ABB Aktsiaselts
In the registerRegistry code: 10095355
ABB Aktsiaselts: 2025 revenue 97,999,000 €, net profit 1,950,000 € (Company only). 779 employees, 2025 annual average (Company only). Äriregister. Snapshot: 17.11.2026.
- Current tax-debt statusNot listedEMTA. Observation: 16.11.2026Not on the EMTA public tax-debt list (≥100 €) as of 16.11.2026.
- Report 2025FiledÄriregisterCompany only
- NoticesNo warning noticesAmetlikud Teadaanded. Observation: 16.11.2026
- Revenue 202597,999,000 ۀriregisterCompany only
- Employees 2025779Äriregisterannual average; Company only
Place in the peer group
EMTAK 27111, Harju County, 2025
Revenue 2025, company only, n = 12 filed reports
marker = company, band = p25–p75, axis = percentile 0–100
| Metric | Company | Median | Percentile |
|---|---|---|---|
| Revenue | 97,999,000 € | 6,635,004 € | p100 (n = 12) |
| Net profit | 1,950,000 € | 288 € | p81 (n = 16) |
| Equity | 18,344,000 € | 939,673 € | p94 (n = 16) |
| Employees | 779 | 37 | p100 (n = 16) |
Each percentile is computed separately, so n differs; hidden below 5 companies; medians and quartiles in whole euros (rounded). Source: Business Register (annual reports), snapshot 17.11.2026.
Not an official extract; no credit rating is provided.
Register details and contacts
- Registered name
- ABB Aktsiaselts
- Registry code
- 10095355
- Status
- in the register (R)
- Legal form
- Public limited company
- Registered
- 26.11.1996
- Share capital
- 1,663,040 €
- VAT number
- EE100176148
- Address
- Harju County · Rae vald, Jüri alevik, Aruküla tee 83
- Website
- new.abb.com
Source: Business Register (open data), CC BY 4.0
Former names / legal succession
Former names: ABB Eesti Aktsiaselts
- Division: related company · 31.10.2019: Hitachi Energy Estonia AS (14838818)
- Merger: related company · 07.01.2003: 10485820
- Merger: related company · 18.12.2001: 10010212
- Merger: related company · 18.12.2001: 10010011
Business Register (open data)
Names of current board members load in the interactive view.
ABB Aktsiaselts is a public limited company. In 2025, revenue grew 18.6 % to 97,999,000 €, profit fell 55.2 %. The main activity is NACE class: Manufacture of electric motors, generators and transformers (27111). The company is located in Harju County. Registered 26.11.1996. Share capital is 1,663,040 €. 2025 annual-report figures (Company only): profit 1,950,000 €, annual average employees 779. Taxes for III quarter of 2026 were 3,918,204 €. Not on the EMTA public tax-debt list (≥100 €) as of 16.11.2026. EMTA. Snapshot: 17.11.2026. There are 2 state aid and grant records. There are 1 activity-licence records (including history). There are 26 single-winner procurement wins (2023–2026); recorded contract/framework ceiling value 5,442,507.36 €, not actual payments.
What are the company indicators (2025)?
ABB Aktsiaselts: revenue 97,999,000 € (period: 2025; company only; source: Äriregister; snapshot: 17.11.2026).
Annual-report figures: Company only Tax data refers to this legal entity.
Peer group: 27111 · Harju County · 2025 · n = 12
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Revenue2019 – 2025 | 97,999,000 € | +18.6 % | p100 (n = 12) | 2025; Company only | RIK | checked 17.11.2026 | +18.6 %p100 (n = 12)2025; Company onlyRIKchecked 17.11.2026 |
| Net profit2019 – 2025 | 1,950,000 € | -55.2 % | p81 (n = 16) | 2025 · margin 2 % (previous year 5.3 %); Company only | RIK | checked 17.11.2026 | -55.2 %p81 (n = 16)2025 · margin 2 % (previous year 5.3 %); Company onlyRIKchecked 17.11.2026 |
| Equity2019 – 2025 | 18,344,000 € | — | p94 (n = 16) | 2025 · share of assets 20.6 % (previous year 23.1 %); Company only | RIK | checked 17.11.2026 | p94 (n = 16)2025 · share of assets 20.6 % (previous year 23.1 %); Company onlyRIKchecked 17.11.2026 |
| Employees2019 – 2025 | 779 | — | p100 (n = 16) | 2025; Company only | RIK | checked 17.11.2026 | p100 (n = 16)2025; Company onlyRIKchecked 17.11.2026 |
| Turnover per the Tax Board2022 I – 2026 III | 30,169,072 € | — | — | 2025 IV · VAT registered; Company only | MTA | checked 17.11.2026 | 2025 IV · VAT registered; Company onlyMTAchecked 17.11.2026 |
| State taxes2022 I – 2026 III | 3,336,910 € | — | — | 2025 IV; Company only | MTA | checked 17.11.2026 | 2025 IV; Company onlyMTAchecked 17.11.2026 |
| Labour taxes2022 I – 2026 III | 3,493,306 € | — | — | 2025 IV; Company only | MTA | checked 17.11.2026 | 2025 IV; Company onlyMTAchecked 17.11.2026 |
| State aid and grants | 198,919.64 € | — | — | 1 decisions and 1 projects | RAR, RTK | snapshot 17.11.2026 | 1 decisions and 1 projectsRAR, RTKsnapshot 17.11.2026 |
| Report 2025 | filed | — | — | — | RIK | checked 17.11.2026 | RIKchecked 17.11.2026 |
EMTA: state taxes are paid taxes net of refunds; labour taxes are paid income and social tax plus pension and unemployment insurance contributions.
The percentile (p) is the company rank among peers in the same activity and county in the same year. It is hidden when fewer than 5 companies qualify. Each figure shows its period and source.
Which legal entities are related to the company (snapshot 17.11.2026)?
ABB Aktsiaselts: ownership links are between legal entities only; shared-board links show companies, not people (source: Äriregister; snapshot: 17.11.2026).
Dated register facts. No signals does not confirm the absence of liabilities.
Owners and holdings
Shareholders are recorded in the securities register (Nasdaq CSD), not in the Business Register open data — owners are unknown here.
No holdings in other legal entities.
Business Register shareholders
State property contracts
Fees exclude VAT; currency is unknown. Each fee has its own period. Never sum or annualise fees. Types and statuses are source assertions; this is not a general property ownership register.
Rows on this page / total records: 2 / 2
Download this page as CSVActive (2)
| Contract code | Contract type (source) | Subtype (source) | Company’s role | Source status | Valid from (source) | Valid until (source) | Concluded on (source) | Ended on (source) | Source fee | VAT applies (source) |
|---|---|---|---|---|---|---|---|---|---|---|
| LS13-19801 | Grant use · KASUTAND | isiklik kasutusõigus | Receiving party | Active | 2012-11-28 | Unknown | Unknown | Unknown | 0, currency unknown, per month, excluding VAT | No (source assertion) |
| LS13-19802 | Grant use · KASUTAND | isiklik kasutusõigus | Receiving party | Active | 2012-11-28 | Unknown | Unknown | Unknown | 0, currency unknown, per month, excluding VAT | No (source assertion) |
Source: Äriregister · Riigi kinnisvararegister · Äriregister: Source observation date unknown · Riigi kinnisvararegister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 17.11.2026 · View company sources · All sources and licences
What are the company signals (snapshot 17.11.2026)?
we count and cite; we do not gradeABB Aktsiaselts: Not on the EMTA public tax-debt list (≥100 €) as of 16.11.2026. EMTA. Snapshot: 17.11.2026.
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Current tax-debt status | Not on the EMTA public tax-debt list (≥100 €) as of 16.11.2026.Check directly: EMTA | — | — | — | EMTA | 16.11.2026 | EMTA16.11.2026 |
| Debt episode (history) | missing | — | — | off the list after 3 consecutive absences (EMTA ~11th/~21st swings) | EMTA | 16.11.2026 | off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTA16.11.2026 |
| Annual reports | Report 2025 filed | — | — | — | RIK | checked 17.11.2026 | RIKchecked 17.11.2026 |
| Official notices | No bankruptcy, liquidation, restructuring or enforcement notices | — | — | 5 years | Ametlikud Teadaanded | checked 17.11.2026 | 5 yearsAmetlikud Teadaandedchecked 17.11.2026 |
| Status | Status changes: 1 | — | — | status history: 8 entries | RIK | checked 17.11.2026 | status history: 8 entriesRIKchecked 17.11.2026 |
| Composite signal (derived) | Lowview | — | — | Report lateness is not scored. Notice selection and time windows differ from those used for the score. | Ärikratt | — | Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt |
| Commercial pledge | No commercial pledge | — | — | pledgee names withheld | RIK | checked 17.11.2026 | pledgee names withheldRIKchecked 17.11.2026 |
| Court decisions · sanctions · trademarks | source missing | — | — | a company-level link has not been published yet | — | — | a company-level link has not been published yet |
Composite signal components (derived, not an official score)
Score (derived) 0/100 derived
A composite signal from structured data, not an official assessment or credit rating. It describes data known at calculation time; no forecast horizon is specified.
Calculated 16.11.2026 10:15.
Methodology version: 1.3.
Stored component contributions
- Tax debt · 0 points
- Financial health · 0 points
- Board changes · 0 points
- Insolvency notices · 0 points
- Licence loss · 0 points
A stored 0 proves neither absence of events nor complete source coverage. Without detail, its cause is unknown.
The underlying record reference is unavailable. No specific event or document can be identified.
methodologyCalculated 16.11.2026 10:15. The score is not a credit rating and not a default forecast. methodology · The score is not a credit rating
Snapshot: Äriregister: 17.11.2026 07:45 · EMTA: 17.11.2026 07:45 · Ametlikud Teadaanded: 17.11.2026 07:45
What are the company financial results (2025)?
ABB Aktsiaselts: net profit 1,950,000 € (period: 2025; company only; source: Äriregister; snapshot: 17.11.2026).
2025 · Company only: revenue 97,999,000 €, net profit 1,950,000 €.
Annual reports 2019–2025
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|
| Revenue | 97,999,000 € | +18.6 % | 2025; Company only | RIK | checked 17.11.2026 | +18.6 %2025; Company onlyRIKchecked 17.11.2026 |
| Net profit | 1,950,000 € | -55.2 % | 2025; Company only | RIK | checked 17.11.2026 | -55.2 %2025; Company onlyRIKchecked 17.11.2026 |
| Equity | 18,344,000 € | -5.4 % | 2025; Company only | RIK | checked 17.11.2026 | -5.4 %2025; Company onlyRIKchecked 17.11.2026 |
| Assets | 89,093,000 € | +6.2 % | 2025; Company only | RIK | checked 17.11.2026 | +6.2 %2025; Company onlyRIKchecked 17.11.2026 |
| Employees | 779 | -2.6 % | 2025; Company only | RIK | checked 17.11.2026 | -2.6 %2025; Company onlyRIKchecked 17.11.2026 |
| Revenue | 82,651,000 € | -35.6 % | 2024; Company only | RIK | checked 17.11.2026 | -35.6 %2024; Company onlyRIKchecked 17.11.2026 |
| Net profit | 4,352,000 € | -5.1 % | 2024; Company only | RIK | checked 17.11.2026 | -5.1 %2024; Company onlyRIKchecked 17.11.2026 |
| Equity | 19,394,000 € | -3.3 % | 2024; Company only | RIK | checked 17.11.2026 | -3.3 %2024; Company onlyRIKchecked 17.11.2026 |
| Assets | 83,861,000 € | +15.6 % | 2024; Company only | RIK | checked 17.11.2026 | +15.6 %2024; Company onlyRIKchecked 17.11.2026 |
| Employees | 800 | +3.5 % | 2024; Company only | RIK | checked 17.11.2026 | +3.5 %2024; Company onlyRIKchecked 17.11.2026 |
| Revenue | 128,422,000 € | -3.4 % | 2023; Company only | RIK | checked 17.11.2026 | -3.4 %2023; Company onlyRIKchecked 17.11.2026 |
| Net profit | 4,588,000 € | +38.9 % | 2023; Company only | RIK | checked 17.11.2026 | +38.9 %2023; Company onlyRIKchecked 17.11.2026 |
| Equity | 20,046,000 € | +6.8 % | 2023; Company only | RIK | checked 17.11.2026 | +6.8 %2023; Company onlyRIKchecked 17.11.2026 |
| Assets | 72,561,000 € | -25.5 % | 2023; Company only | RIK | checked 17.11.2026 | -25.5 %2023; Company onlyRIKchecked 17.11.2026 |
| Employees | 773 | -14.8 % | 2023; Company only | RIK | checked 17.11.2026 | -14.8 %2023; Company onlyRIKchecked 17.11.2026 |
| Revenue | 132,962,000 € | +1.4 % | 2022; Company only | RIK | checked 17.11.2026 | +1.4 %2022; Company onlyRIKchecked 17.11.2026 |
| Net profit | 3,304,000 € | +162.8 % | 2022; Company only | RIK | checked 17.11.2026 | +162.8 %2022; Company onlyRIKchecked 17.11.2026 |
| Equity | 18,762,000 € | +21.4 % | 2022; Company only | RIK | checked 17.11.2026 | +21.4 %2022; Company onlyRIKchecked 17.11.2026 |
| Assets | 97,352,000 € | +2 % | 2022; Company only | RIK | checked 17.11.2026 | +2 %2022; Company onlyRIKchecked 17.11.2026 |
| Employees | 907 | -20.7 % | 2022; Company only | RIK | checked 17.11.2026 | -20.7 %2022; Company onlyRIKchecked 17.11.2026 |
| Revenue | 131,081,000 € | -16.4 % | 2021; Company only | RIK | checked 17.11.2026 | -16.4 %2021; Company onlyRIKchecked 17.11.2026 |
| Net profit | -5,258,000 € | — | 2021; Company only | RIK | checked 17.11.2026 | 2021; Company onlyRIKchecked 17.11.2026 |
| Equity | 15,458,000 € | -39.5 % | 2021; Company only | RIK | checked 17.11.2026 | -39.5 %2021; Company onlyRIKchecked 17.11.2026 |
| Assets | 95,423,000 € | -6.2 % | 2021; Company only | RIK | checked 17.11.2026 | -6.2 %2021; Company onlyRIKchecked 17.11.2026 |
| Employees | 1,144 | -3.4 % | 2021; Company only | RIK | checked 17.11.2026 | -3.4 %2021; Company onlyRIKchecked 17.11.2026 |
| Revenue | 156,748,000 € | -0.9 % | 2020; Company only | RIK | checked 17.11.2026 | -0.9 %2020; Company onlyRIKchecked 17.11.2026 |
| Net profit | 1,017,000 € | -11.6 % | 2020; Company only | RIK | checked 17.11.2026 | -11.6 %2020; Company onlyRIKchecked 17.11.2026 |
| Equity | 25,558,000 € | -8.3 % | 2020; Company only | RIK | checked 17.11.2026 | -8.3 %2020; Company onlyRIKchecked 17.11.2026 |
| Assets | 101,686,000 € | -7.5 % | 2020; Company only | RIK | checked 17.11.2026 | -7.5 %2020; Company onlyRIKchecked 17.11.2026 |
| Employees | 1,184 | -8.6 % | 2020; Company only | RIK | checked 17.11.2026 | -8.6 %2020; Company onlyRIKchecked 17.11.2026 |
| Revenue | 158,160,000 € | — | 2019; Company only | RIK | checked 17.11.2026 | 2019; Company onlyRIKchecked 17.11.2026 |
| Net profit | 1,151,000 € | — | 2019; Company only | RIK | checked 17.11.2026 | 2019; Company onlyRIKchecked 17.11.2026 |
| Equity | 27,878,000 € | — | 2019; Company only | RIK | checked 17.11.2026 | 2019; Company onlyRIKchecked 17.11.2026 |
| Assets | 109,906,000 € | — | 2019; Company only | RIK | checked 17.11.2026 | 2019; Company onlyRIKchecked 17.11.2026 |
| Employees | 1,296 | — | 2019; Company only | RIK | checked 17.11.2026 | 2019; Company onlyRIKchecked 17.11.2026 |
Source: Äriregister · Latest available report year: 2025 (annual reporting) · Äriregister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 17.11.2026 · View company sources · All sources and licences
How much tax did the company pay (2026 III)?
ABB Aktsiaselts: state taxes 3,918,204 € (period: 2026 III; company only; source: EMTA; snapshot: 17.11.2026).
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Quarterly declared turnover (EMTA) | 32,533,698 € | — | — | 2026 III; Company only | EMTA | checked 17.11.2026 | 2026 III; Company onlyEMTAchecked 17.11.2026 |
| State taxes | 3,918,204 € | — | — | 2026 III; Company only | EMTA | checked 17.11.2026 | 2026 III; Company onlyEMTAchecked 17.11.2026 |
| Labour taxes | 3,546,182 € | — | — | 2026 III; Company only | EMTA | checked 17.11.2026 | 2026 III; Company onlyEMTAchecked 17.11.2026 |
| Employees (EMTA quarter, legal entity) | 752 | — | — | 2026 III; Company only | EMTA | checked 17.11.2026 | 2026 III; Company onlyEMTAchecked 17.11.2026 |
| Quarter | Quarterly declared turnover (EMTA) (€) | State taxes € | Labour taxes € | Employees (EMTA quarter, legal entity) |
|---|---|---|---|---|
| 2026 III | 32,533,698 | 3,918,204 | 3,546,182 | 752 |
| 2026 II | 35,097,707 | 4,278,916 | 4,549,904 | 754 |
| 2026 I | 30,763,750 | 3,241,140 | 3,358,813 | 742 |
| 2025 IV | 30,169,072 | 3,336,910 | 3,493,306 | 747 |
| 2025 III | 31,693,265 | 3,365,638 | 3,556,558 | 749 |
| 2025 II | 29,163,742 | 5,110,172 | 4,526,850 | 746 |
| 2025 I | 27,140,600 | 3,053,972 | 3,181,903 | 732 |
| 2024 IV | 30,377,978 | 3,003,643 | 3,113,389 | 743 |
| 2024 III | 23,762,415 | 3,002,168 | 3,168,584 | 748 |
| 2024 II | 28,742,012 | 4,222,203 | 4,435,020 | 759 |
Showing 10 / 19
Source: EMTA · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 16.11.2026 (daily debt list) · EMTA: Debt list observed: 16.11.2026 · daily debt list · Source acquisition date unknown · Snapshot published: 17.11.2026 · View company sources · All sources and licences
What state aid has the company received (snapshot 17.11.2026)?
ABB Aktsiaselts: displayed state aid decisions and project grants 2 (source: RAR, RTK; snapshot: 17.11.2026).
Tallinna Tehnikaülikool · Muu >> Muu · 17.01.2022
Amount €: 500
Incorporated < 90 days before decision: Rule not met; ; ; state_aid:20734 | 2022-01-17 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
ABB Tallinna regionaalse äriteeninduskeskuse arendamine · 04.03.2016
Amount €: 198,419.64
Unknown Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
Observed ship-register entries
Owner entry in the register, may not be current owner. Current ownership is unverified. Separate revisions are separate entries, not additional vessels. Type and use retain the source wording.
No observed entries for open ships in this snapshot.
Source: Centre of Registers and Information Systems, ship register · Licence: CC BY-SA 4.0 · RIK Laev.xml, CC BY-SA 4.0 · Registrite ja Infosüsteemide Keskus (RIK) · Data catalogue
Environmental records
Source presence and source status do not confirm permit validity. Emission sources and waste facilities are separate record types. Record counts are not an environmental footprint or pollution quantities. Location is unknown.
Current or confirmed in source (10 of 14)
| Record type | Number | Source status | Start date | End date | Legal validity | Official link |
|---|---|---|---|---|---|---|
| Emission source | HEIT0004359 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004360 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004361 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004362 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004363 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004364 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004366 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004367 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004369 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
| Emission source | HEIT0004371 | Confirmed | Source valid from: 2022-02-21 | Source valid until: Unknown | Unknown | Official link unavailable |
Archived or ended (0 of 10)
Showing 10 / 24
Source: RTK · MTR · Keskkonnaamet · RTK: Source observation date unknown · MTR: Source observation date unknown · Keskkonnaamet: Source observation date unknown · Source acquisition date unknown · Snapshot published: 17.11.2026 · View company sources · All sources and licences
What procurement has the company won (snapshot 17.11.2026)?
ABB Aktsiaselts: procurement wins 26 (source: Riigihangete register; snapshot: 17.11.2026).
Won a tender. The company has won a public tender, 26 wins.
Informational indicators, not accusations or proof of wrongdoing. Free CSV exports the loaded rows. Load more to include further results.
Sagedusmuundurite tehniline hooldus- ja remonditeenuse osutamine · 07.10.2026
Incorporated < 90 days before decision: Rule not met; ; ; c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/10095355 | 2026-10-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315696; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Indicator present; ; ; c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/10095355 | 2026-10-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315696 Repeated recorded procedures: Indicator present; Distinct procedures: 6; Retained award dates: 2025-07-07 – 2026-10-07; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 28286a2e-873f-4bf6-b17a-4db1e49f8d57/e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/TEN-0001/10095355 | 2025-12-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/302791; 3e063f29-cfe0-4327-adb8-dda6c8d93e06/c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/TEN-0001/10095355 | 2026-10-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315696; 88d1a012-4364-4697-ae66-87ee860155b2/f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/TEN-0001/10095355 | 2026-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309303; 9c91e1fc-f616-4cdb-8fdc-a8f76efe97be/06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/TEN-0001/10095355 | 2026-05-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309446; bd80a13e-9fe9-4d97-9121-f7bd48063e70/0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/TEN-0001/10095355 | 2026-03-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307266; cd661a43-d739-4407-a798-b2dd9b1ea410/6fae2625-4a84-4899-be69-e1302b706fb5/RES-0000/TEN-0001/10095355 | 2025-07-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295318 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/10095355 · 2026-10-07
ariregister:10095355 · 1996-11-26
c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/10095355 · 2026-10-07
Kunda 110/20/6kV alajaama lühisvoolu piirava seadme ostmine (IK1753) · 18.09.2026
Incorporated < 90 days before decision: Rule not met; ; ; 3477ec54-491a-4d30-b6ee-0f338a6b28e7/RES-0000/10095355 | 2026-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313206; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; 3477ec54-491a-4d30-b6ee-0f338a6b28e7/RES-0000/10095355 | 2026-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313206 Repeated recorded procedures: Indicator present; Distinct procedures: 4; Retained award dates: 2024-04-11 – 2026-09-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 02d641c6-2c59-4e2c-9b6f-a645e6be47a7/3477ec54-491a-4d30-b6ee-0f338a6b28e7/RES-0000/TEN-0001/10095355 | 2026-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313206; 4bb88603-c260-4155-9fbd-b3acb8f6f6f1/7b79b172-1d93-440d-94e5-70eed2b9a33f/RES-0000/TEN-0001/10095355 | 2024-04-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274941; 76b1a0d1-f098-4123-900f-de12a36aa34d/b980b0b7-5bfe-4df4-baf9-0c0f23711edc/RES-0000/TEN-0001/10095355 | 2026-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308874; 8e0b57c2-9a03-43fa-9cef-803c1a0b9bd1/351e1aed-75a6-4824-aeaf-a0cb6e5e04c3/RES-0000/TEN-0001/10095355 | 2026-06-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307287 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
3477ec54-491a-4d30-b6ee-0f338a6b28e7/RES-0000/10095355 · 2026-09-18
ariregister:10095355 · 1996-11-26
3477ec54-491a-4d30-b6ee-0f338a6b28e7/RES-0000/10095355 · 2026-09-18
Lasnamäe alajaama 10kV jaotusseadme ost (IK1721) · 29.06.2026
Incorporated < 90 days before decision: Rule not met; ; ; 351e1aed-75a6-4824-aeaf-a0cb6e5e04c3/RES-0000/10095355 | 2026-06-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307287; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; 351e1aed-75a6-4824-aeaf-a0cb6e5e04c3/RES-0000/10095355 | 2026-06-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307287 Repeated recorded procedures: Indicator present; Distinct procedures: 4; Retained award dates: 2024-04-11 – 2026-09-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 02d641c6-2c59-4e2c-9b6f-a645e6be47a7/3477ec54-491a-4d30-b6ee-0f338a6b28e7/RES-0000/TEN-0001/10095355 | 2026-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313206; 4bb88603-c260-4155-9fbd-b3acb8f6f6f1/7b79b172-1d93-440d-94e5-70eed2b9a33f/RES-0000/TEN-0001/10095355 | 2024-04-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274941; 76b1a0d1-f098-4123-900f-de12a36aa34d/b980b0b7-5bfe-4df4-baf9-0c0f23711edc/RES-0000/TEN-0001/10095355 | 2026-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308874; 8e0b57c2-9a03-43fa-9cef-803c1a0b9bd1/351e1aed-75a6-4824-aeaf-a0cb6e5e04c3/RES-0000/TEN-0001/10095355 | 2026-06-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307287 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
351e1aed-75a6-4824-aeaf-a0cb6e5e04c3/RES-0000/10095355 · 2026-06-29
ariregister:10095355 · 1996-11-26
351e1aed-75a6-4824-aeaf-a0cb6e5e04c3/RES-0000/10095355 · 2026-06-29
Sekundaarõhu ventilaatori (Secondary Air Fan) 10,5 kV elektrimootori ostmine · 28.05.2026
Incorporated < 90 days before decision: Rule not met; ; ; f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/10095355 | 2026-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309303; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/10095355 | 2026-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309303 Repeated recorded procedures: Indicator present; Distinct procedures: 6; Retained award dates: 2025-07-07 – 2026-10-07; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 28286a2e-873f-4bf6-b17a-4db1e49f8d57/e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/TEN-0001/10095355 | 2025-12-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/302791; 3e063f29-cfe0-4327-adb8-dda6c8d93e06/c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/TEN-0001/10095355 | 2026-10-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315696; 88d1a012-4364-4697-ae66-87ee860155b2/f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/TEN-0001/10095355 | 2026-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309303; 9c91e1fc-f616-4cdb-8fdc-a8f76efe97be/06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/TEN-0001/10095355 | 2026-05-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309446; bd80a13e-9fe9-4d97-9121-f7bd48063e70/0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/TEN-0001/10095355 | 2026-03-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307266; cd661a43-d739-4407-a798-b2dd9b1ea410/6fae2625-4a84-4899-be69-e1302b706fb5/RES-0000/TEN-0001/10095355 | 2025-07-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295318 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/10095355 · 2026-05-28
ariregister:10095355 · 1996-11-26
f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/10095355 · 2026-05-28
Eesti elektrijaama elektrimootorite 8НОК-1 ja 8НОК-2 sagedusmuundurite vahetus · 26.05.2026
Incorporated < 90 days before decision: Rule not met; ; ; 06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/10095355 | 2026-05-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309446; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; 06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/10095355 | 2026-05-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309446 Repeated recorded procedures: Indicator present; Distinct procedures: 6; Retained award dates: 2025-07-07 – 2026-10-07; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 28286a2e-873f-4bf6-b17a-4db1e49f8d57/e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/TEN-0001/10095355 | 2025-12-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/302791; 3e063f29-cfe0-4327-adb8-dda6c8d93e06/c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/TEN-0001/10095355 | 2026-10-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315696; 88d1a012-4364-4697-ae66-87ee860155b2/f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/TEN-0001/10095355 | 2026-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309303; 9c91e1fc-f616-4cdb-8fdc-a8f76efe97be/06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/TEN-0001/10095355 | 2026-05-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309446; bd80a13e-9fe9-4d97-9121-f7bd48063e70/0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/TEN-0001/10095355 | 2026-03-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307266; cd661a43-d739-4407-a798-b2dd9b1ea410/6fae2625-4a84-4899-be69-e1302b706fb5/RES-0000/TEN-0001/10095355 | 2025-07-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295318 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/10095355 · 2026-05-26
ariregister:10095355 · 1996-11-26
06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/10095355 · 2026-05-26
Rasina 35/10 kV alajaama fiidriterminalide ost (IP8961) · 06.05.2026
Incorporated < 90 days before decision: Rule not met; ; ; b980b0b7-5bfe-4df4-baf9-0c0f23711edc/RES-0000/10095355 | 2026-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308874; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; b980b0b7-5bfe-4df4-baf9-0c0f23711edc/RES-0000/10095355 | 2026-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308874 Repeated recorded procedures: Indicator present; Distinct procedures: 4; Retained award dates: 2024-04-11 – 2026-09-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 02d641c6-2c59-4e2c-9b6f-a645e6be47a7/3477ec54-491a-4d30-b6ee-0f338a6b28e7/RES-0000/TEN-0001/10095355 | 2026-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313206; 4bb88603-c260-4155-9fbd-b3acb8f6f6f1/7b79b172-1d93-440d-94e5-70eed2b9a33f/RES-0000/TEN-0001/10095355 | 2024-04-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274941; 76b1a0d1-f098-4123-900f-de12a36aa34d/b980b0b7-5bfe-4df4-baf9-0c0f23711edc/RES-0000/TEN-0001/10095355 | 2026-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308874; 8e0b57c2-9a03-43fa-9cef-803c1a0b9bd1/351e1aed-75a6-4824-aeaf-a0cb6e5e04c3/RES-0000/TEN-0001/10095355 | 2026-06-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307287 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
b980b0b7-5bfe-4df4-baf9-0c0f23711edc/RES-0000/10095355 · 2026-05-06
ariregister:10095355 · 1996-11-26
b980b0b7-5bfe-4df4-baf9-0c0f23711edc/RES-0000/10095355 · 2026-05-06
Auvere EJ sekundaarõhu ventilaatori elektrimootori Hyosung HSWC (3610 kW, 10.5 kV) hooldus- ja remonditeenuse ostmine · 27.03.2026
Incorporated < 90 days before decision: Rule not met; ; ; 0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/10095355 | 2026-03-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307266; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; 0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/10095355 | 2026-03-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307266 Repeated recorded procedures: Indicator present; Distinct procedures: 6; Retained award dates: 2025-07-07 – 2026-10-07; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 28286a2e-873f-4bf6-b17a-4db1e49f8d57/e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/TEN-0001/10095355 | 2025-12-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/302791; 3e063f29-cfe0-4327-adb8-dda6c8d93e06/c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/TEN-0001/10095355 | 2026-10-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315696; 88d1a012-4364-4697-ae66-87ee860155b2/f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/TEN-0001/10095355 | 2026-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309303; 9c91e1fc-f616-4cdb-8fdc-a8f76efe97be/06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/TEN-0001/10095355 | 2026-05-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309446; bd80a13e-9fe9-4d97-9121-f7bd48063e70/0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/TEN-0001/10095355 | 2026-03-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307266; cd661a43-d739-4407-a798-b2dd9b1ea410/6fae2625-4a84-4899-be69-e1302b706fb5/RES-0000/TEN-0001/10095355 | 2025-07-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295318 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/10095355 · 2026-03-27
ariregister:10095355 · 1996-11-26
0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/10095355 · 2026-03-27
Auvere EJ primaarõhu ventilaatori elektrimootori FOCQUET MF-HV 900X-04 remont · 15.12.2025
Incorporated < 90 days before decision: Rule not met; ; ; e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/10095355 | 2025-12-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/302791; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/10095355 | 2025-12-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/302791 Repeated recorded procedures: Indicator present; Distinct procedures: 6; Retained award dates: 2025-07-07 – 2026-10-07; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 28286a2e-873f-4bf6-b17a-4db1e49f8d57/e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/TEN-0001/10095355 | 2025-12-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/302791; 3e063f29-cfe0-4327-adb8-dda6c8d93e06/c03e9690-a4ca-494b-828f-2bd205ae3a60/RES-0000/TEN-0001/10095355 | 2026-10-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315696; 88d1a012-4364-4697-ae66-87ee860155b2/f40fa43b-85fc-4a03-878d-15b10e939072/RES-0000/TEN-0001/10095355 | 2026-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309303; 9c91e1fc-f616-4cdb-8fdc-a8f76efe97be/06cdd1ae-a548-4f3f-96dc-892be94caef0/RES-0000/TEN-0001/10095355 | 2026-05-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309446; bd80a13e-9fe9-4d97-9121-f7bd48063e70/0f02a605-e144-4d2a-bd41-3c3f01ea6d2a/RES-0000/TEN-0001/10095355 | 2026-03-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307266; cd661a43-d739-4407-a798-b2dd9b1ea410/6fae2625-4a84-4899-be69-e1302b706fb5/RES-0000/TEN-0001/10095355 | 2025-07-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295318 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/10095355 · 2025-12-15
ariregister:10095355 · 1996-11-26
e5b9637b-4c83-4863-ba84-7e24eba9e572/RES-0000/10095355 · 2025-12-15
Türi 110/35/10 PAJ ja Rapla 110/35/10 PAJ kaitseterminalide ost (IK1758, IK1621) · 17.11.2025
Incorporated < 90 days before decision: Rule not met; ; ; 4769a64e-14cc-45b6-b0d6-448c6ecc3704/RES-0000/10095355 | 2025-11-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301406; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; 4769a64e-14cc-45b6-b0d6-448c6ecc3704/RES-0000/10095355 | 2025-11-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301406 Repeated recorded procedures: Unknown; ; ; On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
4769a64e-14cc-45b6-b0d6-448c6ecc3704/RES-0000/10095355 · 2025-11-17
ariregister:10095355 · 1996-11-26
4769a64e-14cc-45b6-b0d6-448c6ecc3704/RES-0000/10095355 · 2025-11-17
Rongide veomootorite ja generaatorite remont · 15.09.2025
Incorporated < 90 days before decision: Rule not met; ; ; e576ac9c-d677-49d8-9dc5-e69960995a5a/RES-0000/10095355 | 2025-09-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/294947; ariregister:10095355 | 1996-11-26 | https://ariregister.rik.ee/est/company/10095355 One tender reported: Rule not met; ; ; e576ac9c-d677-49d8-9dc5-e69960995a5a/RES-0000/10095355 | 2025-09-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/294947 Repeated recorded procedures: Unknown; ; ; On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
e576ac9c-d677-49d8-9dc5-e69960995a5a/RES-0000/10095355 · 2025-09-15
ariregister:10095355 · 1996-11-26
e576ac9c-d677-49d8-9dc5-e69960995a5a/RES-0000/10095355 · 2025-09-15
Showing 10 / 26
Source: Riigihangete register · Riigihangete register: Source observation date unknown · Source acquisition date unknown · Snapshot published: 17.11.2026 · View company sources · All sources and licences
What changed in the company history (snapshot 17.11.2026)?
ABB Aktsiaselts: the timeline shows historical events, not an assessment of current status (source: Äriregister, EMTA, Ametlikud Teadaanded, RAR; snapshot: 17.11.2026).
2019
- Division: related company Hitachi Energy Estonia AS (14838818)
2011
- Share capital changed: 25985000.0 EEK → €1,663,040
2003
- Share capital changed: 20985000.0 EEK → 25985000.0 EEK
- Merger: related company 10485820
2001
- Share capital changed: 8000000.0 EEK → 20985000.0 EEK
- Merger: related company 10010212
- Merger: related company 10010011
2000
- Name changed: ABB Eesti Aktsiaselts → ABB Aktsiaselts
1997
- Share capital changed: 2000000.0 EEK → 8000000.0 EEK
1996
- Entered in the business register
Showing 10 / 33
Events: 33 · newest first · Sources: Business Register, Tax Board, RTK, Official Notices
Which sources supply the data (snapshot 17.11.2026)?
ABB Aktsiaselts: displayed source records 9 (source: Äriregister, EMTA, RTK, MTR, Keskkonnaamet, Ametlikud Teadaanded, Riigi kinnisvararegister, Riigihangete register, RIK laevakinnistusraamat; snapshot: 17.11.2026).
↔ Scroll horizontally to see all columns.
| Block | Source | Licence | Expected cadence | Source observation | Snapshot | Checked | Official record |
|---|---|---|---|---|---|---|---|
| Business Register | Äriregister | CC BY 4.0 | nightly | Source observation date unknown | 17.11.2026 07:45 | 17.11.2026 | open ↗ |
| Taxes | EMTA | CC BY-SA 3.0 | quarterly tax figures / daily debt list | Debt list observed: 16.11.2026 · daily debt list | 17.11.2026 07:45 | 17.11.2026 | open ↗ |
| Grants | RTK | CC BY-SA 3.0 (Euroopa Liidu struktuuritoetus). RAR: AvTS § 3¹ lg 9. | missing | Source observation date unknown | 17.11.2026 07:45 | 17.11.2026 | open ↗ |
| Licences | MTR | CC BY-SA 3.0 | missing | Source observation date unknown | 17.11.2026 07:45 | 17.11.2026 | open ↗ |
| Licences | Keskkonnaamet | AvTS § 3¹ lg 9 | missing | Source observation date unknown | 17.11.2026 07:45 | 17.11.2026 | open ↗ |
| Announcements | Ametlikud Teadaanded | CC BY-SA 4.0 | nightly | Latest retained notice published: 16.11.2026 · Source observation date unknown | 17.11.2026 07:45 | 17.11.2026 | open ↗ |
| State property | Riigi kinnisvararegister | CC0 1.0 | missing | Source observation date unknown | 17.11.2026 07:45 | 17.11.2026 | open ↗ |
| Public procurement | Riigihangete register | CC BY-SA 3.0 | nightly | Source observation date unknown | 17.11.2026 07:45 | 17.11.2026 | open ↗ |
| missing | RIK laevakinnistusraamat | CC BY-SA 4.0 | missing | Source observation date unknown | missing | missing | open ↗ |
| Court decisions, trademarks, sanctions | source missing — a company-level link has not been published yet; this does not mean there are no records | ||||||
Dates and their basis
Source observation is the source’s own as-of date; the latest notice publication does not prove observation. Snapshot is the data extract publication time. Checked is the source availability check. Missing clocks are not inferred from other dates.