11.20262025 IV; Company onlyMTAAs of: checked 08.11.2026
State aid receivedmissing——no state-aid decisionsRAR, RTKchecked 08.11.2026no state-aid decisionsRAR, RTKAs of: checked 08.11.2026
Report 2025filed———RIKchecked 08.11.2026RIKAs of: checked 08.11.2026

EMTA: state taxes are paid taxes net of refunds; labour taxes are paid income and social tax plus pension and unemployment insurance contributions.

The percentile (p) is the company rank among peers in the same activity and county in the same year. It is hidden when fewer than 5 companies qualify. Each figure shows its period and source.

Which legal entities are related to the company (snapshot 06.11.2026)?

OÜ Projekteerimisbüroo Maa ja Vesi: ownership links are between legal entities only; shared-board links show companies, not people (source: Äriregister; snapshot: 06.11.2026).

#seosedSnapshot

Dated register facts. No signals does not confirm the absence of liabilities.

Owners and holdings

No legal-entity owners or holdings.

Business Register shareholders · Natural-person owners are hidden, so the percentages may stay below 100 %.

State property contracts

Fees exclude VAT; currency is unknown. Each fee has its own period. Never sum or annualise fees. Types and statuses are source assertions; this is not a general property ownership register.

Rows on this page / total records: 1 / 1

Download this page as CSV

Ended (1)

State property contracts · Ended
Contract codeContract type (source)Subtype (source)Company’s roleSource statusValid from (source)Valid until (source)Concluded on (source)Ended on (source)Source feeVAT applies (source)
71000944Grant use · KASUTANDruumide üürimine ja rentimineReceiving partyEnded1996-12-01UnknownUnknown2011-03-31Unknown, currency unknown, per month, excluding VATNo (source assertion)

Source: Riigi kinnisvararegister · CC0 1.0

Companies sharing a board member

RIK

Same query via MCP

Source: Äriregister · Riigi kinnisvararegister · Äriregister: Source observation date unknown · Riigi kinnisvararegister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 06.11.2026 · View company sources · All sources and licences

What are the company signals (snapshot 06.11.2026)?

we count and cite; we do not grade

OÜ Projekteerimisbüroo Maa ja Vesi: Not on the EMTA public tax-debt list (≥100 €) as of 05.11.2026. EMTA. Snapshot: 06.11.2026.

#signaalidSnapshot

↔ Scroll horizontally to see all columns.

Public signals
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Current tax-debt statusNot on the EMTA public tax-debt list (≥100 €) as of 05.11.2026.Check directly: EMTA ———EMTA05.11.2026EMTAAs of: 05.11.2026
Debt episode (history)missing——off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTA05.11.2026off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTAAs of: 05.11.2026
Annual reportsReport 2025 filed———RIKchecked 08.11.2026RIKAs of: checked 08.11.2026
Official noticesNo bankruptcy, liquidation, restructuring or enforcement notices——5 yearsAmetlikud Teadaandedchecked 08.11.20265 yearsAmetlikud TeadaandedAs of: checked 08.11.2026
StatusStatus changes: 1——status history: 7 entriesRIKchecked 08.11.2026status history: 7 entriesRIKAs of: checked 08.11.2026
Composite signal (derived)Lowview——Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt—Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt
Commercial pledgeNo commercial pledge——pledgee names withheldRIKchecked 08.11.2026pledgee names withheldRIKAs of: checked 08.11.2026
Court decisions · sanctions · trademarkssource missing——a company-level link has not been published yet——a company-level link has not been published yet
Composite signal components (derived, not an official score)

Score (derived) 10/100 derived

A composite signal from structured data, not an official assessment or credit rating. It describes data known at calculation time; no forecast horizon is specified.

Calculated 05.11.2026 10:15.

Methodology version: 1.3.

Stored component contributions

  1. Tax debt · 0 points
  2. Financial health · 10 points
    View stored evidence

    Stored contribution: 10 points.

  3. Board changes · 0 points
  4. Insolvency notices · 0 points
  5. Licence loss · 0 points

A stored 0 proves neither absence of events nor complete source coverage. Without detail, its cause is unknown.

The underlying record reference is unavailable. No specific event or document can be identified.

methodology

Calculated 05.11.2026 10:15. The score is not a credit rating and not a default forecast. methodology · The score is not a credit rating

Snapshot: Äriregister: 06.11.2026 07:45 · EMTA: 06.11.2026 07:45 · Ametlikud Teadaanded: 06.11.2026 07:45
Source: Äriregister · EMTA · Ametlikud TeadaandedLatest available report year: 2025 (annual reporting) · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 05.11.2026 (daily debt list) · Older than the expected daily observation (checked: 08.11.2026) · Score calculated: 05.11.2026 · Calculation and snapshot publication do not establish source freshness · Äriregister: Source observation date unknown · EMTA: Debt list observed: 05.11.2026 · daily debt list · Older than the expected daily observation (checked: 08.11.2026) · Ametlikud Teadaanded: Latest retained notice published: 05.11.2026 · Source observation date unknown · Source acquisition date unknown · Snapshot published: 06.11.2026View company sourcesAll sources and licences

What are the company financial results (2025)?

OÜ Projekteerimisbüroo Maa ja Vesi: net profit -54,525 € (period: 2025; company only; source: Äriregister; snapshot: 06.11.2026).

#finantsSnapshot

2025 · Company only: revenue 381,083 €, net profit -54,525 €.

Annual reports 2019–2025

↔ Scroll horizontally to see all columns.

Financials
MetricValueΔPeriod and basisSourceAs ofComparison and sources
Revenue381,083 €-24.4 %2025; Company onlyRIKchecked 08.11.2026Δ: -24.4 %2025; Company onlyRIKAs of: checked 08.11.2026
Net profit-54,525 €-184.4 %2025; Company onlyRIKchecked 08.11.2026Δ: -184.4 %2025; Company onlyRIKAs of: checked 08.11.2026
Equity184,468 €-35 %2025; Company onlyRIKchecked 08.11.2026Δ: -35 %2025; Company onlyRIKAs of: checked 08.11.2026
Assets240,043 €-33.4 %2025; Company onlyRIKchecked 08.11.2026Δ: -33.4 %2025; Company onlyRIKAs of: checked 08.11.2026
Employees10+11.1 %2025; Company onlyRIKchecked 08.11.2026Δ: +11.1 %2025; Company onlyRIKAs of: checked 08.11.2026
Revenue504,239 €-1.5 %2024; Company onlyRIKchecked 08.11.2026Δ: -1.5 %2024; Company onlyRIKAs of: checked 08.11.2026
Net profit64,636 €+121.6 %2024; Company onlyRIKchecked 08.11.2026Δ: +121.6 %2024; Company onlyRIKAs of: checked 08.11.2026
Equity283,993 €+11.7 %2024; Company onlyRIKchecked 08.11.2026Δ: +11.7 %2024; Company onlyRIKAs of: checked 08.11.2026
Assets360,391 €+11.4 %2024; Company onlyRIKchecked 08.11.2026Δ: +11.4 %2024; Company onlyRIKAs of: checked 08.11.2026
Employees9-10 %2024; Company onlyRIKchecked 08.11.2026Δ: -10 %2024; Company onlyRIKAs of: checked 08.11.2026
Revenue511,822 €+10.4 %2023; Company onlyRIKchecked 08.11.2026Δ: +10.4 %2023; Company onlyRIKAs of: checked 08.11.2026
Net profit29,173 €+15.8 %2023; Company onlyRIKchecked 08.11.2026Δ: +15.8 %2023; Company onlyRIKAs of: checked 08.11.2026
Equity254,358 €-5.9 %2023; Company onlyRIKchecked 08.11.2026Δ: -5.9 %2023; Company onlyRIKAs of: checked 08.11.2026
Assets323,565 €-18.7 %2023; Company onlyRIKchecked 08.11.2026Δ: -18.7 %2023; Company onlyRIKAs of: checked 08.11.2026
Employees100 %2023; Company onlyRIKchecked 08.11.2026Δ: 0 %2023; Company onlyRIKAs of: checked 08.11.2026
Revenue463,802 €+3.7 %2022; Company onlyRIKchecked 08.11.2026Δ: +3.7 %2022; Company onlyRIKAs of: checked 08.11.2026
Net profit25,195 €-27.3 %2022; Company onlyRIKchecked 08.11.2026Δ: -27.3 %2022; Company onlyRIKAs of: checked 08.11.2026
Equity270,185 €-6.8 %2022; Company onlyRIKchecked 08.11.2026Δ: -6.8 %2022; Company onlyRIKAs of: checked 08.11.2026
Assets398,154 €+9.5 %2022; Company onlyRIKchecked 08.11.2026Δ: +9.5 %2022; Company onlyRIKAs of: checked 08.11.2026
Employees100 %2022; Company onlyRIKchecked 08.11.2026Δ: 0 %2022; Company onlyRIKAs of: checked 08.11.2026
Revenue447,308 €-14.4 %2021; Company onlyRIKchecked 08.11.2026Δ: -14.4 %2021; Company onlyRIKAs of: checked 08.11.2026
Net profit34,659 €-58 %2021; Company onlyRIKchecked 08.11.2026Δ: -58 %2021; Company onlyRIKAs of: checked 08.11.2026
Equity289,990 €-5 %2021; Company onlyRIKchecked 08.11.2026Δ: -5 %2021; Company onlyRIKAs of: checked 08.11.2026
Assets363,601 €-10.2 %2021; Company onlyRIKchecked 08.11.2026Δ: -10.2 %2021; Company onlyRIKAs of: checked 08.11.2026
Employees10-16.7 %2021; Company onlyRIKchecked 08.11.2026Δ: -16.7 %2021; Company onlyRIKAs of: checked 08.11.2026
Revenue522,761 €+19.4 %2020; Company onlyRIKchecked 08.11.2026Δ: +19.4 %2020; Company onlyRIKAs of: checked 08.11.2026
Net profit82,443 €+72 %2020; Company onlyRIKchecked 08.11.2026Δ: +72 %2020; Company onlyRIKAs of: checked 08.11.2026
Equity305,331 €+16.1 %2020; Company onlyRIKchecked 08.11.2026Δ: +16.1 %2020; Company onlyRIKAs of: checked 08.11.2026
Assets404,731 €+24.6 %2020; Company onlyRIKchecked 08.11.2026Δ: +24.6 %2020; Company onlyRIKAs of: checked 08.11.2026
Employees12+9.1 %2020; Company onlyRIKchecked 08.11.2026Δ: +9.1 %2020; Company onlyRIKAs of: checked 08.11.2026
Revenue437,670 €—2019; Company onlyRIKchecked 08.11.20262019; Company onlyRIKAs of: checked 08.11.2026
Net profit47,931 €—2019; Company onlyRIKchecked 08.11.20262019; Company onlyRIKAs of: checked 08.11.2026
Equity262,888 €—2019; Company onlyRIKchecked 08.11.20262019; Company onlyRIKAs of: checked 08.11.2026
Assets324,804 €—2019; Company onlyRIKchecked 08.11.20262019; Company onlyRIKAs of: checked 08.11.2026
Employees11—2019; Company onlyRIKchecked 08.11.20262019; Company onlyRIKAs of: checked 08.11.2026

Same query via MCP

Source: Äriregister · Latest available report year: 2025 (annual reporting) · Äriregister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 06.11.2026 · View company sources · All sources and licences

How much tax did the company pay (2026 III)?

OÜ Projekteerimisbüroo Maa ja Vesi: state taxes 52,192 € (period: 2026 III; company only; source: EMTA; snapshot: 06.11.2026).

#maksudSnapshot

↔ Scroll horizontally to see all columns.

Tax figures by quarter
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Quarterly declared turnover (EMTA)89,996 €——2026 III; Company onlyEMTAchecked 08.11.20262026 III; Company onlyEMTAAs of: checked 08.11.2026
State taxes52,192 €——2026 III; Company onlyEMTAchecked 08.11.20262026 III; Company onlyEMTAAs of: checked 08.11.2026
Labour taxes36,737 €——2026 III; Company onlyEMTAchecked 08.11.20262026 III; Company onlyEMTAAs of: checked 08.11.2026
Employees (EMTA quarter, legal entity)11——2026 III; Company onlyEMTAchecked 08.11.20262026 III; Company onlyEMTAAs of: checked 08.11.2026
Tax Board public tax data
QuarterQuarterly declared turnover (EMTA) (€)State taxes €Labour taxes €Employees (EMTA quarter, legal entity)
2026 III89,99652,19236,73711
2026 II133,78256,71332,25112
2026 I74,71739,21235,76511
2025 IV74,76042,92333,11511
2025 III106,25048,65933,42211
2025 II119,61366,27732,7869
2025 I142,18859,56635,1489
2024 IV152,59254,58630,62110
2024 III144,75755,28429,8499
2024 II108,07152,61529,9919

Showing 10 / 19

Source: EMTA · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 05.11.2026 (daily debt list) · Older than the expected daily observation (checked: 08.11.2026) · EMTA: Debt list observed: 05.11.2026 · daily debt list · Older than the expected daily observation (checked: 08.11.2026) · Source acquisition date unknown · Snapshot published: 06.11.2026 · View company sources · All sources and licences

What state aid has the company received (snapshot 06.11.2026)?

OÜ Projekteerimisbüroo Maa ja Vesi: displayed state aid decisions and project grants 0 (source: RAR, RTK; snapshot: 06.11.2026).

#toetusedSnapshot

Observed ship-register entries

Owner entry in the register, may not be current owner. Current ownership is unverified. Separate revisions are separate entries, not additional vessels. Type and use retain the source wording.

No observed entries for open ships in this snapshot.

Source: Centre of Registers and Information Systems, ship register · Licence: CC BY-SA 4.0 · RIK Laev.xml, CC BY-SA 4.0 · Registrite ja Infosüsteemide Keskus (RIK) · Data catalogue

Environmental records

Source presence and source status do not confirm permit validity. Emission sources and waste facilities are separate record types. Record counts are not an environmental footprint or pollution quantities. Location is unknown.

No environmental records in this snapshot.

Source: Keskkonnaamet, KOTKAS permits, AvTS § 3¹(9)

Source: RTK · MTR · Keskkonnaamet · RTK: Source observation date unknown · MTR: Source observation date unknown · Keskkonnaamet: Source observation date unknown · Source acquisition date unknown · Snapshot published: 06.11.2026 · View company sources · All sources and licences

What procurement has the company won (snapshot 06.11.2026)?

OÜ Projekteerimisbüroo Maa ja Vesi: procurement wins 13 (source: Riigihangete register; snapshot: 06.11.2026).

#hankedSnapshot

Won a tender. The company has won a public tender, 13 wins.

Informational indicators, not accusations or proof of wrongdoing. Free CSV exports the loaded rows. Load more to include further results.

Riigi poolt korras hoitavate ühiseesvoolude projekteerimistööd (I piiratud hankemenetlus) · 13.05.2026

Incorporated < 90 days before decision: Rule not met; ; ; 826cdd29-ef79-400b-a798-3858b8a573db/RES-0002/10033667 | 2026-05-13 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306873; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; 826cdd29-ef79-400b-a798-3858b8a573db/RES-0002/10033667 | 2026-05-13 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306873 Repeated recorded procedures: Unknown; ; ; On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

826cdd29-ef79-400b-a798-3858b8a573db/RES-0002/10033667 · 2026-05-13

ariregister:10033667 · 1996-05-23

826cdd29-ef79-400b-a798-3858b8a573db/RES-0002/10033667 · 2026-05-13

Riigi poolt korras hoitavate ühiseesvoolude projekteerimistööd (I piiratud hankemenetlus) · 07.05.2026

Incorporated < 90 days before decision: Rule not met; ; ; 826cdd29-ef79-400b-a798-3858b8a573db/RES-0001/10033667 | 2026-05-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306873; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; 826cdd29-ef79-400b-a798-3858b8a573db/RES-0001/10033667 | 2026-05-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306873 Repeated recorded procedures: Unknown; ; ; On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

826cdd29-ef79-400b-a798-3858b8a573db/RES-0001/10033667 · 2026-05-07

ariregister:10033667 · 1996-05-23

826cdd29-ef79-400b-a798-3858b8a573db/RES-0001/10033667 · 2026-05-07

Metsaparandusprojektide keskkonnamõju eelhinnangute koostamine · 20.04.2026

Incorporated < 90 days before decision: Rule not met; ; ; f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 | 2024-11-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/10033667 · 2026-04-20

ariregister:10033667 · 1996-05-23

f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/10033667 · 2026-04-20

16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 · 2025-01-06

700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 · 2024-09-19

8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 · 2025-09-11

87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 · 2023-05-31

96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 · 2025-10-01

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 · 2024-11-08

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 · 2024-11-11

c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 · 2026-04-20

eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 · 2026-04-20

Teede projekteerimistööd 2026-2030 · 20.04.2026

Incorporated < 90 days before decision: Rule not met; ; ; 4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; 4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 | 2024-11-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/10033667 · 2026-04-20

ariregister:10033667 · 1996-05-23

4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/10033667 · 2026-04-20

16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 · 2025-01-06

700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 · 2024-09-19

8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 · 2025-09-11

87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 · 2023-05-31

96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 · 2025-10-01

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 · 2024-11-08

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 · 2024-11-11

c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 · 2026-04-20

eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 · 2026-04-20

Kalade koelmualade ja veeliste elupaikade parandamiseks ning taastamiseks vajalike ehitusprojektide koostamine · 01.10.2025

Incorporated < 90 days before decision: Rule not met; ; ; a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 | 2024-11-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/10033667 · 2025-10-01

ariregister:10033667 · 1996-05-23

a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/10033667 · 2025-10-01

16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 · 2025-01-06

700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 · 2024-09-19

8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 · 2025-09-11

87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 · 2023-05-31

96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 · 2025-10-01

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 · 2024-11-08

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 · 2024-11-11

c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 · 2026-04-20

eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 · 2026-04-20

Tohlu voolusängi taastamise projekteerimine · 11.09.2025

Incorporated < 90 days before decision: Rule not met; ; ; 82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; 82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 | 2024-11-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/10033667 · 2025-09-11

ariregister:10033667 · 1996-05-23

82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/10033667 · 2025-09-11

16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 · 2025-01-06

700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 · 2024-09-19

8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 · 2025-09-11

87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 · 2023-05-31

96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 · 2025-10-01

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 · 2024-11-08

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 · 2024-11-11

c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 · 2026-04-20

eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 · 2026-04-20

Maaparanduse ehitusprojektide ekspertiisid 2025-2028 · 06.01.2025

Incorporated < 90 days before decision: Rule not met; ; ; d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 | 2024-11-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/10033667 · 2025-01-06

ariregister:10033667 · 1996-05-23

d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/10033667 · 2025-01-06

16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 · 2025-01-06

700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 · 2024-09-19

8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 · 2025-09-11

87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 · 2023-05-31

96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 · 2025-10-01

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 · 2024-11-08

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 · 2024-11-11

c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 · 2026-04-20

eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 · 2026-04-20

Metsise püsielupaikade (Rabaküla, Mõtuse, Kaugoja, Kotisoo-Marina, Reiu, Marana) loodusliku veerežiimi taastamise projekteerimine · 11.11.2024

Incorporated < 90 days before decision: Rule not met; ; ; a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 | 2024-11-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/10033667 · 2024-11-11

ariregister:10033667 · 1996-05-23

a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/10033667 · 2024-11-11

16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 · 2025-01-06

700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 · 2024-09-19

8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 · 2025-09-11

87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 · 2023-05-31

96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 · 2025-10-01

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 · 2024-11-08

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 · 2024-11-11

c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 · 2026-04-20

eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 · 2026-04-20

Metsise püsielupaikade (Rabaküla, Mõtuse, Kaugoja, Kotisoo-Marina, Reiu, Marana) loodusliku veerežiimi taastamise projekteerimine · 11.11.2024

Incorporated < 90 days before decision: Rule not met; ; ; a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 | 2024-11-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/10033667 · 2024-11-11

ariregister:10033667 · 1996-05-23

a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/10033667 · 2024-11-11

16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 · 2025-01-06

700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 · 2024-09-19

8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 · 2025-09-11

87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 · 2023-05-31

96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 · 2025-10-01

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 · 2024-11-08

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 · 2024-11-11

c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 · 2026-04-20

eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 · 2026-04-20

Metsise püsielupaikade (Rabaküla, Mõtuse, Kaugoja, Kotisoo-Marina, Reiu, Marana) loodusliku veerežiimi taastamise projekteerimine · 11.11.2024

Incorporated < 90 days before decision: Rule not met; ; ; a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; ariregister:10033667 | 1996-05-23 | https://ariregister.rik.ee/est/company/10033667 One tender reported: Rule not met; ; ; a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 | 2025-01-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286978; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 | 2025-09-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296743; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 | 2025-10-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295455; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 | 2024-11-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 | 2024-11-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283472; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305382 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/10033667 · 2024-11-11

ariregister:10033667 · 1996-05-23

a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/10033667 · 2024-11-11

16905e36-42db-45d5-a776-9e02753f720e/d56584a0-ce99-4a0e-9069-a68c80065545/RES-0000/TEN-0003/10033667 · 2025-01-06

700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0004/10033667 · 2024-09-19

8609e0b4-5bd4-41d1-a24a-6612a56c4e77/82f3b774-127d-45ba-8e23-f03b48a4246a/RES-0000/TEN-0001/10033667 · 2025-09-11

87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0005/TEN-0006/10033667 · 2023-05-31

96495efc-40bb-4a86-8573-c9a6c7f82ba7/a23c7430-4660-4ffa-8706-2aa85836ef22/RES-0000/TEN-0002/10033667 · 2025-10-01

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0000/TEN-0001/10033667 · 2024-11-08

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0001/TEN-0002/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0002/TEN-0003/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0003/TEN-0004/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0004/TEN-0005/10033667 · 2024-11-11

a58c06da-3b9e-44b8-876e-75e5cf6a10fb/a6c29a7b-15fd-4f5b-ab31-50afad6102b2/RES-0005/TEN-0006/10033667 · 2024-11-11

c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0007/10033667 · 2026-04-20

eae52eba-fa01-486a-8550-3b880f32a06c/f81ca101-dec3-4867-af41-afe8a30b8eac/RES-0000/TEN-0003/10033667 · 2026-04-20

Showing 10 / 18

Source: Riigihangete register · Riigihangete register: Source observation date unknown · Source acquisition date unknown · Snapshot published: 06.11.2026 · View company sources · All sources and licences

What changed in the company history (snapshot 06.11.2026)?

OÜ Projekteerimisbüroo Maa ja Vesi: the timeline shows historical events, not an assessment of current status (source: Äriregister, EMTA, Ametlikud Teadaanded; snapshot: 06.11.2026).

#ajajoonSnapshot

2026

  • Share capital changed: €25,728 → €25,728
    register
Reports, taxes and grants (2)
  • Tax Board 2026 III: turnover €90k, employees: 11
    taxes
  • Tax Board 2026 II: turnover €133.8k, employees: 12
    taxes

2012

  • Share capital changed: 402000.0 EEK → €25,728
    register

1999

  • Share capital changed: 352000.0 EEK → 402000.0 EEK
    register

1998

  • Share capital changed: 252000.0 EEK → 352000.0 EEK
    register

1996

  • Entered in the business register
    register
  • Share capital changed: missing → 252000.0 EEK
    register
  • Name changed: missing → aktsiaselts Projekteerimisbüroo Maa ja Vesi
    register
  • Status changed: missing → in the register
    register

Showing 10 / 27

Events: 27 · newest first · Sources: Business Register, Tax Board, RTK, Official Notices

Which sources supply the data (snapshot 06.11.2026)?

OÜ Projekteerimisbüroo Maa ja Vesi: displayed source records 9 (source: Äriregister, EMTA, RTK, MTR, Keskkonnaamet, Ametlikud Teadaanded, Riigi kinnisvararegister, Riigihangete register, RIK laevakinnistusraamat; snapshot: 06.11.2026).

#allikadSnapshot
View Markdown

↔ Scroll horizontally to see all columns.

Block, source, licence, period, vintage and official link
BlockSourceLicenceExpected cadenceSource observationSnapshotCheckedOfficial record
Business RegisterÄriregisterCC BY 4.0nightlySource observation date unknown06.11.2026 07:4508.11.2026open ↗
TaxesEMTACC BY-SA 3.0quarterly tax figures / daily debt listDebt list observed: 05.11.2026 · daily debt list · Older than the expected daily observation (checked: 08.11.2026)06.11.2026 07:4508.11.2026open ↗
GrantsRTKCC BY-SA 3.0 (Euroopa Liidu struktuuritoetus). RAR: AvTS § 3¹ lg 9.missingSource observation date unknown06.11.2026 07:4508.11.2026open ↗
LicencesMTRCC BY-SA 3.0missingSource observation date unknown06.11.2026 07:4508.11.2026open ↗
LicencesKeskkonnaametAvTS § 3¹ lg 9missingSource observation date unknown06.11.2026 07:4508.11.2026open ↗
AnnouncementsAmetlikud TeadaandedCC BY-SA 4.0nightlyLatest retained notice published: 05.11.2026 · Source observation date unknown06.11.2026 07:4508.11.2026open ↗
State propertyRiigi kinnisvararegisterCC0 1.0missingSource observation date unknown06.11.2026 07:4508.11.2026open ↗
Public procurementRiigihangete registerCC BY-SA 3.0nightlySource observation date unknown06.11.2026 07:4508.11.2026open ↗
missingRIK laevakinnistusraamatCC BY-SA 4.0missingSource observation date unknownmissingmissingopen ↗
Court decisions, trademarks, sanctionssource missing — a company-level link has not been published yet; this does not mean there are no records
Dates and their basis

Source observation is the source’s own as-of date; the latest notice publication does not prove observation. Snapshot is the data extract publication time. Checked is the source availability check. Missing clocks are not inferred from other dates.

Shortcuts

Quick search/ Ctrl+K
Home · Sectors · Regionsg h · g s · g r
Grants · Procurement · Compare · Watchlistg t · g k · g v · g j
In a table: move · open · compare · watchjk · ↵ · c · w
On a company page: sections1–9
←→↑↓ · Home · End

Use arrow keys to explore data points. Home and End move to the first and last point.

Close / backesc