Inseneribüroo Urmas Nugin OÜ
In the registerRegistry code: 10696600
INSENERIBÜROO URMAS NUGIN OÜ: 2025 revenue 682,515 €, net profit -47,456 € (Company only). 15 employees, 2025 annual average (Company only). Äriregister. Snapshot: 20.11.2026.
- Current tax-debt statusListed: 12,118.63 €EMTA. Observation: 19.11.2026
History
History: first seen 13.10.2026; Oldest debt: 12.10.2026; last seen 19.11.2026; peak debt 12,118.63 €; 36 days on the list. Public signals - Report 2025FiledÄriregisterCompany only
- NoticesNo warning noticesAmetlikud Teadaanded. Observation: 19.11.2026
- Revenue 2025682,515 ۀriregisterCompany only
- Employees 202515Äriregisterannual average; Company only
Place in the peer group
EMTAK 7112, Tartu County, 2025
Revenue 2025, company only, n = 74 filed reports
marker = company, band = p25–p75, axis = percentile 0–100
| Metric | Company | Median | Percentile |
|---|---|---|---|
| Revenue | 682,515 € | 23,873 € | p100 (n = 74) |
| Net profit | -47,456 € | 681 € | p1 (n = 93) |
| Equity | 138,552 € | 18,515 € | p92 (n = 93) |
| Employees | 15 | 0 | p100 (n = 93) |
Each percentile is computed separately, so n differs; hidden below 5 companies; medians and quartiles in whole euros (rounded). Source: Business Register (annual reports), snapshot 20.11.2026.
Not an official extract; no credit rating is provided.
Register details and contacts
- Registered name
- INSENERIBÜROO URMAS NUGIN OÜ
- Registry code
- 10696600
- Status
- in the register (R)
- Legal form
- Private limited company
- Registered
- 20.11.2000
- Share capital
- 2,556 €
- VAT number
- EE100655478
- Address
- Tartu County · Tartu linn, Spektri tn 6
- Website
- ibun.ee
- Phone
- +372 7303735
Source: Business Register (open data), CC BY 4.0
Names of current board members load in the interactive view.
Report coverage
Annual reports found in our data as of 2026-11-20
Cohort: R-status OÜs registered before 2023, with a 31 December fiscal year end. Years 2024 and 2025 are fixed, independent of the financial benchmark year. Sector and county use current principal company details.
Absence from our data is not evidence of non-filing. Each company counts once per year, including zero or missing revenue. Completeness of national coverage is unknown.
Source extract cutoff: 2026-10-31
↔ Scroll horizontally to see all columns.
| Fiscal year | Data status |
|---|---|
| 2024 | Found in data |
| 2025 | Found in data |
INSENERIBÜROO URMAS NUGIN OÜ is a private limited company. In 2025, revenue fell 9 % to 682,515 €, profit was -47,456 € (previous year 80,731 €). The main activity is Engineering activities and related technical consultancy (7112). The company is located in Tartu County. Registered 20.11.2000. Share capital is 2,556 €. 2025 annual-report figures (Company only): annual average employees 15. Taxes for III quarter of 2026 were 72,182 €. The company is on the tax debtors list. Tax debt is 12,118.63 €. EMTA. Observation: 19.11.2026. History: first seen 13.10.2026; Oldest debt: 12.10.2026; last seen 19.11.2026; peak debt 12,118.63 €; 36 days on the list. EMTA. Snapshot: 20.11.2026. There are 5 state aid and grant records. There are 6 activity-licence records (including history). There are 18 single-winner procurement wins (2023–2026); recorded contract/framework ceiling value 7,444,290 €, not actual payments. Shared-award ceilings are recorded separately and are not added to this company total.
What are the company indicators (2025)?
INSENERIBÜROO URMAS NUGIN OÜ: revenue 682,515 € (period: 2025; company only; source: Äriregister; snapshot: 20.11.2026).
Annual-report figures: Company only Tax data refers to this legal entity.
Peer group: 7112 · Tartu County · 2025 · n = 74
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Revenue2019 – 2025 | 682,515 € | -9 % | p100 (n = 74) | 2025; Company only | RIK | checked 21.11.2026 | -9 %p100 (n = 74)2025; Company onlyRIKchecked 21.11.2026 |
| Net profit2019 – 2025 | -47,456 € | -158.8 % | p1 (n = 93) | 2025 · margin -7 % (previous year 10.8 %); Company only | RIK | checked 21.11.2026 | -158.8 %p1 (n = 93)2025 · margin -7 % (previous year 10.8 %); Company onlyRIKchecked 21.11.2026 |
| Equity2019 – 2025 | 138,552 € | — | p92 (n = 93) | 2025 · share of assets 52.1 % (previous year 56 %); Company only | RIK | checked 21.11.2026 | p92 (n = 93)2025 · share of assets 52.1 % (previous year 56 %); Company onlyRIKchecked 21.11.2026 |
| Employees2019 – 2025 | 15 | — | p100 (n = 93) | 2025; Company only | RIK | checked 21.11.2026 | p100 (n = 93)2025; Company onlyRIKchecked 21.11.2026 |
| Turnover per the Tax Board2022 I – 2026 III | 205,505 € | — | — | 2025 IV · VAT registered; Company only | MTA | checked 21.11.2026 | 2025 IV · VAT registered; Company onlyMTAchecked 21.11.2026 |
| State taxes2022 I – 2026 III | 79,908 € | — | — | 2025 IV; Company only | MTA | checked 21.11.2026 | 2025 IV; Company onlyMTAchecked 21.11.2026 |
| Labour taxes2022 I – 2026 III | 47,211 € | — | — | 2025 IV; Company only | MTA | checked 21.11.2026 | 2025 IV; Company onlyMTAchecked 21.11.2026 |
| State aid and grants | 37,969.6 € | — | — | 4 decisions and 1 projects | RAR, RTK | snapshot 20.11.2026 | 4 decisions and 1 projectsRAR, RTKsnapshot 20.11.2026 |
| Report 2025 | filed | — | — | — | RIK | checked 21.11.2026 | RIKchecked 21.11.2026 |
EMTA: state taxes are paid taxes net of refunds; labour taxes are paid income and social tax plus pension and unemployment insurance contributions.
The percentile (p) is the company rank among peers in the same activity and county in the same year. It is hidden when fewer than 5 companies qualify. Each figure shows its period and source.
Which legal entities are related to the company (snapshot 20.11.2026)?
INSENERIBÜROO URMAS NUGIN OÜ: ownership links are between legal entities only; shared-board links show companies, not people (source: Äriregister; snapshot: 20.11.2026).
Dated register facts. No signals does not confirm the absence of liabilities.
Owners and holdings
Business Register shareholders · Natural-person owners are hidden, so the percentages may stay below 100 %.
State property contracts
Fees exclude VAT; currency is unknown. Each fee has its own period. Never sum or annualise fees. Types and statuses are source assertions; this is not a general property ownership register.
Rows on this page / total records: 0 / 0
No state property contracts in this snapshot.
Companies sharing a board member
Source: Äriregister · Riigi kinnisvararegister · Äriregister: Source observation date unknown · Riigi kinnisvararegister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 20.11.2026 · View company sources · All sources and licences
What are the company signals (snapshot 20.11.2026)?
we count and cite; we do not gradeINSENERIBÜROO URMAS NUGIN OÜ: The company is on the tax debtors list. Tax debt is 12,118.63 €. EMTA. Observation: 19.11.2026. History: first seen 13.10.2026; Oldest debt: 12.10.2026; last seen 19.11.2026; peak debt 12,118.63 €; 36 days on the list. EMTA. Snapshot: 20.11.2026.
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Current tax-debt status | The company is on the tax debtors list. Tax debt is 12,118.63 €. EMTA. Observation: 19.11.2026.Check directly: EMTA | — | — | Disputed 0 €; Scheduled 12,118.63 €; payment schedule until 31.05.2027; debts under 100 € are not published | EMTA | 19.11.2026 | Disputed 0 €; Scheduled 12,118.63 €; payment schedule until 31.05.2027; debts under 100 € are not publishedEMTA19.11.2026 |
| Debt episode (history)Oct 2026 – Nov 2026 | History: first seen 13.10.2026; Oldest debt: 12.10.2026; last seen 19.11.2026; peak debt 12,118.63 €; 36 days on the list. | — | — | New on list 13.10.2026; off the list after 3 consecutive absences (EMTA ~11th/~21st swings) | EMTA | 19.11.2026 | New on list 13.10.2026; off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTA19.11.2026 |
| Annual reports | Report 2025 filed | — | — | — | RIK | checked 21.11.2026 | RIKchecked 21.11.2026 |
| Official notices | No bankruptcy, liquidation, restructuring or enforcement notices | — | — | 5 years | Ametlikud Teadaanded | checked 21.11.2026 | 5 yearsAmetlikud Teadaandedchecked 21.11.2026 |
| Status | Status changes: 1 | — | — | status history: 4 entries | RIK | checked 21.11.2026 | status history: 4 entriesRIKchecked 21.11.2026 |
| Composite signal (derived) | Moderateview14.10.2026 10:15 – 12.11.2026 10:15Risk rising 12.11.2026 · +15 | — | — | Report lateness is not scored. Notice selection and time windows differ from those used for the score. | Ärikratt | — | Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt |
| Commercial pledge | No commercial pledge | — | — | pledgee names withheld | RIK | checked 21.11.2026 | pledgee names withheldRIKchecked 21.11.2026 |
| Court decisions · sanctions · trademarks | source missing | — | — | a company-level link has not been published yet | — | — | a company-level link has not been published yet |
Composite signal components (derived, not an official score)
Score (derived) 25/100 derived
A composite signal from structured data, not an official assessment or credit rating. It describes data known at calculation time; no forecast horizon is specified.
Calculated 19.11.2026 10:15.
Methodology version: 1.3.
Stored component contributions
- Tax debt · 15 points
View stored evidence
Stored contribution: 15 points.
- Financial health · 10 points
View stored evidence
Stored contribution: 10 points.
- Board changes · 0 points
- Insolvency notices · 0 points
- Licence loss · 0 points
A stored 0 proves neither absence of events nor complete source coverage. Without detail, its cause is unknown.
The underlying record reference is unavailable. No specific event or document can be identified.
methodologyCalculated 19.11.2026 10:15. The score is not a credit rating and not a default forecast. methodology · The score is not a credit rating
Snapshot: Äriregister: 20.11.2026 07:45 · EMTA: 20.11.2026 07:45 · Ametlikud Teadaanded: 20.11.2026 07:45
What are the company financial results (2025)?
INSENERIBÜROO URMAS NUGIN OÜ: net profit -47,456 € (period: 2025; company only; source: Äriregister; snapshot: 20.11.2026).
2025 · Company only: revenue 682,515 €, net profit -47,456 €.
Annual reports 2019–2025
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|
| Revenue | 682,515 € | -9 % | 2025; Company only | RIK | checked 21.11.2026 | -9 %2025; Company onlyRIKchecked 21.11.2026 |
| Net profit | -47,456 € | -158.8 % | 2025; Company only | RIK | checked 21.11.2026 | -158.8 %2025; Company onlyRIKchecked 21.11.2026 |
| Equity | 138,552 € | -25.5 % | 2025; Company only | RIK | checked 21.11.2026 | -25.5 %2025; Company onlyRIKchecked 21.11.2026 |
| Assets | 265,886 € | -20 % | 2025; Company only | RIK | checked 21.11.2026 | -20 %2025; Company onlyRIKchecked 21.11.2026 |
| Employees | 15 | +7.1 % | 2025; Company only | RIK | checked 21.11.2026 | +7.1 %2025; Company onlyRIKchecked 21.11.2026 |
| Revenue | 749,886 € | +7.2 % | 2024; Company only | RIK | checked 21.11.2026 | +7.2 %2024; Company onlyRIKchecked 21.11.2026 |
| Net profit | 80,731 € | — | 2024; Company only | RIK | checked 21.11.2026 | 2024; Company onlyRIKchecked 21.11.2026 |
| Equity | 186,008 € | +74.9 % | 2024; Company only | RIK | checked 21.11.2026 | +74.9 %2024; Company onlyRIKchecked 21.11.2026 |
| Assets | 332,420 € | +53.9 % | 2024; Company only | RIK | checked 21.11.2026 | +53.9 %2024; Company onlyRIKchecked 21.11.2026 |
| Employees | 14 | 0 % | 2024; Company only | RIK | checked 21.11.2026 | 0 %2024; Company onlyRIKchecked 21.11.2026 |
| Revenue | 699,409 € | +22.2 % | 2023; Company only | RIK | checked 21.11.2026 | +22.2 %2023; Company onlyRIKchecked 21.11.2026 |
| Net profit | -10,125 € | +35.1 % | 2023; Company only | RIK | checked 21.11.2026 | +35.1 %2023; Company onlyRIKchecked 21.11.2026 |
| Equity | 106,330 € | -8.7 % | 2023; Company only | RIK | checked 21.11.2026 | -8.7 %2023; Company onlyRIKchecked 21.11.2026 |
| Assets | 215,939 € | -14.7 % | 2023; Company only | RIK | checked 21.11.2026 | -14.7 %2023; Company onlyRIKchecked 21.11.2026 |
| Employees | 14 | 0 % | 2023; Company only | RIK | checked 21.11.2026 | 0 %2023; Company onlyRIKchecked 21.11.2026 |
| Revenue | 572,208 € | -3.3 % | 2022; Company only | RIK | checked 21.11.2026 | -3.3 %2022; Company onlyRIKchecked 21.11.2026 |
| Net profit | -15,599 € | -120.1 % | 2022; Company only | RIK | checked 21.11.2026 | -120.1 %2022; Company onlyRIKchecked 21.11.2026 |
| Equity | 116,455 € | -13.2 % | 2022; Company only | RIK | checked 21.11.2026 | -13.2 %2022; Company onlyRIKchecked 21.11.2026 |
| Assets | 253,104 € | -7.1 % | 2022; Company only | RIK | checked 21.11.2026 | -7.1 %2022; Company onlyRIKchecked 21.11.2026 |
| Employees | 14 | +16.7 % | 2022; Company only | RIK | checked 21.11.2026 | +16.7 %2022; Company onlyRIKchecked 21.11.2026 |
| Revenue | 591,586 € | +38 % | 2021; Company only | RIK | checked 21.11.2026 | +38 %2021; Company onlyRIKchecked 21.11.2026 |
| Net profit | 77,599 € | — | 2021; Company only | RIK | checked 21.11.2026 | 2021; Company onlyRIKchecked 21.11.2026 |
| Equity | 134,128 € | +136.4 % | 2021; Company only | RIK | checked 21.11.2026 | +136.4 %2021; Company onlyRIKchecked 21.11.2026 |
| Assets | 272,435 € | +47.3 % | 2021; Company only | RIK | checked 21.11.2026 | +47.3 %2021; Company onlyRIKchecked 21.11.2026 |
| Employees | 12 | 0 % | 2021; Company only | RIK | checked 21.11.2026 | 0 %2021; Company onlyRIKchecked 21.11.2026 |
| Revenue | 428,605 € | +13.4 % | 2020; Company only | RIK | checked 21.11.2026 | +13.4 %2020; Company onlyRIKchecked 21.11.2026 |
| Net profit | 5,661 € | -37.9 % | 2020; Company only | RIK | checked 21.11.2026 | -37.9 %2020; Company onlyRIKchecked 21.11.2026 |
| Equity | 56,747 € | -50.9 % | 2020; Company only | RIK | checked 21.11.2026 | -50.9 %2020; Company onlyRIKchecked 21.11.2026 |
| Assets | 184,969 € | +2.3 % | 2020; Company only | RIK | checked 21.11.2026 | +2.3 %2020; Company onlyRIKchecked 21.11.2026 |
| Employees | 12 | 0 % | 2020; Company only | RIK | checked 21.11.2026 | 0 %2020; Company onlyRIKchecked 21.11.2026 |
| Revenue | 377,937 € | — | 2019; Company only | RIK | checked 21.11.2026 | 2019; Company onlyRIKchecked 21.11.2026 |
| Net profit | 9,110 € | — | 2019; Company only | RIK | checked 21.11.2026 | 2019; Company onlyRIKchecked 21.11.2026 |
| Equity | 115,506 € | — | 2019; Company only | RIK | checked 21.11.2026 | 2019; Company onlyRIKchecked 21.11.2026 |
| Assets | 180,836 € | — | 2019; Company only | RIK | checked 21.11.2026 | 2019; Company onlyRIKchecked 21.11.2026 |
| Employees | 12 | — | 2019; Company only | RIK | checked 21.11.2026 | 2019; Company onlyRIKchecked 21.11.2026 |
Source: Äriregister · Latest available report year: 2025 (annual reporting) · Äriregister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 20.11.2026 · View company sources · All sources and licences
How much tax did the company pay (2026 III)?
INSENERIBÜROO URMAS NUGIN OÜ: state taxes 72,182 € (period: 2026 III; company only; source: EMTA; snapshot: 20.11.2026).
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Quarterly declared turnover (EMTA) | 185,906 € | — | — | 2026 III; Company only | EMTA | checked 21.11.2026 | 2026 III; Company onlyEMTAchecked 21.11.2026 |
| State taxes | 72,182 € | — | — | 2026 III; Company only | EMTA | checked 21.11.2026 | 2026 III; Company onlyEMTAchecked 21.11.2026 |
| Labour taxes | 39,582 € | — | — | 2026 III; Company only | EMTA | checked 21.11.2026 | 2026 III; Company onlyEMTAchecked 21.11.2026 |
| Employees (EMTA quarter, legal entity) | 15 | — | — | 2026 III; Company only | EMTA | checked 21.11.2026 | 2026 III; Company onlyEMTAchecked 21.11.2026 |
| Quarter | Quarterly declared turnover (EMTA) (€) | State taxes € | Labour taxes € | Employees (EMTA quarter, legal entity) |
|---|---|---|---|---|
| 2026 III | 185,906 | 72,182 | 39,582 | 15 |
| 2026 II | 135,594 | 54,187 | 41,082 | 15 |
| 2026 I | 193,758 | 67,389 | 39,384 | 15 |
| 2025 IV | 205,505 | 79,908 | 47,211 | 15 |
| 2025 III | 153,606 | 62,236 | 46,914 | 15 |
| 2025 II | 125,752 | 67,107 | 54,995 | 15 |
| 2025 I | 263,452 | 83,731 | 47,104 | 17 |
| 2024 IV | 223,744 | 74,759 | 43,384 | 15 |
| 2024 III | 96,148 | 47,021 | 39,695 | 15 |
| 2024 II | 165,666 | 61,021 | 38,413 | 14 |
Showing 10 / 19
Source: EMTA · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 19.11.2026 (daily debt list) · Older than the expected daily observation (checked: 21.11.2026) · EMTA: Debt list observed: 19.11.2026 · daily debt list · Older than the expected daily observation (checked: 21.11.2026) · Source acquisition date unknown · Snapshot published: 20.11.2026 · View company sources · All sources and licences
What state aid has the company received (snapshot 20.11.2026)?
INSENERIBÜROO URMAS NUGIN OÜ: displayed state aid decisions and project grants 5 (source: RAR, RTK; snapshot: 20.11.2026).
Tallinna Tehnikaülikool · Nõustamine VTA >> Nõustamine VTA · 02.03.2026
Amount €: 880
Incorporated < 90 days before decision: Rule not met; ; ; state_aid:81769 | 2026-03-02 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
Riigi Tugiteenuste Keskus · Muu >> Muu · 31.03.2025
Amount €: 18,296
Incorporated < 90 days before decision: Rule not met; ; ; state_aid:72826 | 2025-03-31 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu · 23.08.2022
Amount €: 44
Incorporated < 90 days before decision: Rule not met; ; ; state_aid:8851 | 2022-08-23 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
Eesti Töötukassa · Muu >> Muu · 10.08.2022
Amount €: 453.6
Incorporated < 90 days before decision: Rule not met; ; ; state_aid:9295 | 2022-08-10 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
Ettevõtte põhiprotsessi (projekteerimine) kaasajastamine läbi tehisintellekti sisaldava BIM tarkvara kasutuselevõtu · 31.12.2024
Amount €: 18,296
Unknown Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
Observed ship-register entries
Owner entry in the register, may not be current owner. Current ownership is unverified. Separate revisions are separate entries, not additional vessels. Type and use retain the source wording.
No observed entries for open ships in this snapshot.
Source: Centre of Registers and Information Systems, ship register · Licence: CC BY-SA 4.0 · RIK Laev.xml, CC BY-SA 4.0 · Registrite ja Infosüsteemide Keskus (RIK) · Data catalogue
Environmental records
Source presence and source status do not confirm permit validity. Emission sources and waste facilities are separate record types. Record counts are not an environmental footprint or pollution quantities. Location is unknown.
No environmental records in this snapshot.
Source: RTK · MTR · Keskkonnaamet · RTK: Source observation date unknown · MTR: Source observation date unknown · Keskkonnaamet: Source observation date unknown · Source acquisition date unknown · Snapshot published: 20.11.2026 · View company sources · All sources and licences
What procurement has the company won (snapshot 20.11.2026)?
INSENERIBÜROO URMAS NUGIN OÜ: procurement wins 18 (source: Riigihangete register; snapshot: 20.11.2026).
Won a tender. The company has won a public tender, 18 wins.
Informational indicators, not accusations or proof of wrongdoing. Free CSV exports the loaded rows. Load more to include further results.
Kopraraja õpperaja ja Kuuraniidu õpperaja rekontrueerimise projekteerimistööd · 25.09.2026
Incorporated < 90 days before decision: Rule not met; ; ; 7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Rule not met; ; ; 7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-09-25; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 195361ac-3f1b-48e8-9684-10d90eebe702/c965901f-ba7e-4cc9-82a5-0d4e3704165f/RES-0000/TEN-0007/10696600 | 2024-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274863; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/TEN-0001/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/TEN-0002/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 44d64419-4e8e-4b38-a371-af591865ddbf/f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/TEN-0001/10696600 | 2025-07-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296846; 63b72728-2ee6-44ab-b4c0-8cff02bbe9ac/98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/TEN-0001/10696600 | 2025-03-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288852; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0005/10696600 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0003/TEN-0004/10696600 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 8983646d-3d5b-4d46-bfda-13c86295283b/78f13ad1-3d13-43b5-a49f-82dbaa5a349d/RES-0001/TEN-0002/10696600 | 2023-09-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/268441; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0008/10696600 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/10696600 · 2026-09-25
ariregister:10696600 · 2000-11-20
7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/10696600 · 2026-09-25
Kopraraja õpperaja ja Kuuraniidu õpperaja rekontrueerimise projekteerimistööd · 25.09.2026
Incorporated < 90 days before decision: Rule not met; ; ; 7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Rule not met; ; ; 7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-09-25; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 195361ac-3f1b-48e8-9684-10d90eebe702/c965901f-ba7e-4cc9-82a5-0d4e3704165f/RES-0000/TEN-0007/10696600 | 2024-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274863; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/TEN-0001/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/TEN-0002/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 44d64419-4e8e-4b38-a371-af591865ddbf/f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/TEN-0001/10696600 | 2025-07-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296846; 63b72728-2ee6-44ab-b4c0-8cff02bbe9ac/98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/TEN-0001/10696600 | 2025-03-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288852; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0005/10696600 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0003/TEN-0004/10696600 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 8983646d-3d5b-4d46-bfda-13c86295283b/78f13ad1-3d13-43b5-a49f-82dbaa5a349d/RES-0001/TEN-0002/10696600 | 2023-09-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/268441; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0008/10696600 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/10696600 · 2026-09-25
ariregister:10696600 · 2000-11-20
7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/10696600 · 2026-09-25
Riigi poolt korras hoitavate ühiseesvoolude projekteerimistööd (I piiratud hankemenetlus) · 07.05.2026
Incorporated < 90 days before decision: Rule not met; ; ; 826cdd29-ef79-400b-a798-3858b8a573db/RES-0000/10696600 | 2026-05-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306873; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Rule not met; ; ; 826cdd29-ef79-400b-a798-3858b8a573db/RES-0000/10696600 | 2026-05-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306873 Repeated recorded procedures: Unknown; ; ; On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
826cdd29-ef79-400b-a798-3858b8a573db/RES-0000/10696600 · 2026-05-07
ariregister:10696600 · 2000-11-20
826cdd29-ef79-400b-a798-3858b8a573db/RES-0000/10696600 · 2026-05-07
Teede projekteerimistööd 2026-2030 · 20.04.2026
Incorporated < 90 days before decision: Rule not met; ; ; 4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/10696600 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Rule not met; ; ; 4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/10696600 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-09-25; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 195361ac-3f1b-48e8-9684-10d90eebe702/c965901f-ba7e-4cc9-82a5-0d4e3704165f/RES-0000/TEN-0007/10696600 | 2024-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274863; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/TEN-0001/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/TEN-0002/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 44d64419-4e8e-4b38-a371-af591865ddbf/f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/TEN-0001/10696600 | 2025-07-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296846; 63b72728-2ee6-44ab-b4c0-8cff02bbe9ac/98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/TEN-0001/10696600 | 2025-03-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288852; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0005/10696600 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0003/TEN-0004/10696600 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 8983646d-3d5b-4d46-bfda-13c86295283b/78f13ad1-3d13-43b5-a49f-82dbaa5a349d/RES-0001/TEN-0002/10696600 | 2023-09-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/268441; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0008/10696600 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/10696600 · 2026-04-20
ariregister:10696600 · 2000-11-20
4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/10696600 · 2026-04-20
Põltsamaa jõe eraldamine Ao II paisjärvest projekteerimistööd · 27.10.2025
Incorporated < 90 days before decision: Rule not met; ; ; 6dca57e2-f20b-4e1f-8dce-40c28d81b776/RES-0000/10696600 | 2025-10-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298339; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Indicator present; ; ; 6dca57e2-f20b-4e1f-8dce-40c28d81b776/RES-0000/10696600 | 2025-10-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298339 Repeated recorded procedures: Indicator present; Distinct procedures: 2; Retained award dates: 2023-12-04 – 2025-10-27; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 5712dd2e-1dc3-4c8f-a655-3f146ba9810a/6dca57e2-f20b-4e1f-8dce-40c28d81b776/RES-0000/TEN-0001/10696600 | 2025-10-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298339; ad1320d3-6acd-42ba-af32-9204a17f28f5/263ce3e6-c5da-4abc-b1c6-abec3553c883/RES-0000/TEN-0001/10696600 | 2023-12-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270337 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
6dca57e2-f20b-4e1f-8dce-40c28d81b776/RES-0000/10696600 · 2025-10-27
ariregister:10696600 · 2000-11-20
6dca57e2-f20b-4e1f-8dce-40c28d81b776/RES-0000/10696600 · 2025-10-27
Siia ja harjuse kasvatustiikide ja taristu projekti koostamine · 16.07.2025
Incorporated < 90 days before decision: Rule not met; ; ; f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/10696600 | 2025-07-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296846; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Indicator present; ; ; f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/10696600 | 2025-07-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296846 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-09-25; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 195361ac-3f1b-48e8-9684-10d90eebe702/c965901f-ba7e-4cc9-82a5-0d4e3704165f/RES-0000/TEN-0007/10696600 | 2024-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274863; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/TEN-0001/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/TEN-0002/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 44d64419-4e8e-4b38-a371-af591865ddbf/f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/TEN-0001/10696600 | 2025-07-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296846; 63b72728-2ee6-44ab-b4c0-8cff02bbe9ac/98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/TEN-0001/10696600 | 2025-03-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288852; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0005/10696600 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0003/TEN-0004/10696600 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 8983646d-3d5b-4d46-bfda-13c86295283b/78f13ad1-3d13-43b5-a49f-82dbaa5a349d/RES-0001/TEN-0002/10696600 | 2023-09-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/268441; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0008/10696600 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/10696600 · 2025-07-16
ariregister:10696600 · 2000-11-20
f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/10696600 · 2025-07-16
Tammikuääre tee 2025 uurimustöö ja ehitusprojekti koostamine · 05.05.2025
Incorporated < 90 days before decision: Rule not met; ; ; 47bc8f2a-2934-43bf-9ae0-1e8f5a71482f/RES-0000/10696600 | 2025-05-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/293194; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Rule not met; ; ; 47bc8f2a-2934-43bf-9ae0-1e8f5a71482f/RES-0000/10696600 | 2025-05-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/293194 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2025-05-05 – 2025-05-05; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 730023bf-4a07-4542-b796-c3f1734f8cc6/47bc8f2a-2934-43bf-9ae0-1e8f5a71482f/RES-0000/TEN-0001/10696600 | 2025-05-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/293194 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
47bc8f2a-2934-43bf-9ae0-1e8f5a71482f/RES-0000/10696600 · 2025-05-05
ariregister:10696600 · 2000-11-20
47bc8f2a-2934-43bf-9ae0-1e8f5a71482f/RES-0000/10696600 · 2025-05-05
Kasari jõestiku jõgede füüsilise kvaliteedi parandamise projekteerimine · 17.03.2025
Incorporated < 90 days before decision: Rule not met; ; ; 98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/10696600 | 2025-03-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288852; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Rule not met; ; ; 98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/10696600 | 2025-03-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288852 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-09-25; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 195361ac-3f1b-48e8-9684-10d90eebe702/c965901f-ba7e-4cc9-82a5-0d4e3704165f/RES-0000/TEN-0007/10696600 | 2024-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274863; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/TEN-0001/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/TEN-0002/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 44d64419-4e8e-4b38-a371-af591865ddbf/f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/TEN-0001/10696600 | 2025-07-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296846; 63b72728-2ee6-44ab-b4c0-8cff02bbe9ac/98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/TEN-0001/10696600 | 2025-03-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288852; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0005/10696600 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0003/TEN-0004/10696600 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 8983646d-3d5b-4d46-bfda-13c86295283b/78f13ad1-3d13-43b5-a49f-82dbaa5a349d/RES-0001/TEN-0002/10696600 | 2023-09-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/268441; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0008/10696600 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/10696600 · 2025-03-17
ariregister:10696600 · 2000-11-20
98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/10696600 · 2025-03-17
Alajõe kogukonnamaja külastustaristu projekteerimine · 18.10.2024
Incorporated < 90 days before decision: Rule not met; ; ; 04750d4f-d8aa-465a-89a5-ddc1363282c2/RES-0000/10696600 | 2024-10-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283350; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Rule not met; ; ; 04750d4f-d8aa-465a-89a5-ddc1363282c2/RES-0000/10696600 | 2024-10-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283350 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2024-10-18 – 2024-10-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 682ced50-9d81-46aa-8139-cc6c130354bb/04750d4f-d8aa-465a-89a5-ddc1363282c2/RES-0000/TEN-0001/10696600 | 2024-10-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283350 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
04750d4f-d8aa-465a-89a5-ddc1363282c2/RES-0000/10696600 · 2024-10-18
ariregister:10696600 · 2000-11-20
04750d4f-d8aa-465a-89a5-ddc1363282c2/RES-0000/10696600 · 2024-10-18
Veekogudele rajatud paisudele kalade ja muude liikide rändevõimaluste tagamiseks vajalike ehitusprojektide koostamine · 19.09.2024
Incorporated < 90 days before decision: Rule not met; ; ; 9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/10696600 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; ariregister:10696600 | 2000-11-20 | https://ariregister.rik.ee/est/company/10696600 One tender reported: Rule not met; ; ; 9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/10696600 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-05-31 – 2026-09-25; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 195361ac-3f1b-48e8-9684-10d90eebe702/c965901f-ba7e-4cc9-82a5-0d4e3704165f/RES-0000/TEN-0007/10696600 | 2024-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274863; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0000/TEN-0001/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 22fdb5cf-30ec-422d-aa31-9ff51e4ad4f9/7a39a680-6787-46b6-9689-65a336a92bb0/RES-0001/TEN-0002/10696600 | 2026-09-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314552; 44d64419-4e8e-4b38-a371-af591865ddbf/f8bd0b52-71c1-4995-afee-7e0df90ba07d/RES-0000/TEN-0001/10696600 | 2025-07-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296846; 63b72728-2ee6-44ab-b4c0-8cff02bbe9ac/98d3f972-065f-4d04-85b1-12f1199ca422/RES-0000/TEN-0001/10696600 | 2025-03-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288852; 700fc896-ba4f-49ba-982e-11ff8d53855d/9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/TEN-0005/10696600 | 2024-09-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280629; 87e424f5-3bb8-49ff-b02b-99320d2715bb/7c49b8ec-98a1-496d-95be-e3800bee0998/RES-0003/TEN-0004/10696600 | 2023-05-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/259859; 8983646d-3d5b-4d46-bfda-13c86295283b/78f13ad1-3d13-43b5-a49f-82dbaa5a349d/RES-0001/TEN-0002/10696600 | 2023-09-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/268441; c1bdc7d7-1857-4a5a-9ce1-0c983ab720cf/4d55ec03-d352-4244-9dd2-e761f29f1c36/RES-0000/TEN-0008/10696600 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305271 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/10696600 · 2024-09-19
ariregister:10696600 · 2000-11-20
9bfa02fc-b970-408f-ac67-7f69a7ed4dc9/RES-0000/10696600 · 2024-09-19
Showing 10 / 21
Source: Riigihangete register · Riigihangete register: Source observation date unknown · Source acquisition date unknown · Snapshot published: 20.11.2026 · View company sources · All sources and licences
What changed in the company history (snapshot 20.11.2026)?
INSENERIBÜROO URMAS NUGIN OÜ: the timeline shows historical events, not an assessment of current status (source: Äriregister, EMTA, Ametlikud Teadaanded, RAR; snapshot: 20.11.2026).
2026
Reports, taxes and grants (4)
- Tax Board 2026 III: turnover €185.9k, employees: 15
- Tax Board 2026 II: turnover €135.6k, employees: 15
- Tax Board 2026 I: turnover €193.8k, employees: 15
- State aid decision: Tallinna Tehnikaülikool · Nõustamine VTA >> Nõustamine VTA, €880
2025
Reports, taxes and grants (1)
- Tax Board 2025 IV: turnover €205.5k, employees: 15
2011
- Share capital changed: 40000.0 EEK → €2,556
2000
- Entered in the business register
- Share capital changed: missing → 40000.0 EEK
- Name changed: missing → INSENERIBÜROO URMAS NUGIN OÜ
- Status changed: missing → in the register
Showing 10 / 28
Events: 28 · newest first · Sources: Business Register, Tax Board, RTK, Official Notices
Which sources supply the data (snapshot 20.11.2026)?
INSENERIBÜROO URMAS NUGIN OÜ: displayed source records 9 (source: Äriregister, EMTA, RTK, MTR, Keskkonnaamet, Ametlikud Teadaanded, Riigi kinnisvararegister, Riigihangete register, RIK laevakinnistusraamat; snapshot: 20.11.2026).
↔ Scroll horizontally to see all columns.
| Block | Source | Licence | Expected cadence | Source observation | Snapshot | Checked | Official record |
|---|---|---|---|---|---|---|---|
| Business Register | Äriregister | CC BY 4.0 | nightly | Source observation date unknown | 20.11.2026 07:45 | 21.11.2026 | open ↗ |
| Taxes | EMTA | CC BY-SA 3.0 | quarterly tax figures / daily debt list | Debt list observed: 19.11.2026 · daily debt list · Older than the expected daily observation (checked: 21.11.2026) | 20.11.2026 07:45 | 21.11.2026 | open ↗ |
| Grants | RTK | CC BY-SA 3.0 (Euroopa Liidu struktuuritoetus). RAR: AvTS § 3¹ lg 9. | missing | Source observation date unknown | 20.11.2026 07:45 | 21.11.2026 | open ↗ |
| Licences | MTR | CC BY-SA 3.0 | missing | Source observation date unknown | 20.11.2026 07:45 | 21.11.2026 | open ↗ |
| Licences | Keskkonnaamet | AvTS § 3¹ lg 9 | missing | Source observation date unknown | 20.11.2026 07:45 | 21.11.2026 | open ↗ |
| Announcements | Ametlikud Teadaanded | CC BY-SA 4.0 | nightly | Latest retained notice published: 19.11.2026 · Source observation date unknown | 20.11.2026 07:45 | 21.11.2026 | open ↗ |
| State property | Riigi kinnisvararegister | CC0 1.0 | missing | Source observation date unknown | 20.11.2026 07:45 | 21.11.2026 | open ↗ |
| Public procurement | Riigihangete register | CC BY-SA 3.0 | nightly | Source observation date unknown | 20.11.2026 07:45 | 21.11.2026 | open ↗ |
| missing | RIK laevakinnistusraamat | CC BY-SA 4.0 | missing | Source observation date unknown | missing | missing | open ↗ |
| Court decisions, trademarks, sanctions | source missing — a company-level link has not been published yet; this does not mean there are no records | ||||||
Dates and their basis
Source observation is the source’s own as-of date; the latest notice publication does not prove observation. Snapshot is the data extract publication time. Checked is the source availability check. Missing clocks are not inferred from other dates.