Terasteenus OÜ

In the registerRegistry code: 10943961

TERASTEENUS OÜ: 2025 revenue 19,075,405 €, net profit 543,659 € (Consolidated group). 59 employees, 2025 annual average (Consolidated group). Äriregister. Snapshot: 10.11.2026.

  • Current tax-debt statusNot listedEMTA. Observation: 09.11.2026Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.
  • Report 2025FiledÄriregisterConsolidated group
  • NoticesNo warning noticesAmetlikud Teadaanded. Observation: 09.11.2026
  • Revenue 202519,075,405 €ÄriregisterConsolidated group
  • Employees 202559Äriregisterannual average; Consolidated group

Place in the peer group

EMTAK 42991, Tartu County, 2025

Revenue 2025, consolidated group, n = 67 filed reports

0100p25p50 (median)p7523,036 €70,464 €340,784 €TERASTEENUS OÜ19,075,405 €, p1000100p25medianp7523,036 €70,464 €340,784 €TERASTEENUS OÜ19,075,405 €, p100

marker = company, band = p25–p75, axis = percentile 0–100

The company against its peer group by metric, 2025 · Consolidated group
MetricCompanyMedianPer­cen­tile
Revenue19,075,405 €70,464 €p100 (n = 67)
Net profit543,659 €268 €p98 (n = 86)
Equity4,153,372 €23,091 €p100 (n = 86)
Employees591p100 (n = 88)

Each percentile is computed separately, so n differs; hidden below 5 companies; medians and quartiles in whole euros (rounded). Source: Business Register (annual reports), snapshot 10.11.2026.

Not an official extract; no credit rating is provided.

Register details and contacts
Registered name
TERASTEENUS OÜ
Registry code
10943961
Status
in the register (R)
Legal form
Private limited company
Registered
19.06.2003
Share capital
2,556 €
VAT number
EE100835793
Address
Tartu County · Kambja vald, Soinaste küla, Nupu tn 1

Source: Business Register (open data), CC BY 4.0

Former names / legal succession

Former names: OÜ BLANKOR TRADE

Business Register (open data)

Names of current board members load in the interactive view.

Report coverage

Annual reports found in our data as of 2026-11-10

Cohort: R-status OÜs registered before 2023, with a 31 December fiscal year end. Years 2024 and 2025 are fixed, independent of the financial benchmark year. Sector and county use current principal company details.

Absence from our data is not evidence of non-filing. Each company counts once per year, including zero or missing revenue. Completeness of national coverage is unknown.

Source extract cutoff: 2026-10-31

↔ Scroll horizontally to see all columns.

Report coverage
Fiscal yearData status
2024Found in data
2025Found in data
Äriregister · CC BY 4.0; calculations by Ärikratt2026-11-10

TERASTEENUS OÜ is a private limited company. The main activity is NACE class: Construction of other civil engineering projects n.e.c. (42991). The company is located in Tartu County. Registered 19.06.2003. Share capital is 2,556 €. 2025 annual-report figures (Consolidated group): revenue 19,075,405 €, profit 543,659 €, annual average employees 59. Taxes for III quarter of 2026 were 419,978 €. Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026. There are 4 state aid and grant records. There are 9 activity-licence records (including history). There are 82 single-winner procurement wins (2023–2026); recorded contract/framework ceiling value 27,905,482.55 €, not actual payments. Shared-award ceilings are recorded separately and are not added to this company total.

What are the company indicators (2025)?

TERASTEENUS OÜ: revenue 19,075,405 € (period: 2025; consolidated group; source: Äriregister; snapshot: 10.11.2026).

#naitajadSnapshot

Annual-report figures: Consolidated group Tax data refers to this legal entity.

Reporting basis: Consolidated group

Consolidated reports include subsidiaries. Different companies can report the same group activity; do not add these rows together.

Peer group: 42991 · Tartu County · 2025 · n = 67

↔ Scroll horizontally to see all columns.

Key figures
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
RevenueRevenue: 2019 to 2025, min 2019 · 3,936,633 €, max 2025 · 19,075,405 €, latest 2025 · 19,075,405 €2019 – 202519,075,405 €—p100 (n = 67)2025; Consolidated groupRIKchecked 10.11.2026Position: p100 (n = 67)2025; Consolidated groupRIKAs of: checked 10.11.2026
Net profitNet profit: 2019 to 2025, min 2019 · 379,022 €, max 2023 · 1,222,101 €, latest 2025 · 543,659 €2019 – 2025543,659 €—p98 (n = 86)2025 · margin 2.9 %; Consolidated groupRIKchecked 10.11.2026Position: p98 (n = 86)2025 · margin 2.9 %; Consolidated groupRIKAs of: checked 10.11.2026
EquityEquity: 2019 to 2025, min 2019 · 1,113,215 €, max 2025 · 4,153,372 €, latest 2025 · 4,153,372 €2019 – 20254,153,372 €—p100 (n = 86)2025 · share of assets 55.4 %; Consolidated groupRIKchecked 10.11.2026Position: p100 (n = 86)2025 · share of assets 55.4 %; Consolidated groupRIKAs of: checked 10.11.2026
EmployeesEmployees: 2019 to 2025, min 2019 · 32, max 2025 · 59, latest 2025 · 592019 – 202559—p100 (n = 88)2025; Consolidated groupRIKchecked 10.11.2026Position: p100 (n = 88)2025; Consolidated groupRIKAs of: checked 10.11.2026
Turnover per the Tax BoardTurnover per the Tax Board: 2022 I to 2026 III, min 2022 II · 1,783,765 €, max 2025 IV · 6,740,817 €, latest 2026 III · 4,082,482 €2022 I – 2026 III6,740,817 €——2025 IV · VAT registered; Company onlyMTAchecked 10.11.20262025 IV · VAT registered; Company onlyMTAAs of: checked 10.11.2026
State taxesState taxes: 2022 I to 2026 III, min 2022 III · 180,348 €, max 2025 IV · 652,493 €, latest 2026 III · 419,978 €2022 I – 2026 III652,493 €——2025 IV; Company onlyMTAchecked 10.11.20262025 IV; Company onlyMTAAs of: checked 10.11.2026
Labour taxesLabour taxes: 2022 I to 2026 III, min 2022 I · 94,081 €, max 2026 III · 245,285 €, latest 2026 III · 245,285 €2022 I – 2026 III242,285 €——2025 IV; Company onlyMTAchecked 10.11.20262025 IV; Company onlyMTAAs of: checked 10.11.2026
State aid received54,625.87 €——4 decisions · latest 2025RARsnapshot 10.11.20264 decisions · latest 2025RARAs of: snapshot 10.11.2026
Report 2025filed———RIKchecked 10.11.2026RIKAs of: checked 10.11.2026

EMTA: state taxes are paid taxes net of refunds; labour taxes are paid income and social tax plus pension and unemployment insurance contributions.

The percentile (p) is the company rank among peers in the same activity and county in the same year. It is hidden when fewer than 5 companies qualify. Each figure shows its period and source.

Which legal entities are related to the company (snapshot 10.11.2026)?

TERASTEENUS OÜ: ownership links are between legal entities only; shared-board links show companies, not people (source: Äriregister; snapshot: 10.11.2026).

#seosedSnapshot

Dated register facts. No signals does not confirm the absence of liabilities.

Owners and holdings

Business Register shareholders · Natural-person owners are hidden, so the percentages may stay below 100 %.

State property contracts

Fees exclude VAT; currency is unknown. Each fee has its own period. Never sum or annualise fees. Types and statuses are source assertions; this is not a general property ownership register.

Rows on this page / total records: 16 / 16

Download this page as CSV

Active (1)

State property contracts · Active
Contract codeContract type (source)Subtype (source)Company’s roleSource statusValid from (source)Valid until (source)Concluded on (source)Ended on (source)Source feeVAT applies (source)
HL26-2443Maintenance · HOOLDUSlammutus/ehitusReceiving partyActive2026-08-102026-12-10UnknownUnknownUnknown, currency unknown, period unknown, excluding VATNo (source assertion)

Ended (15)

State property contracts · Ended
Contract codeContract type (source)Subtype (source)Company’s roleSource statusValid from (source)Valid until (source)Concluded on (source)Ended on (source)Source feeVAT applies (source)
HL22-1172Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2022-04-072022-07-07Unknown2022-07-06Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL22-2455Maintenance · HOOLDUSmaaparandusReceiving partyEnded2022-07-112023-01-11Unknown2022-11-22Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL22-2456Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2022-07-112022-09-11Unknown2022-08-08Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL22-2457Maintenance · HOOLDUSmaaparandusReceiving partyEnded2022-07-112023-01-11Unknown2022-09-28Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL22-2549Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2022-07-192023-01-19Unknown2022-09-28Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL22-3772Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2022-11-172023-05-17Unknown2023-01-27Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL22-3776Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2022-11-172023-05-17Unknown2023-05-23Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL23-112Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2023-01-232023-05-23Unknown2023-06-20Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL23-2085Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2023-05-282023-07-28Unknown2023-07-06Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL23-230Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2023-01-182023-05-18Unknown2023-05-09Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL23-2431Maintenance · HOOLDUSmaaparandusReceiving partyEnded2023-06-262023-12-26Unknown2024-02-05Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL24-1071Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2024-03-162024-09-16Unknown2024-06-10Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL24-3028Maintenance · HOOLDUSmaaparandusReceiving partyEnded2024-09-042024-12-04Unknown2024-10-17Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL25-153Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2025-01-312025-04-30Unknown2025-03-25Unknown, currency unknown, period unknown, excluding VATNo (source assertion)
HL25-2654Maintenance · HOOLDUSlammutus/ehitusReceiving partyEnded2025-08-202025-10-20Unknown2025-10-27Unknown, currency unknown, period unknown, excluding VATNo (source assertion)

Source: Riigi kinnisvararegister · CC0 1.0

Companies sharing a board member

RIK

Same query via MCP

Source: Äriregister · Riigi kinnisvararegister · Äriregister: Source observation date unknown · Riigi kinnisvararegister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What are the company signals (snapshot 10.11.2026)?

we count and cite; we do not grade

TERASTEENUS OÜ: Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026.

#signaalidSnapshot

↔ Scroll horizontally to see all columns.

Public signals
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Current tax-debt statusNot on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.Check directly: EMTA ———EMTA09.11.2026EMTAAs of: 09.11.2026
Debt episode (history)missing——off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTA09.11.2026off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTAAs of: 09.11.2026
Annual reportsReport 2025 filed———RIKchecked 10.11.2026RIKAs of: checked 10.11.2026
Official noticesNo bankruptcy, liquidation, restructuring or enforcement notices——5 yearsAmetlikud Teadaandedchecked 10.11.20265 yearsAmetlikud TeadaandedAs of: checked 10.11.2026
StatusStatus changes: 1——status history: 5 entriesRIKchecked 10.11.2026status history: 5 entriesRIKAs of: checked 10.11.2026
Composite signal (derived)Lowview——Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt—Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt
Commercial pledgeNo commercial pledge——pledgee names withheldRIKchecked 10.11.2026pledgee names withheldRIKAs of: checked 10.11.2026
Court decisions · sanctions · trademarkssource missing——a company-level link has not been published yet——a company-level link has not been published yet
Composite signal components (derived, not an official score)

Score (derived) 0/100 derived

A composite signal from structured data, not an official assessment or credit rating. It describes data known at calculation time; no forecast horizon is specified.

Calculated 10.11.2026 10:15.

Methodology version: 1.3.

Stored component contributions

  1. Tax debt · 0 points
  2. Financial health · 0 points
  3. Board changes · 0 points
  4. Insolvency notices · 0 points
  5. Licence loss · 0 points

A stored 0 proves neither absence of events nor complete source coverage. Without detail, its cause is unknown.

The underlying record reference is unavailable. No specific event or document can be identified.

methodology

Calculated 10.11.2026 10:15. The score is not a credit rating and not a default forecast. methodology · The score is not a credit rating

Snapshot: Äriregister: 10.11.2026 19:44 · EMTA: 10.11.2026 19:44 · Ametlikud Teadaanded: 10.11.2026 19:44
Source: Äriregister · EMTA · Ametlikud TeadaandedLatest available report year: 2025 (annual reporting) · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · Score calculated: 10.11.2026 · Calculation and snapshot publication do not establish source freshness · Äriregister: Source observation date unknown · EMTA: Debt list observed: 09.11.2026 · daily debt list · Ametlikud Teadaanded: Latest retained notice published: 09.11.2026 · Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026View company sourcesAll sources and licences

What are the company financial results (2025)?

TERASTEENUS OÜ: net profit 543,659 € (period: 2025; consolidated group; source: Äriregister; snapshot: 10.11.2026).

#finantsSnapshot

2025 · Consolidated group: revenue 19,075,405 €, net profit 543,659 €.

Annual reports 2019–2025

↔ Scroll horizontally to see all columns.

Financials
MetricValueΔPeriod and basisSourceAs ofComparison and sources
Revenue19,075,405 €—2025; Consolidated groupRIKchecked 10.11.20262025; Consolidated groupRIKAs of: checked 10.11.2026
Net profit543,659 €—2025; Consolidated groupRIKchecked 10.11.20262025; Consolidated groupRIKAs of: checked 10.11.2026
Equity4,153,372 €—2025; Consolidated groupRIKchecked 10.11.20262025; Consolidated groupRIKAs of: checked 10.11.2026
Assets7,493,943 €—2025; Consolidated groupRIKchecked 10.11.20262025; Consolidated groupRIKAs of: checked 10.11.2026
Employees59—2025; Consolidated groupRIKchecked 10.11.20262025; Consolidated groupRIKAs of: checked 10.11.2026
Revenue11,966,567 €+22.8 %2024; Company onlyRIKchecked 10.11.2026Δ: +22.8 %2024; Company onlyRIKAs of: checked 10.11.2026
Net profit518,193 €-57.6 %2024; Company onlyRIKchecked 10.11.2026Δ: -57.6 %2024; Company onlyRIKAs of: checked 10.11.2026
Equity3,494,321 €+7.8 %2024; Company onlyRIKchecked 10.11.2026Δ: +7.8 %2024; Company onlyRIKAs of: checked 10.11.2026
Assets5,405,410 €-6.6 %2024; Company onlyRIKchecked 10.11.2026Δ: -6.6 %2024; Company onlyRIKAs of: checked 10.11.2026
Employees54+12.5 %2024; Company onlyRIKchecked 10.11.2026Δ: +12.5 %2024; Company onlyRIKAs of: checked 10.11.2026
Revenue9,748,661 €-10.2 %2023; Company onlyRIKchecked 10.11.2026Δ: -10.2 %2023; Company onlyRIKAs of: checked 10.11.2026
Net profit1,222,101 €+122.2 %2023; Company onlyRIKchecked 10.11.2026Δ: +122.2 %2023; Company onlyRIKAs of: checked 10.11.2026
Equity3,240,322 €+36.4 %2023; Company onlyRIKchecked 10.11.2026Δ: +36.4 %2023; Company onlyRIKAs of: checked 10.11.2026
Assets5,785,353 €+32.4 %2023; Company onlyRIKchecked 10.11.2026Δ: +32.4 %2023; Company onlyRIKAs of: checked 10.11.2026
Employees48+2.1 %2023; Company onlyRIKchecked 10.11.2026Δ: +2.1 %2023; Company onlyRIKAs of: checked 10.11.2026
Revenue10,857,962 €+58 %2022; Company onlyRIKchecked 10.11.2026Δ: +58 %2022; Company onlyRIKAs of: checked 10.11.2026
Net profit549,960 €-6.9 %2022; Company onlyRIKchecked 10.11.2026Δ: -6.9 %2022; Company onlyRIKAs of: checked 10.11.2026
Equity2,375,327 €+19.8 %2022; Company onlyRIKchecked 10.11.2026Δ: +19.8 %2022; Company onlyRIKAs of: checked 10.11.2026
Assets4,371,143 €+8.3 %2022; Company onlyRIKchecked 10.11.2026Δ: +8.3 %2022; Company onlyRIKAs of: checked 10.11.2026
Employees47+11.9 %2022; Company onlyRIKchecked 10.11.2026Δ: +11.9 %2022; Company onlyRIKAs of: checked 10.11.2026
Revenue6,870,802 €+37.9 %2021; Company onlyRIKchecked 10.11.2026Δ: +37.9 %2021; Company onlyRIKAs of: checked 10.11.2026
Net profit590,752 €+38.7 %2021; Company onlyRIKchecked 10.11.2026Δ: +38.7 %2021; Company onlyRIKAs of: checked 10.11.2026
Equity1,982,081 €+33.4 %2021; Company onlyRIKchecked 10.11.2026Δ: +33.4 %2021; Company onlyRIKAs of: checked 10.11.2026
Assets4,035,122 €+35.1 %2021; Company onlyRIKchecked 10.11.2026Δ: +35.1 %2021; Company onlyRIKAs of: checked 10.11.2026
Employees42+10.5 %2021; Company onlyRIKchecked 10.11.2026Δ: +10.5 %2021; Company onlyRIKAs of: checked 10.11.2026
Revenue4,983,715 €+26.6 %2020; Company onlyRIKchecked 10.11.2026Δ: +26.6 %2020; Company onlyRIKAs of: checked 10.11.2026
Net profit425,891 €+12.4 %2020; Company onlyRIKchecked 10.11.2026Δ: +12.4 %2020; Company onlyRIKAs of: checked 10.11.2026
Equity1,485,839 €+33.5 %2020; Company onlyRIKchecked 10.11.2026Δ: +33.5 %2020; Company onlyRIKAs of: checked 10.11.2026
Assets2,987,328 €+34.2 %2020; Company onlyRIKchecked 10.11.2026Δ: +34.2 %2020; Company onlyRIKAs of: checked 10.11.2026
Employees38+18.8 %2020; Company onlyRIKchecked 10.11.2026Δ: +18.8 %2020; Company onlyRIKAs of: checked 10.11.2026
Revenue3,936,633 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Net profit379,022 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Equity1,113,215 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Assets2,226,462 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Employees32—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026

Same query via MCP

Source: Äriregister · Latest available report year: 2025 (annual reporting) · Äriregister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

How much tax did the company pay (2026 III)?

TERASTEENUS OÜ: state taxes 419,978 € (period: 2026 III; company only; source: EMTA; snapshot: 10.11.2026).

#maksudSnapshot

↔ Scroll horizontally to see all columns.

Tax figures by quarter
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Quarterly declared turnover (EMTA)4,082,482 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
State taxes419,978 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Labour taxes245,285 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Employees (EMTA quarter, legal entity)71——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Tax Board public tax data
QuarterQuarterly declared turnover (EMTA) (€)State taxes €Labour taxes €Employees (EMTA quarter, legal entity)
2026 III4,082,482419,978245,28571
2026 II2,980,696355,981211,60271
2026 I3,197,716331,693214,16665
2025 IV6,740,817652,493242,28562
2025 III5,290,596415,925236,44563
2025 II3,225,204321,530173,26464
2025 I3,175,259434,073170,26153
2024 IV3,234,415255,439191,19451
2024 III3,452,756327,395177,87360
2024 II2,479,149230,568128,56263

Showing 10 / 19

Source: EMTA · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · EMTA: Debt list observed: 09.11.2026 · daily debt list · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What state aid has the company received (snapshot 10.11.2026)?

TERASTEENUS OÜ: displayed state aid decisions and project grants 4 (source: RAR; snapshot: 10.11.2026).

#toetusedSnapshot
SA Keskkonnainvesteeringute Keskus · Muu >> Muu · 10.09.2025

Amount €: 46,671.11

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:65987 | 2025-09-10 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:65987 · 2025-09-10

ariregister:10943961 · 2003-06-19

Eesti Töötukassa · Palgatoetus VTA >> Palgatoetus VTA · 19.03.2025

Amount €: 5,345.43

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:75014 | 2025-03-19 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:75014 · 2025-03-19

ariregister:10943961 · 2003-06-19

Eesti Töötukassa · Palgatoetus VTA >> Palgatoetus VTA · 01.01.2024

Amount €: 2,450.24

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:60172 | 2024-01-01 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:60172 · 2024-01-01

ariregister:10943961 · 2003-06-19

Eesti Töötukassa · Palgatoetus VTA >> Palgatoetus VTA · 10.10.2023

Amount €: 159.09

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:26605 | 2023-10-10 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:26605 · 2023-10-10

ariregister:10943961 · 2003-06-19

Observed ship-register entries

Owner entry in the register, may not be current owner. Current ownership is unverified. Separate revisions are separate entries, not additional vessels. Type and use retain the source wording.

No observed entries for open ships in this snapshot.

Source: Centre of Registers and Information Systems, ship register · Licence: CC BY-SA 4.0 · RIK Laev.xml, CC BY-SA 4.0 · Registrite ja Infosüsteemide Keskus (RIK) · Data catalogue

Environmental records

Source presence and source status do not confirm permit validity. Emission sources and waste facilities are separate record types. Record counts are not an environmental footprint or pollution quantities. Location is unknown.

Current or confirmed in source (1)
Environmental records · Current or confirmed in source
Record typeNumberSource statusStart dateEnd dateLegal validityOfficial link
Environmental permitRE.JÄ/524441IssuedSource valid from: 2025-05-28Source valid until: UnknownUnknownOfficial link unavailable
Archived or ended (9 of 32)
Environmental records · Archived or ended
Record typeNumberSource statusStart dateEnd dateLegal validityOfficial link
Waste facilityJKK0904542ArchivedActivity start: 2025-08-28Activity end: 2025-11-30UnknownOfficial link unavailable
Waste facilityJKK0904621ArchivedActivity start: 2025-11-05Activity end: 2025-12-01UnknownOfficial link unavailable
Waste facilityJKK0904686ArchivedActivity start: 2025-10-29Activity end: 2026-05-31UnknownOfficial link unavailable
Waste facilityJKK0904945ArchivedActivity start: 2026-03-07Activity end: 2026-06-30UnknownOfficial link unavailable
Waste facilityJKK4400332ArchivedActivity start: 2022-01-11Activity end: 2022-01-31UnknownOfficial link unavailable
Waste facilityJKK4400368ArchivedActivity start: 2022-11-04Activity end: 2022-11-30UnknownOfficial link unavailable
Waste facilityJKK4400369ArchivedActivity start: 2023-12-21Activity end: 2023-12-31UnknownOfficial link unavailable
Waste facilityJKK4400378ArchivedActivity start: 2023-02-16Activity end: 2023-04-05UnknownOfficial link unavailable
Waste facilityJKK4400448ArchivedActivity start: 2025-07-18Activity end: 2025-12-31UnknownOfficial link unavailable

Showing 10 / 33

Source: Keskkonnaamet, KOTKAS permits, AvTS § 3¹(9)

Source: RTK · MTR · Keskkonnaamet · RTK: Source observation date unknown · MTR: Source observation date unknown · Keskkonnaamet: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What procurement has the company won (snapshot 10.11.2026)?

TERASTEENUS OÜ: procurement wins 82 (source: Riigihangete register; snapshot: 10.11.2026).

#hankedSnapshot

Won a tender. The company has won a public tender, 82 wins.

Informational indicators, not accusations or proof of wrongdoing. Free CSV exports the loaded rows. Load more to include further results.

Varemete lammutus Marsi tn 20 kinnistul · 19.10.2026

Incorporated < 90 days before decision: Rule not met; ; ; 81ee0bf2-6875-461f-9be4-ff5509a37f7c/RES-0000/10943961 | 2026-10-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315546; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; 81ee0bf2-6875-461f-9be4-ff5509a37f7c/RES-0000/10943961 | 2026-10-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315546 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-10-19 – 2026-10-19; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 0718392c-5597-48f8-aed5-51fc10547a3e/81ee0bf2-6875-461f-9be4-ff5509a37f7c/RES-0000/TEN-0001/10943961 | 2026-10-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315546 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

81ee0bf2-6875-461f-9be4-ff5509a37f7c/RES-0000/10943961 · 2026-10-19

ariregister:10943961 · 2003-06-19

81ee0bf2-6875-461f-9be4-ff5509a37f7c/RES-0000/10943961 · 2026-10-19

0718392c-5597-48f8-aed5-51fc10547a3e/81ee0bf2-6875-461f-9be4-ff5509a37f7c/RES-0000/TEN-0001/10943961 · 2026-10-19

Riigimaal ehitiste lammutustööd ja ohutustamine (Maa- ja Ruumiamet) V piiratud hankemenetlus · 10.08.2026

Incorporated < 90 days before decision: Rule not met; ; ; d92b90ce-bb2a-488f-b70c-b05031987060/RES-0001/10943961 | 2026-08-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/312359; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; d92b90ce-bb2a-488f-b70c-b05031987060/RES-0001/10943961 | 2026-08-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/312359 Repeated recorded procedures: Unknown; ; ; On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

d92b90ce-bb2a-488f-b70c-b05031987060/RES-0001/10943961 · 2026-08-10

ariregister:10943961 · 2003-06-19

d92b90ce-bb2a-488f-b70c-b05031987060/RES-0001/10943961 · 2026-08-10

Papli tn 5 masuudimahutite jääkreostuse likvideerimine · 23.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; db9096f5-ae1e-4401-a806-9c32cc786250/RES-0000/10943961 | 2026-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311368; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; db9096f5-ae1e-4401-a806-9c32cc786250/RES-0000/10943961 | 2026-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311368 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-07-23 – 2026-07-23; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 11150d2d-1baa-45e3-aee5-81fa326cde32/db9096f5-ae1e-4401-a806-9c32cc786250/RES-0000/TEN-0001/10943961 | 2026-07-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311368 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

db9096f5-ae1e-4401-a806-9c32cc786250/RES-0000/10943961 · 2026-07-23

ariregister:10943961 · 2003-06-19

db9096f5-ae1e-4401-a806-9c32cc786250/RES-0000/10943961 · 2026-07-23

11150d2d-1baa-45e3-aee5-81fa326cde32/db9096f5-ae1e-4401-a806-9c32cc786250/RES-0000/TEN-0001/10943961 · 2026-07-23

Salvkaevude likvideerimine · 20.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; 2672692f-3a73-42d0-b9d9-12df8b355799/RES-0000/10943961 | 2026-07-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/312082; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; 2672692f-3a73-42d0-b9d9-12df8b355799/RES-0000/10943961 | 2026-07-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/312082 Repeated recorded procedures: Unknown; ; ; On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

2672692f-3a73-42d0-b9d9-12df8b355799/RES-0000/10943961 · 2026-07-20

ariregister:10943961 · 2003-06-19

2672692f-3a73-42d0-b9d9-12df8b355799/RES-0000/10943961 · 2026-07-20

Pesu- ja dušširuumi rajamistööd · 18.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; 3017ba2e-7afe-46e6-ad90-da05b2f223f4/RES-0000/10943961 | 2026-07-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311629; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; 3017ba2e-7afe-46e6-ad90-da05b2f223f4/RES-0000/10943961 | 2026-07-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311629 Repeated recorded procedures: Indicator present; Distinct procedures: 2; Retained award dates: 2026-05-21 – 2026-07-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 3248e0d3-25f7-44e5-a802-c521eb720559/3017ba2e-7afe-46e6-ad90-da05b2f223f4/RES-0000/TEN-0001/10943961 | 2026-07-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311629; 5f099017-a979-402d-8106-b24c8784ad40/1cd29d3c-c087-4d92-9053-d6b276856142/RES-0000/TEN-0001/10943961 | 2026-05-21 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307114 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

3017ba2e-7afe-46e6-ad90-da05b2f223f4/RES-0000/10943961 · 2026-07-18

ariregister:10943961 · 2003-06-19

3017ba2e-7afe-46e6-ad90-da05b2f223f4/RES-0000/10943961 · 2026-07-18

3248e0d3-25f7-44e5-a802-c521eb720559/3017ba2e-7afe-46e6-ad90-da05b2f223f4/RES-0000/TEN-0001/10943961 · 2026-07-18

5f099017-a979-402d-8106-b24c8784ad40/1cd29d3c-c087-4d92-9053-d6b276856142/RES-0000/TEN-0001/10943961 · 2026-05-21

Elektrivõrgu rikete likvideerimine Raplamaal ja Järvamaal · 01.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309537; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309537 Repeated recorded procedures: Indicator present; Distinct procedures: 33; Retained award dates: 2024-04-17 – 2026-07-01; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 00beadb3-7b0d-4c9a-ab01-83b28bb206ad/63427d6c-c1c4-4567-b509-a865bf2ccbcd/RES-0000/TEN-0001/10943961 | 2025-10-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301751; 01692274-7957-4adb-8209-574647833f5a/f469882c-461b-407f-b536-e528f46978df/RES-0000/TEN-0001/10943961 | 2026-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303907; 063bce88-fd69-472a-aa48-cc539c88af13/e132e274-723c-463c-a224-f5b871233339/RES-0000/TEN-0001/10943961 | 2025-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/293472; 0bc5b084-4074-47ca-9fd5-3b6465102d30/c0cd0351-07a8-4b68-8ab7-6e07b7dda3de/RES-0000/TEN-0001/10943961 | 2024-11-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286775; 1020256a-5022-46ca-aad4-27ce1c79d305/1a4e892e-fe06-4c65-825c-a8c3d9555bda/RES-0000/TEN-0001/10943961 | 2024-10-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284986; 134ca161-b823-4638-843d-30702425ce4c/3084a564-f05a-434d-a210-423324d3b155/RES-0000/TEN-0001/10943961 | 2024-04-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277749; 1b54cc03-95c9-4169-b07c-1495b3d7dccd/0ad21cfc-a1a1-472c-98e7-63deeaab7683/RES-0000/TEN-0001/10943961 | 2026-02-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306352; 2805998b-399e-434c-8611-3be5e51e7f5d/4f81cf1c-ae9e-47e0-b9fc-95c6251c0e02/RES-0000/TEN-0001/10943961 | 2024-11-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284041; 2e845002-ce44-499a-95af-e03e431a6035/e7710e58-d9ec-4051-aa91-14d432a96f95/RES-0000/TEN-0001/10943961 | 2025-02-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290598; 3893ad45-4558-43b3-b899-42a2624465f6/19bb48c6-96ed-4c5c-9f6e-0f7adee03440/RES-0000/TEN-0001/10943961 | 2024-10-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/285584; 3a683cb1-83d3-4f5a-bc76-114b80f3c942/3b586dd8-9e74-4927-a3b0-296a30d082f7/RES-0000/TEN-0005/10943961 | 2025-05-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292267; 3fb579c7-ee70-42b5-bfde-68fc5d54233c/92727805-677b-4f26-9650-ea48a163ee90/RES-0000/TEN-0001/10943961 | 2025-01-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288696; 4181bea1-3a56-4196-abb9-89c09f56f99f/1d14fd90-124c-490a-a8cc-7aa45727138e/RES-0000/TEN-0002/10943961 | 2024-07-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280495; 547c9e2d-9290-4058-a9e2-af43ee581b8f/4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/TEN-0006/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309461; 577a1b5b-5fa2-4340-b446-3eac9dd5b407/d5809083-01b7-4e07-8fa2-148db94dcb91/RES-0000/TEN-0001/10943961 | 2026-02-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304796; 59d8b957-475c-44c7-9bb0-ade360e9eee9/cdf46678-4ae6-4878-9d3b-47a58ededb08/RES-0000/TEN-0002/10943961 | 2024-07-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280494; 5d265f93-3f1e-4388-92c9-f0f7bc40386b/4c45e8a6-b6b8-4c92-b4c2-c03dea9652c0/RES-0000/TEN-0001/10943961 | 2024-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281211; 6d8b6090-904a-4aed-8193-57d218ec61eb/d34b9db9-9bc0-48a0-82fb-dccd93278058/RES-0000/TEN-0001/10943961 | 2025-01-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/289606; 6e6f81ed-bc7a-4372-a81d-2f7f72e48ac8/04bee412-94b1-448d-b93e-fbd2824267bd/RES-0000/TEN-0001/10943961 | 2024-07-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281859; 73596a58-ef47-4797-b7a3-9497b5bbf036/684b53cd-83d5-44ef-b9d7-af9579d1627f/RES-0000/TEN-0001/10943961 | 2026-02-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306148; 76c226e0-8123-4f80-9a18-79d31982e03b/3b1d0271-d2f3-4ab0-b8ee-b567d1bbee8b/RES-0000/TEN-0006/10943961 | 2025-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290089; 7e9b734a-026b-433b-b6cf-7d5589267393/d323edd8-5f5a-44cf-ac2f-df973264c852/RES-0000/TEN-0001/10943961 | 2025-04-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292796; 7ff43d8d-fdf8-471b-9498-dad47c066e94/0ba9cfd2-77bf-4368-8046-6ebbcb1eaf20/RES-0000/TEN-0001/10943961 | 2026-02-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304896; 8ad909ee-c268-4926-9de4-15b261b8e549/9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/TEN-0009/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309543; 8d110d95-f3a9-492d-abd7-1fa21aaa7d1b/7b20cfcb-749e-4661-b6a4-f0dda39cdcdd/RES-0000/TEN-0001/10943961 | 2025-09-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300089; 8d77d459-6877-4326-a887-cd1bf399f2fe/67f482a5-279d-4d34-97d5-23022b0e269b/RES-0000/TEN-0001/10943961 | 2024-11-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284040; 8eb0a552-2eb1-4b59-a7da-99cad2028981/da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/TEN-0008/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309537; 900e2982-58d4-4d4e-911e-d2f3754448b1/558df926-0967-4dba-9924-8eb20dda1ff9/RES-0000/TEN-0003/10943961 | 2025-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292179; 98c63a7e-8d09-4e86-99d0-3fd683d0ad25/e7e070aa-6c61-4b55-9935-c61437e8c533/RES-0000/TEN-0001/10943961 | 2026-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308888; 9ee89892-8992-40d2-b82e-336943dbf13d/5871a05f-768b-4d23-82d0-d082e7b3dcee/RES-0000/TEN-0001/10943961 | 2026-01-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304598; dd745897-c554-423e-9892-09820ecb1c02/a48aa6e6-4844-4097-aa81-06f2fd5074b1/RES-0000/TEN-0001/10943961 | 2024-10-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283676; fce111f6-d794-470a-bb8e-4ea20fa91a47/bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/TEN-0001/10943961 | 2026-06-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308721; ff8a2915-6434-4407-b6b7-216076fb5f6d/f3420cf4-e590-43ea-98aa-5a0c7c33247d/RES-0000/TEN-0001/10943961 | 2024-04-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/278190 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/10943961 · 2026-07-01

ariregister:10943961 · 2003-06-19

da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/10943961 · 2026-07-01

00beadb3-7b0d-4c9a-ab01-83b28bb206ad/63427d6c-c1c4-4567-b509-a865bf2ccbcd/RES-0000/TEN-0001/10943961 · 2025-10-30

01692274-7957-4adb-8209-574647833f5a/f469882c-461b-407f-b536-e528f46978df/RES-0000/TEN-0001/10943961 · 2026-03-18

063bce88-fd69-472a-aa48-cc539c88af13/e132e274-723c-463c-a224-f5b871233339/RES-0000/TEN-0001/10943961 · 2025-05-06

0bc5b084-4074-47ca-9fd5-3b6465102d30/c0cd0351-07a8-4b68-8ab7-6e07b7dda3de/RES-0000/TEN-0001/10943961 · 2024-11-18

1020256a-5022-46ca-aad4-27ce1c79d305/1a4e892e-fe06-4c65-825c-a8c3d9555bda/RES-0000/TEN-0001/10943961 · 2024-10-10

134ca161-b823-4638-843d-30702425ce4c/3084a564-f05a-434d-a210-423324d3b155/RES-0000/TEN-0001/10943961 · 2024-04-18

1b54cc03-95c9-4169-b07c-1495b3d7dccd/0ad21cfc-a1a1-472c-98e7-63deeaab7683/RES-0000/TEN-0001/10943961 · 2026-02-27

2805998b-399e-434c-8611-3be5e51e7f5d/4f81cf1c-ae9e-47e0-b9fc-95c6251c0e02/RES-0000/TEN-0001/10943961 · 2024-11-04

2e845002-ce44-499a-95af-e03e431a6035/e7710e58-d9ec-4051-aa91-14d432a96f95/RES-0000/TEN-0001/10943961 · 2025-02-26

3893ad45-4558-43b3-b899-42a2624465f6/19bb48c6-96ed-4c5c-9f6e-0f7adee03440/RES-0000/TEN-0001/10943961 · 2024-10-29

3a683cb1-83d3-4f5a-bc76-114b80f3c942/3b586dd8-9e74-4927-a3b0-296a30d082f7/RES-0000/TEN-0005/10943961 · 2025-05-16

3fb579c7-ee70-42b5-bfde-68fc5d54233c/92727805-677b-4f26-9650-ea48a163ee90/RES-0000/TEN-0001/10943961 · 2025-01-16

4181bea1-3a56-4196-abb9-89c09f56f99f/1d14fd90-124c-490a-a8cc-7aa45727138e/RES-0000/TEN-0002/10943961 · 2024-07-24

547c9e2d-9290-4058-a9e2-af43ee581b8f/4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/TEN-0006/10943961 · 2026-07-01

577a1b5b-5fa2-4340-b446-3eac9dd5b407/d5809083-01b7-4e07-8fa2-148db94dcb91/RES-0000/TEN-0001/10943961 · 2026-02-05

59d8b957-475c-44c7-9bb0-ade360e9eee9/cdf46678-4ae6-4878-9d3b-47a58ededb08/RES-0000/TEN-0002/10943961 · 2024-07-24

5d265f93-3f1e-4388-92c9-f0f7bc40386b/4c45e8a6-b6b8-4c92-b4c2-c03dea9652c0/RES-0000/TEN-0001/10943961 · 2024-10-02

6d8b6090-904a-4aed-8193-57d218ec61eb/d34b9db9-9bc0-48a0-82fb-dccd93278058/RES-0000/TEN-0001/10943961 · 2025-01-31

6e6f81ed-bc7a-4372-a81d-2f7f72e48ac8/04bee412-94b1-448d-b93e-fbd2824267bd/RES-0000/TEN-0001/10943961 · 2024-07-10

73596a58-ef47-4797-b7a3-9497b5bbf036/684b53cd-83d5-44ef-b9d7-af9579d1627f/RES-0000/TEN-0001/10943961 · 2026-02-23

76c226e0-8123-4f80-9a18-79d31982e03b/3b1d0271-d2f3-4ab0-b8ee-b567d1bbee8b/RES-0000/TEN-0006/10943961 · 2025-05-28

7e9b734a-026b-433b-b6cf-7d5589267393/d323edd8-5f5a-44cf-ac2f-df973264c852/RES-0000/TEN-0001/10943961 · 2025-04-28

7ff43d8d-fdf8-471b-9498-dad47c066e94/0ba9cfd2-77bf-4368-8046-6ebbcb1eaf20/RES-0000/TEN-0001/10943961 · 2026-02-04

8ad909ee-c268-4926-9de4-15b261b8e549/9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/TEN-0009/10943961 · 2026-07-01

8d110d95-f3a9-492d-abd7-1fa21aaa7d1b/7b20cfcb-749e-4661-b6a4-f0dda39cdcdd/RES-0000/TEN-0001/10943961 · 2025-09-30

8d77d459-6877-4326-a887-cd1bf399f2fe/67f482a5-279d-4d34-97d5-23022b0e269b/RES-0000/TEN-0001/10943961 · 2024-11-04

8eb0a552-2eb1-4b59-a7da-99cad2028981/da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/TEN-0008/10943961 · 2026-07-01

900e2982-58d4-4d4e-911e-d2f3754448b1/558df926-0967-4dba-9924-8eb20dda1ff9/RES-0000/TEN-0003/10943961 · 2025-06-16

98c63a7e-8d09-4e86-99d0-3fd683d0ad25/e7e070aa-6c61-4b55-9935-c61437e8c533/RES-0000/TEN-0001/10943961 · 2026-05-27

9ee89892-8992-40d2-b82e-336943dbf13d/5871a05f-768b-4d23-82d0-d082e7b3dcee/RES-0000/TEN-0001/10943961 · 2026-01-16

dd745897-c554-423e-9892-09820ecb1c02/a48aa6e6-4844-4097-aa81-06f2fd5074b1/RES-0000/TEN-0001/10943961 · 2024-10-10

fce111f6-d794-470a-bb8e-4ea20fa91a47/bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/TEN-0001/10943961 · 2026-06-11

ff8a2915-6434-4407-b6b7-216076fb5f6d/f3420cf4-e590-43ea-98aa-5a0c7c33247d/RES-0000/TEN-0001/10943961 · 2024-04-17

Elektrivõrgu rikete likvideerimine Harjumaal · 01.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; 9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309543; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; 9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309543 Repeated recorded procedures: Indicator present; Distinct procedures: 33; Retained award dates: 2024-04-17 – 2026-07-01; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 00beadb3-7b0d-4c9a-ab01-83b28bb206ad/63427d6c-c1c4-4567-b509-a865bf2ccbcd/RES-0000/TEN-0001/10943961 | 2025-10-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301751; 01692274-7957-4adb-8209-574647833f5a/f469882c-461b-407f-b536-e528f46978df/RES-0000/TEN-0001/10943961 | 2026-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303907; 063bce88-fd69-472a-aa48-cc539c88af13/e132e274-723c-463c-a224-f5b871233339/RES-0000/TEN-0001/10943961 | 2025-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/293472; 0bc5b084-4074-47ca-9fd5-3b6465102d30/c0cd0351-07a8-4b68-8ab7-6e07b7dda3de/RES-0000/TEN-0001/10943961 | 2024-11-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286775; 1020256a-5022-46ca-aad4-27ce1c79d305/1a4e892e-fe06-4c65-825c-a8c3d9555bda/RES-0000/TEN-0001/10943961 | 2024-10-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284986; 134ca161-b823-4638-843d-30702425ce4c/3084a564-f05a-434d-a210-423324d3b155/RES-0000/TEN-0001/10943961 | 2024-04-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277749; 1b54cc03-95c9-4169-b07c-1495b3d7dccd/0ad21cfc-a1a1-472c-98e7-63deeaab7683/RES-0000/TEN-0001/10943961 | 2026-02-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306352; 2805998b-399e-434c-8611-3be5e51e7f5d/4f81cf1c-ae9e-47e0-b9fc-95c6251c0e02/RES-0000/TEN-0001/10943961 | 2024-11-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284041; 2e845002-ce44-499a-95af-e03e431a6035/e7710e58-d9ec-4051-aa91-14d432a96f95/RES-0000/TEN-0001/10943961 | 2025-02-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290598; 3893ad45-4558-43b3-b899-42a2624465f6/19bb48c6-96ed-4c5c-9f6e-0f7adee03440/RES-0000/TEN-0001/10943961 | 2024-10-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/285584; 3a683cb1-83d3-4f5a-bc76-114b80f3c942/3b586dd8-9e74-4927-a3b0-296a30d082f7/RES-0000/TEN-0005/10943961 | 2025-05-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292267; 3fb579c7-ee70-42b5-bfde-68fc5d54233c/92727805-677b-4f26-9650-ea48a163ee90/RES-0000/TEN-0001/10943961 | 2025-01-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288696; 4181bea1-3a56-4196-abb9-89c09f56f99f/1d14fd90-124c-490a-a8cc-7aa45727138e/RES-0000/TEN-0002/10943961 | 2024-07-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280495; 547c9e2d-9290-4058-a9e2-af43ee581b8f/4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/TEN-0006/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309461; 577a1b5b-5fa2-4340-b446-3eac9dd5b407/d5809083-01b7-4e07-8fa2-148db94dcb91/RES-0000/TEN-0001/10943961 | 2026-02-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304796; 59d8b957-475c-44c7-9bb0-ade360e9eee9/cdf46678-4ae6-4878-9d3b-47a58ededb08/RES-0000/TEN-0002/10943961 | 2024-07-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280494; 5d265f93-3f1e-4388-92c9-f0f7bc40386b/4c45e8a6-b6b8-4c92-b4c2-c03dea9652c0/RES-0000/TEN-0001/10943961 | 2024-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281211; 6d8b6090-904a-4aed-8193-57d218ec61eb/d34b9db9-9bc0-48a0-82fb-dccd93278058/RES-0000/TEN-0001/10943961 | 2025-01-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/289606; 6e6f81ed-bc7a-4372-a81d-2f7f72e48ac8/04bee412-94b1-448d-b93e-fbd2824267bd/RES-0000/TEN-0001/10943961 | 2024-07-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281859; 73596a58-ef47-4797-b7a3-9497b5bbf036/684b53cd-83d5-44ef-b9d7-af9579d1627f/RES-0000/TEN-0001/10943961 | 2026-02-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306148; 76c226e0-8123-4f80-9a18-79d31982e03b/3b1d0271-d2f3-4ab0-b8ee-b567d1bbee8b/RES-0000/TEN-0006/10943961 | 2025-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290089; 7e9b734a-026b-433b-b6cf-7d5589267393/d323edd8-5f5a-44cf-ac2f-df973264c852/RES-0000/TEN-0001/10943961 | 2025-04-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292796; 7ff43d8d-fdf8-471b-9498-dad47c066e94/0ba9cfd2-77bf-4368-8046-6ebbcb1eaf20/RES-0000/TEN-0001/10943961 | 2026-02-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304896; 8ad909ee-c268-4926-9de4-15b261b8e549/9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/TEN-0009/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309543; 8d110d95-f3a9-492d-abd7-1fa21aaa7d1b/7b20cfcb-749e-4661-b6a4-f0dda39cdcdd/RES-0000/TEN-0001/10943961 | 2025-09-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300089; 8d77d459-6877-4326-a887-cd1bf399f2fe/67f482a5-279d-4d34-97d5-23022b0e269b/RES-0000/TEN-0001/10943961 | 2024-11-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284040; 8eb0a552-2eb1-4b59-a7da-99cad2028981/da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/TEN-0008/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309537; 900e2982-58d4-4d4e-911e-d2f3754448b1/558df926-0967-4dba-9924-8eb20dda1ff9/RES-0000/TEN-0003/10943961 | 2025-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292179; 98c63a7e-8d09-4e86-99d0-3fd683d0ad25/e7e070aa-6c61-4b55-9935-c61437e8c533/RES-0000/TEN-0001/10943961 | 2026-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308888; 9ee89892-8992-40d2-b82e-336943dbf13d/5871a05f-768b-4d23-82d0-d082e7b3dcee/RES-0000/TEN-0001/10943961 | 2026-01-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304598; dd745897-c554-423e-9892-09820ecb1c02/a48aa6e6-4844-4097-aa81-06f2fd5074b1/RES-0000/TEN-0001/10943961 | 2024-10-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283676; fce111f6-d794-470a-bb8e-4ea20fa91a47/bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/TEN-0001/10943961 | 2026-06-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308721; ff8a2915-6434-4407-b6b7-216076fb5f6d/f3420cf4-e590-43ea-98aa-5a0c7c33247d/RES-0000/TEN-0001/10943961 | 2024-04-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/278190 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/10943961 · 2026-07-01

ariregister:10943961 · 2003-06-19

9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/10943961 · 2026-07-01

00beadb3-7b0d-4c9a-ab01-83b28bb206ad/63427d6c-c1c4-4567-b509-a865bf2ccbcd/RES-0000/TEN-0001/10943961 · 2025-10-30

01692274-7957-4adb-8209-574647833f5a/f469882c-461b-407f-b536-e528f46978df/RES-0000/TEN-0001/10943961 · 2026-03-18

063bce88-fd69-472a-aa48-cc539c88af13/e132e274-723c-463c-a224-f5b871233339/RES-0000/TEN-0001/10943961 · 2025-05-06

0bc5b084-4074-47ca-9fd5-3b6465102d30/c0cd0351-07a8-4b68-8ab7-6e07b7dda3de/RES-0000/TEN-0001/10943961 · 2024-11-18

1020256a-5022-46ca-aad4-27ce1c79d305/1a4e892e-fe06-4c65-825c-a8c3d9555bda/RES-0000/TEN-0001/10943961 · 2024-10-10

134ca161-b823-4638-843d-30702425ce4c/3084a564-f05a-434d-a210-423324d3b155/RES-0000/TEN-0001/10943961 · 2024-04-18

1b54cc03-95c9-4169-b07c-1495b3d7dccd/0ad21cfc-a1a1-472c-98e7-63deeaab7683/RES-0000/TEN-0001/10943961 · 2026-02-27

2805998b-399e-434c-8611-3be5e51e7f5d/4f81cf1c-ae9e-47e0-b9fc-95c6251c0e02/RES-0000/TEN-0001/10943961 · 2024-11-04

2e845002-ce44-499a-95af-e03e431a6035/e7710e58-d9ec-4051-aa91-14d432a96f95/RES-0000/TEN-0001/10943961 · 2025-02-26

3893ad45-4558-43b3-b899-42a2624465f6/19bb48c6-96ed-4c5c-9f6e-0f7adee03440/RES-0000/TEN-0001/10943961 · 2024-10-29

3a683cb1-83d3-4f5a-bc76-114b80f3c942/3b586dd8-9e74-4927-a3b0-296a30d082f7/RES-0000/TEN-0005/10943961 · 2025-05-16

3fb579c7-ee70-42b5-bfde-68fc5d54233c/92727805-677b-4f26-9650-ea48a163ee90/RES-0000/TEN-0001/10943961 · 2025-01-16

4181bea1-3a56-4196-abb9-89c09f56f99f/1d14fd90-124c-490a-a8cc-7aa45727138e/RES-0000/TEN-0002/10943961 · 2024-07-24

547c9e2d-9290-4058-a9e2-af43ee581b8f/4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/TEN-0006/10943961 · 2026-07-01

577a1b5b-5fa2-4340-b446-3eac9dd5b407/d5809083-01b7-4e07-8fa2-148db94dcb91/RES-0000/TEN-0001/10943961 · 2026-02-05

59d8b957-475c-44c7-9bb0-ade360e9eee9/cdf46678-4ae6-4878-9d3b-47a58ededb08/RES-0000/TEN-0002/10943961 · 2024-07-24

5d265f93-3f1e-4388-92c9-f0f7bc40386b/4c45e8a6-b6b8-4c92-b4c2-c03dea9652c0/RES-0000/TEN-0001/10943961 · 2024-10-02

6d8b6090-904a-4aed-8193-57d218ec61eb/d34b9db9-9bc0-48a0-82fb-dccd93278058/RES-0000/TEN-0001/10943961 · 2025-01-31

6e6f81ed-bc7a-4372-a81d-2f7f72e48ac8/04bee412-94b1-448d-b93e-fbd2824267bd/RES-0000/TEN-0001/10943961 · 2024-07-10

73596a58-ef47-4797-b7a3-9497b5bbf036/684b53cd-83d5-44ef-b9d7-af9579d1627f/RES-0000/TEN-0001/10943961 · 2026-02-23

76c226e0-8123-4f80-9a18-79d31982e03b/3b1d0271-d2f3-4ab0-b8ee-b567d1bbee8b/RES-0000/TEN-0006/10943961 · 2025-05-28

7e9b734a-026b-433b-b6cf-7d5589267393/d323edd8-5f5a-44cf-ac2f-df973264c852/RES-0000/TEN-0001/10943961 · 2025-04-28

7ff43d8d-fdf8-471b-9498-dad47c066e94/0ba9cfd2-77bf-4368-8046-6ebbcb1eaf20/RES-0000/TEN-0001/10943961 · 2026-02-04

8ad909ee-c268-4926-9de4-15b261b8e549/9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/TEN-0009/10943961 · 2026-07-01

8d110d95-f3a9-492d-abd7-1fa21aaa7d1b/7b20cfcb-749e-4661-b6a4-f0dda39cdcdd/RES-0000/TEN-0001/10943961 · 2025-09-30

8d77d459-6877-4326-a887-cd1bf399f2fe/67f482a5-279d-4d34-97d5-23022b0e269b/RES-0000/TEN-0001/10943961 · 2024-11-04

8eb0a552-2eb1-4b59-a7da-99cad2028981/da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/TEN-0008/10943961 · 2026-07-01

900e2982-58d4-4d4e-911e-d2f3754448b1/558df926-0967-4dba-9924-8eb20dda1ff9/RES-0000/TEN-0003/10943961 · 2025-06-16

98c63a7e-8d09-4e86-99d0-3fd683d0ad25/e7e070aa-6c61-4b55-9935-c61437e8c533/RES-0000/TEN-0001/10943961 · 2026-05-27

9ee89892-8992-40d2-b82e-336943dbf13d/5871a05f-768b-4d23-82d0-d082e7b3dcee/RES-0000/TEN-0001/10943961 · 2026-01-16

dd745897-c554-423e-9892-09820ecb1c02/a48aa6e6-4844-4097-aa81-06f2fd5074b1/RES-0000/TEN-0001/10943961 · 2024-10-10

fce111f6-d794-470a-bb8e-4ea20fa91a47/bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/TEN-0001/10943961 · 2026-06-11

ff8a2915-6434-4407-b6b7-216076fb5f6d/f3420cf4-e590-43ea-98aa-5a0c7c33247d/RES-0000/TEN-0001/10943961 · 2024-04-17

Elektrivõrgu rikete likvideerimine Ida-Virumaal · 01.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; 4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309461; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; 4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309461 Repeated recorded procedures: Indicator present; Distinct procedures: 33; Retained award dates: 2024-04-17 – 2026-07-01; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 00beadb3-7b0d-4c9a-ab01-83b28bb206ad/63427d6c-c1c4-4567-b509-a865bf2ccbcd/RES-0000/TEN-0001/10943961 | 2025-10-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301751; 01692274-7957-4adb-8209-574647833f5a/f469882c-461b-407f-b536-e528f46978df/RES-0000/TEN-0001/10943961 | 2026-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303907; 063bce88-fd69-472a-aa48-cc539c88af13/e132e274-723c-463c-a224-f5b871233339/RES-0000/TEN-0001/10943961 | 2025-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/293472; 0bc5b084-4074-47ca-9fd5-3b6465102d30/c0cd0351-07a8-4b68-8ab7-6e07b7dda3de/RES-0000/TEN-0001/10943961 | 2024-11-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286775; 1020256a-5022-46ca-aad4-27ce1c79d305/1a4e892e-fe06-4c65-825c-a8c3d9555bda/RES-0000/TEN-0001/10943961 | 2024-10-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284986; 134ca161-b823-4638-843d-30702425ce4c/3084a564-f05a-434d-a210-423324d3b155/RES-0000/TEN-0001/10943961 | 2024-04-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277749; 1b54cc03-95c9-4169-b07c-1495b3d7dccd/0ad21cfc-a1a1-472c-98e7-63deeaab7683/RES-0000/TEN-0001/10943961 | 2026-02-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306352; 2805998b-399e-434c-8611-3be5e51e7f5d/4f81cf1c-ae9e-47e0-b9fc-95c6251c0e02/RES-0000/TEN-0001/10943961 | 2024-11-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284041; 2e845002-ce44-499a-95af-e03e431a6035/e7710e58-d9ec-4051-aa91-14d432a96f95/RES-0000/TEN-0001/10943961 | 2025-02-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290598; 3893ad45-4558-43b3-b899-42a2624465f6/19bb48c6-96ed-4c5c-9f6e-0f7adee03440/RES-0000/TEN-0001/10943961 | 2024-10-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/285584; 3a683cb1-83d3-4f5a-bc76-114b80f3c942/3b586dd8-9e74-4927-a3b0-296a30d082f7/RES-0000/TEN-0005/10943961 | 2025-05-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292267; 3fb579c7-ee70-42b5-bfde-68fc5d54233c/92727805-677b-4f26-9650-ea48a163ee90/RES-0000/TEN-0001/10943961 | 2025-01-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288696; 4181bea1-3a56-4196-abb9-89c09f56f99f/1d14fd90-124c-490a-a8cc-7aa45727138e/RES-0000/TEN-0002/10943961 | 2024-07-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280495; 547c9e2d-9290-4058-a9e2-af43ee581b8f/4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/TEN-0006/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309461; 577a1b5b-5fa2-4340-b446-3eac9dd5b407/d5809083-01b7-4e07-8fa2-148db94dcb91/RES-0000/TEN-0001/10943961 | 2026-02-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304796; 59d8b957-475c-44c7-9bb0-ade360e9eee9/cdf46678-4ae6-4878-9d3b-47a58ededb08/RES-0000/TEN-0002/10943961 | 2024-07-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280494; 5d265f93-3f1e-4388-92c9-f0f7bc40386b/4c45e8a6-b6b8-4c92-b4c2-c03dea9652c0/RES-0000/TEN-0001/10943961 | 2024-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281211; 6d8b6090-904a-4aed-8193-57d218ec61eb/d34b9db9-9bc0-48a0-82fb-dccd93278058/RES-0000/TEN-0001/10943961 | 2025-01-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/289606; 6e6f81ed-bc7a-4372-a81d-2f7f72e48ac8/04bee412-94b1-448d-b93e-fbd2824267bd/RES-0000/TEN-0001/10943961 | 2024-07-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281859; 73596a58-ef47-4797-b7a3-9497b5bbf036/684b53cd-83d5-44ef-b9d7-af9579d1627f/RES-0000/TEN-0001/10943961 | 2026-02-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306148; 76c226e0-8123-4f80-9a18-79d31982e03b/3b1d0271-d2f3-4ab0-b8ee-b567d1bbee8b/RES-0000/TEN-0006/10943961 | 2025-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290089; 7e9b734a-026b-433b-b6cf-7d5589267393/d323edd8-5f5a-44cf-ac2f-df973264c852/RES-0000/TEN-0001/10943961 | 2025-04-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292796; 7ff43d8d-fdf8-471b-9498-dad47c066e94/0ba9cfd2-77bf-4368-8046-6ebbcb1eaf20/RES-0000/TEN-0001/10943961 | 2026-02-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304896; 8ad909ee-c268-4926-9de4-15b261b8e549/9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/TEN-0009/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309543; 8d110d95-f3a9-492d-abd7-1fa21aaa7d1b/7b20cfcb-749e-4661-b6a4-f0dda39cdcdd/RES-0000/TEN-0001/10943961 | 2025-09-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300089; 8d77d459-6877-4326-a887-cd1bf399f2fe/67f482a5-279d-4d34-97d5-23022b0e269b/RES-0000/TEN-0001/10943961 | 2024-11-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284040; 8eb0a552-2eb1-4b59-a7da-99cad2028981/da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/TEN-0008/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309537; 900e2982-58d4-4d4e-911e-d2f3754448b1/558df926-0967-4dba-9924-8eb20dda1ff9/RES-0000/TEN-0003/10943961 | 2025-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292179; 98c63a7e-8d09-4e86-99d0-3fd683d0ad25/e7e070aa-6c61-4b55-9935-c61437e8c533/RES-0000/TEN-0001/10943961 | 2026-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308888; 9ee89892-8992-40d2-b82e-336943dbf13d/5871a05f-768b-4d23-82d0-d082e7b3dcee/RES-0000/TEN-0001/10943961 | 2026-01-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304598; dd745897-c554-423e-9892-09820ecb1c02/a48aa6e6-4844-4097-aa81-06f2fd5074b1/RES-0000/TEN-0001/10943961 | 2024-10-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283676; fce111f6-d794-470a-bb8e-4ea20fa91a47/bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/TEN-0001/10943961 | 2026-06-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308721; ff8a2915-6434-4407-b6b7-216076fb5f6d/f3420cf4-e590-43ea-98aa-5a0c7c33247d/RES-0000/TEN-0001/10943961 | 2024-04-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/278190 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/10943961 · 2026-07-01

ariregister:10943961 · 2003-06-19

4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/10943961 · 2026-07-01

00beadb3-7b0d-4c9a-ab01-83b28bb206ad/63427d6c-c1c4-4567-b509-a865bf2ccbcd/RES-0000/TEN-0001/10943961 · 2025-10-30

01692274-7957-4adb-8209-574647833f5a/f469882c-461b-407f-b536-e528f46978df/RES-0000/TEN-0001/10943961 · 2026-03-18

063bce88-fd69-472a-aa48-cc539c88af13/e132e274-723c-463c-a224-f5b871233339/RES-0000/TEN-0001/10943961 · 2025-05-06

0bc5b084-4074-47ca-9fd5-3b6465102d30/c0cd0351-07a8-4b68-8ab7-6e07b7dda3de/RES-0000/TEN-0001/10943961 · 2024-11-18

1020256a-5022-46ca-aad4-27ce1c79d305/1a4e892e-fe06-4c65-825c-a8c3d9555bda/RES-0000/TEN-0001/10943961 · 2024-10-10

134ca161-b823-4638-843d-30702425ce4c/3084a564-f05a-434d-a210-423324d3b155/RES-0000/TEN-0001/10943961 · 2024-04-18

1b54cc03-95c9-4169-b07c-1495b3d7dccd/0ad21cfc-a1a1-472c-98e7-63deeaab7683/RES-0000/TEN-0001/10943961 · 2026-02-27

2805998b-399e-434c-8611-3be5e51e7f5d/4f81cf1c-ae9e-47e0-b9fc-95c6251c0e02/RES-0000/TEN-0001/10943961 · 2024-11-04

2e845002-ce44-499a-95af-e03e431a6035/e7710e58-d9ec-4051-aa91-14d432a96f95/RES-0000/TEN-0001/10943961 · 2025-02-26

3893ad45-4558-43b3-b899-42a2624465f6/19bb48c6-96ed-4c5c-9f6e-0f7adee03440/RES-0000/TEN-0001/10943961 · 2024-10-29

3a683cb1-83d3-4f5a-bc76-114b80f3c942/3b586dd8-9e74-4927-a3b0-296a30d082f7/RES-0000/TEN-0005/10943961 · 2025-05-16

3fb579c7-ee70-42b5-bfde-68fc5d54233c/92727805-677b-4f26-9650-ea48a163ee90/RES-0000/TEN-0001/10943961 · 2025-01-16

4181bea1-3a56-4196-abb9-89c09f56f99f/1d14fd90-124c-490a-a8cc-7aa45727138e/RES-0000/TEN-0002/10943961 · 2024-07-24

547c9e2d-9290-4058-a9e2-af43ee581b8f/4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/TEN-0006/10943961 · 2026-07-01

577a1b5b-5fa2-4340-b446-3eac9dd5b407/d5809083-01b7-4e07-8fa2-148db94dcb91/RES-0000/TEN-0001/10943961 · 2026-02-05

59d8b957-475c-44c7-9bb0-ade360e9eee9/cdf46678-4ae6-4878-9d3b-47a58ededb08/RES-0000/TEN-0002/10943961 · 2024-07-24

5d265f93-3f1e-4388-92c9-f0f7bc40386b/4c45e8a6-b6b8-4c92-b4c2-c03dea9652c0/RES-0000/TEN-0001/10943961 · 2024-10-02

6d8b6090-904a-4aed-8193-57d218ec61eb/d34b9db9-9bc0-48a0-82fb-dccd93278058/RES-0000/TEN-0001/10943961 · 2025-01-31

6e6f81ed-bc7a-4372-a81d-2f7f72e48ac8/04bee412-94b1-448d-b93e-fbd2824267bd/RES-0000/TEN-0001/10943961 · 2024-07-10

73596a58-ef47-4797-b7a3-9497b5bbf036/684b53cd-83d5-44ef-b9d7-af9579d1627f/RES-0000/TEN-0001/10943961 · 2026-02-23

76c226e0-8123-4f80-9a18-79d31982e03b/3b1d0271-d2f3-4ab0-b8ee-b567d1bbee8b/RES-0000/TEN-0006/10943961 · 2025-05-28

7e9b734a-026b-433b-b6cf-7d5589267393/d323edd8-5f5a-44cf-ac2f-df973264c852/RES-0000/TEN-0001/10943961 · 2025-04-28

7ff43d8d-fdf8-471b-9498-dad47c066e94/0ba9cfd2-77bf-4368-8046-6ebbcb1eaf20/RES-0000/TEN-0001/10943961 · 2026-02-04

8ad909ee-c268-4926-9de4-15b261b8e549/9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/TEN-0009/10943961 · 2026-07-01

8d110d95-f3a9-492d-abd7-1fa21aaa7d1b/7b20cfcb-749e-4661-b6a4-f0dda39cdcdd/RES-0000/TEN-0001/10943961 · 2025-09-30

8d77d459-6877-4326-a887-cd1bf399f2fe/67f482a5-279d-4d34-97d5-23022b0e269b/RES-0000/TEN-0001/10943961 · 2024-11-04

8eb0a552-2eb1-4b59-a7da-99cad2028981/da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/TEN-0008/10943961 · 2026-07-01

900e2982-58d4-4d4e-911e-d2f3754448b1/558df926-0967-4dba-9924-8eb20dda1ff9/RES-0000/TEN-0003/10943961 · 2025-06-16

98c63a7e-8d09-4e86-99d0-3fd683d0ad25/e7e070aa-6c61-4b55-9935-c61437e8c533/RES-0000/TEN-0001/10943961 · 2026-05-27

9ee89892-8992-40d2-b82e-336943dbf13d/5871a05f-768b-4d23-82d0-d082e7b3dcee/RES-0000/TEN-0001/10943961 · 2026-01-16

dd745897-c554-423e-9892-09820ecb1c02/a48aa6e6-4844-4097-aa81-06f2fd5074b1/RES-0000/TEN-0001/10943961 · 2024-10-10

fce111f6-d794-470a-bb8e-4ea20fa91a47/bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/TEN-0001/10943961 · 2026-06-11

ff8a2915-6434-4407-b6b7-216076fb5f6d/f3420cf4-e590-43ea-98aa-5a0c7c33247d/RES-0000/TEN-0001/10943961 · 2024-04-17

Valga maakond, Tsirguliina 330/110/10 kV alajaama 10 kV jaotusseadme rekonstrueerimine (IK1099) · 11.06.2026

Incorporated < 90 days before decision: Rule not met; ; ; bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/10943961 | 2026-06-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308721; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/10943961 | 2026-06-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308721 Repeated recorded procedures: Indicator present; Distinct procedures: 33; Retained award dates: 2024-04-17 – 2026-07-01; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 00beadb3-7b0d-4c9a-ab01-83b28bb206ad/63427d6c-c1c4-4567-b509-a865bf2ccbcd/RES-0000/TEN-0001/10943961 | 2025-10-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301751; 01692274-7957-4adb-8209-574647833f5a/f469882c-461b-407f-b536-e528f46978df/RES-0000/TEN-0001/10943961 | 2026-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303907; 063bce88-fd69-472a-aa48-cc539c88af13/e132e274-723c-463c-a224-f5b871233339/RES-0000/TEN-0001/10943961 | 2025-05-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/293472; 0bc5b084-4074-47ca-9fd5-3b6465102d30/c0cd0351-07a8-4b68-8ab7-6e07b7dda3de/RES-0000/TEN-0001/10943961 | 2024-11-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286775; 1020256a-5022-46ca-aad4-27ce1c79d305/1a4e892e-fe06-4c65-825c-a8c3d9555bda/RES-0000/TEN-0001/10943961 | 2024-10-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284986; 134ca161-b823-4638-843d-30702425ce4c/3084a564-f05a-434d-a210-423324d3b155/RES-0000/TEN-0001/10943961 | 2024-04-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277749; 1b54cc03-95c9-4169-b07c-1495b3d7dccd/0ad21cfc-a1a1-472c-98e7-63deeaab7683/RES-0000/TEN-0001/10943961 | 2026-02-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306352; 2805998b-399e-434c-8611-3be5e51e7f5d/4f81cf1c-ae9e-47e0-b9fc-95c6251c0e02/RES-0000/TEN-0001/10943961 | 2024-11-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284041; 2e845002-ce44-499a-95af-e03e431a6035/e7710e58-d9ec-4051-aa91-14d432a96f95/RES-0000/TEN-0001/10943961 | 2025-02-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290598; 3893ad45-4558-43b3-b899-42a2624465f6/19bb48c6-96ed-4c5c-9f6e-0f7adee03440/RES-0000/TEN-0001/10943961 | 2024-10-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/285584; 3a683cb1-83d3-4f5a-bc76-114b80f3c942/3b586dd8-9e74-4927-a3b0-296a30d082f7/RES-0000/TEN-0005/10943961 | 2025-05-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292267; 3fb579c7-ee70-42b5-bfde-68fc5d54233c/92727805-677b-4f26-9650-ea48a163ee90/RES-0000/TEN-0001/10943961 | 2025-01-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288696; 4181bea1-3a56-4196-abb9-89c09f56f99f/1d14fd90-124c-490a-a8cc-7aa45727138e/RES-0000/TEN-0002/10943961 | 2024-07-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280495; 547c9e2d-9290-4058-a9e2-af43ee581b8f/4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/TEN-0006/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309461; 577a1b5b-5fa2-4340-b446-3eac9dd5b407/d5809083-01b7-4e07-8fa2-148db94dcb91/RES-0000/TEN-0001/10943961 | 2026-02-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304796; 59d8b957-475c-44c7-9bb0-ade360e9eee9/cdf46678-4ae6-4878-9d3b-47a58ededb08/RES-0000/TEN-0002/10943961 | 2024-07-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280494; 5d265f93-3f1e-4388-92c9-f0f7bc40386b/4c45e8a6-b6b8-4c92-b4c2-c03dea9652c0/RES-0000/TEN-0001/10943961 | 2024-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281211; 6d8b6090-904a-4aed-8193-57d218ec61eb/d34b9db9-9bc0-48a0-82fb-dccd93278058/RES-0000/TEN-0001/10943961 | 2025-01-31 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/289606; 6e6f81ed-bc7a-4372-a81d-2f7f72e48ac8/04bee412-94b1-448d-b93e-fbd2824267bd/RES-0000/TEN-0001/10943961 | 2024-07-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281859; 73596a58-ef47-4797-b7a3-9497b5bbf036/684b53cd-83d5-44ef-b9d7-af9579d1627f/RES-0000/TEN-0001/10943961 | 2026-02-23 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306148; 76c226e0-8123-4f80-9a18-79d31982e03b/3b1d0271-d2f3-4ab0-b8ee-b567d1bbee8b/RES-0000/TEN-0006/10943961 | 2025-05-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290089; 7e9b734a-026b-433b-b6cf-7d5589267393/d323edd8-5f5a-44cf-ac2f-df973264c852/RES-0000/TEN-0001/10943961 | 2025-04-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292796; 7ff43d8d-fdf8-471b-9498-dad47c066e94/0ba9cfd2-77bf-4368-8046-6ebbcb1eaf20/RES-0000/TEN-0001/10943961 | 2026-02-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304896; 8ad909ee-c268-4926-9de4-15b261b8e549/9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/TEN-0009/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309543; 8d110d95-f3a9-492d-abd7-1fa21aaa7d1b/7b20cfcb-749e-4661-b6a4-f0dda39cdcdd/RES-0000/TEN-0001/10943961 | 2025-09-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300089; 8d77d459-6877-4326-a887-cd1bf399f2fe/67f482a5-279d-4d34-97d5-23022b0e269b/RES-0000/TEN-0001/10943961 | 2024-11-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/284040; 8eb0a552-2eb1-4b59-a7da-99cad2028981/da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/TEN-0008/10943961 | 2026-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309537; 900e2982-58d4-4d4e-911e-d2f3754448b1/558df926-0967-4dba-9924-8eb20dda1ff9/RES-0000/TEN-0003/10943961 | 2025-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292179; 98c63a7e-8d09-4e86-99d0-3fd683d0ad25/e7e070aa-6c61-4b55-9935-c61437e8c533/RES-0000/TEN-0001/10943961 | 2026-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308888; 9ee89892-8992-40d2-b82e-336943dbf13d/5871a05f-768b-4d23-82d0-d082e7b3dcee/RES-0000/TEN-0001/10943961 | 2026-01-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/304598; dd745897-c554-423e-9892-09820ecb1c02/a48aa6e6-4844-4097-aa81-06f2fd5074b1/RES-0000/TEN-0001/10943961 | 2024-10-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/283676; fce111f6-d794-470a-bb8e-4ea20fa91a47/bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/TEN-0001/10943961 | 2026-06-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308721; ff8a2915-6434-4407-b6b7-216076fb5f6d/f3420cf4-e590-43ea-98aa-5a0c7c33247d/RES-0000/TEN-0001/10943961 | 2024-04-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/278190 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/10943961 · 2026-06-11

ariregister:10943961 · 2003-06-19

bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/10943961 · 2026-06-11

00beadb3-7b0d-4c9a-ab01-83b28bb206ad/63427d6c-c1c4-4567-b509-a865bf2ccbcd/RES-0000/TEN-0001/10943961 · 2025-10-30

01692274-7957-4adb-8209-574647833f5a/f469882c-461b-407f-b536-e528f46978df/RES-0000/TEN-0001/10943961 · 2026-03-18

063bce88-fd69-472a-aa48-cc539c88af13/e132e274-723c-463c-a224-f5b871233339/RES-0000/TEN-0001/10943961 · 2025-05-06

0bc5b084-4074-47ca-9fd5-3b6465102d30/c0cd0351-07a8-4b68-8ab7-6e07b7dda3de/RES-0000/TEN-0001/10943961 · 2024-11-18

1020256a-5022-46ca-aad4-27ce1c79d305/1a4e892e-fe06-4c65-825c-a8c3d9555bda/RES-0000/TEN-0001/10943961 · 2024-10-10

134ca161-b823-4638-843d-30702425ce4c/3084a564-f05a-434d-a210-423324d3b155/RES-0000/TEN-0001/10943961 · 2024-04-18

1b54cc03-95c9-4169-b07c-1495b3d7dccd/0ad21cfc-a1a1-472c-98e7-63deeaab7683/RES-0000/TEN-0001/10943961 · 2026-02-27

2805998b-399e-434c-8611-3be5e51e7f5d/4f81cf1c-ae9e-47e0-b9fc-95c6251c0e02/RES-0000/TEN-0001/10943961 · 2024-11-04

2e845002-ce44-499a-95af-e03e431a6035/e7710e58-d9ec-4051-aa91-14d432a96f95/RES-0000/TEN-0001/10943961 · 2025-02-26

3893ad45-4558-43b3-b899-42a2624465f6/19bb48c6-96ed-4c5c-9f6e-0f7adee03440/RES-0000/TEN-0001/10943961 · 2024-10-29

3a683cb1-83d3-4f5a-bc76-114b80f3c942/3b586dd8-9e74-4927-a3b0-296a30d082f7/RES-0000/TEN-0005/10943961 · 2025-05-16

3fb579c7-ee70-42b5-bfde-68fc5d54233c/92727805-677b-4f26-9650-ea48a163ee90/RES-0000/TEN-0001/10943961 · 2025-01-16

4181bea1-3a56-4196-abb9-89c09f56f99f/1d14fd90-124c-490a-a8cc-7aa45727138e/RES-0000/TEN-0002/10943961 · 2024-07-24

547c9e2d-9290-4058-a9e2-af43ee581b8f/4a392443-fea9-475d-81d2-ce8572bbc403/RES-0000/TEN-0006/10943961 · 2026-07-01

577a1b5b-5fa2-4340-b446-3eac9dd5b407/d5809083-01b7-4e07-8fa2-148db94dcb91/RES-0000/TEN-0001/10943961 · 2026-02-05

59d8b957-475c-44c7-9bb0-ade360e9eee9/cdf46678-4ae6-4878-9d3b-47a58ededb08/RES-0000/TEN-0002/10943961 · 2024-07-24

5d265f93-3f1e-4388-92c9-f0f7bc40386b/4c45e8a6-b6b8-4c92-b4c2-c03dea9652c0/RES-0000/TEN-0001/10943961 · 2024-10-02

6d8b6090-904a-4aed-8193-57d218ec61eb/d34b9db9-9bc0-48a0-82fb-dccd93278058/RES-0000/TEN-0001/10943961 · 2025-01-31

6e6f81ed-bc7a-4372-a81d-2f7f72e48ac8/04bee412-94b1-448d-b93e-fbd2824267bd/RES-0000/TEN-0001/10943961 · 2024-07-10

73596a58-ef47-4797-b7a3-9497b5bbf036/684b53cd-83d5-44ef-b9d7-af9579d1627f/RES-0000/TEN-0001/10943961 · 2026-02-23

76c226e0-8123-4f80-9a18-79d31982e03b/3b1d0271-d2f3-4ab0-b8ee-b567d1bbee8b/RES-0000/TEN-0006/10943961 · 2025-05-28

7e9b734a-026b-433b-b6cf-7d5589267393/d323edd8-5f5a-44cf-ac2f-df973264c852/RES-0000/TEN-0001/10943961 · 2025-04-28

7ff43d8d-fdf8-471b-9498-dad47c066e94/0ba9cfd2-77bf-4368-8046-6ebbcb1eaf20/RES-0000/TEN-0001/10943961 · 2026-02-04

8ad909ee-c268-4926-9de4-15b261b8e549/9f464518-d252-4959-b748-0a8c6e67eda7/RES-0000/TEN-0009/10943961 · 2026-07-01

8d110d95-f3a9-492d-abd7-1fa21aaa7d1b/7b20cfcb-749e-4661-b6a4-f0dda39cdcdd/RES-0000/TEN-0001/10943961 · 2025-09-30

8d77d459-6877-4326-a887-cd1bf399f2fe/67f482a5-279d-4d34-97d5-23022b0e269b/RES-0000/TEN-0001/10943961 · 2024-11-04

8eb0a552-2eb1-4b59-a7da-99cad2028981/da0cc149-bbc8-472d-941e-618384c851b5/RES-0000/TEN-0008/10943961 · 2026-07-01

900e2982-58d4-4d4e-911e-d2f3754448b1/558df926-0967-4dba-9924-8eb20dda1ff9/RES-0000/TEN-0003/10943961 · 2025-06-16

98c63a7e-8d09-4e86-99d0-3fd683d0ad25/e7e070aa-6c61-4b55-9935-c61437e8c533/RES-0000/TEN-0001/10943961 · 2026-05-27

9ee89892-8992-40d2-b82e-336943dbf13d/5871a05f-768b-4d23-82d0-d082e7b3dcee/RES-0000/TEN-0001/10943961 · 2026-01-16

dd745897-c554-423e-9892-09820ecb1c02/a48aa6e6-4844-4097-aa81-06f2fd5074b1/RES-0000/TEN-0001/10943961 · 2024-10-10

fce111f6-d794-470a-bb8e-4ea20fa91a47/bfcd09d3-f968-43a2-80fa-ee13d5cae538/RES-0000/TEN-0001/10943961 · 2026-06-11

ff8a2915-6434-4407-b6b7-216076fb5f6d/f3420cf4-e590-43ea-98aa-5a0c7c33247d/RES-0000/TEN-0001/10943961 · 2024-04-17

Heino Lipu staadioni tribüünikatuse ehitus · 10.06.2026

Incorporated < 90 days before decision: Rule not met; ; ; c2ab96c5-72b4-4c1f-87ee-4917f9ece13c/RES-0000/10943961 | 2026-06-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307660; ariregister:10943961 | 2003-06-19 | https://ariregister.rik.ee/est/company/10943961 One tender reported: Rule not met; ; ; c2ab96c5-72b4-4c1f-87ee-4917f9ece13c/RES-0000/10943961 | 2026-06-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307660 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-06-10 – 2026-06-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; f361a37b-923c-4af1-9e6c-e4a8f874afc7/c2ab96c5-72b4-4c1f-87ee-4917f9ece13c/RES-0000/TEN-0001/10943961 | 2026-06-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307660 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

c2ab96c5-72b4-4c1f-87ee-4917f9ece13c/RES-0000/10943961 · 2026-06-10

ariregister:10943961 · 2003-06-19

c2ab96c5-72b4-4c1f-87ee-4917f9ece13c/RES-0000/10943961 · 2026-06-10

f361a37b-923c-4af1-9e6c-e4a8f874afc7/c2ab96c5-72b4-4c1f-87ee-4917f9ece13c/RES-0000/TEN-0001/10943961 · 2026-06-10

Showing 10 · View market winners

Source: Riigihangete register · Riigihangete register: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What changed in the company history (snapshot 10.11.2026)?

TERASTEENUS OÜ: the timeline shows historical events, not an assessment of current status (source: Äriregister, EMTA, Ametlikud Teadaanded, RAR; snapshot: 10.11.2026).

#ajajoonSnapshot

2026

Reports, taxes and grants (3)
  • Tax Board 2026 III: turnover €4.08m, employees: 71
    taxes
  • Tax Board 2026 II: turnover €2.98m, employees: 71
    taxes
  • Tax Board 2026 I: turnover €3.2m, employees: 65
    taxes

2025

Reports, taxes and grants (1)
  • Tax Board 2025 IV: turnover €6.74m, employees: 62
    taxes

2012

  • Share capital changed: 40000.0 EEK → €2,556
    register

2003

  • Name changed: OÜ BLANKOR TRADE → TERASTEENUS OÜ
    register
  • Entered in the business register
    register
  • Share capital changed: missing → 40000.0 EEK
    register
  • Name changed: missing → OÜ BLANKOR TRADE
    register
  • Status changed: missing → in the register
    register

Showing 10 / 29

Events: 29 · newest first · Sources: Business Register, Tax Board, RTK, Official Notices

Which sources supply the data (snapshot 10.11.2026)?

TERASTEENUS OÜ: displayed source records 9 (source: Äriregister, EMTA, RTK, MTR, Keskkonnaamet, Ametlikud Teadaanded, Riigi kinnisvararegister, Riigihangete register, RIK laevakinnistusraamat; snapshot: 10.11.2026).

#allikadSnapshot
View Markdown

↔ Scroll horizontally to see all columns.

Block, source, licence, period, vintage and official link
BlockSourceLicenceExpected cadenceSource observationSnapshotCheckedOfficial record
Business RegisterÄriregisterCC BY 4.0nightlySource observation date unknown10.11.2026 19:4410.11.2026open ↗
TaxesEMTACC BY-SA 3.0quarterly tax figures / daily debt listDebt list observed: 09.11.2026 · daily debt list10.11.2026 19:4410.11.2026open ↗
GrantsRTKCC BY-SA 3.0 (Euroopa Liidu struktuuritoetus). RAR: AvTS § 3¹ lg 9.missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
LicencesMTRCC BY-SA 3.0missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
LicencesKeskkonnaametAvTS § 3¹ lg 9missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
AnnouncementsAmetlikud TeadaandedCC BY-SA 4.0nightlyLatest retained notice published: 09.11.2026 · Source observation date unknown10.11.2026 19:4410.11.2026open ↗
State propertyRiigi kinnisvararegisterCC0 1.0missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
Public procurementRiigihangete registerCC BY-SA 3.0nightlySource observation date unknown10.11.2026 19:4410.11.2026open ↗
missingRIK laevakinnistusraamatCC BY-SA 4.0missingSource observation date unknownmissingmissingopen ↗
Court decisions, trademarks, sanctionssource missing — a company-level link has not been published yet; this does not mean there are no records
Dates and their basis

Source observation is the source’s own as-of date; the latest notice publication does not prove observation. Snapshot is the data extract publication time. Checked is the source availability check. Missing clocks are not inferred from other dates.

Shortcuts

Quick search/ Ctrl+K
Home · Sectors · Regionsg h · g s · g r
Grants · Procurement · Compare · Watchlistg t · g k · g v · g j
In a table: move · open · compare · watchjk · ↵ · c · w
On a company page: sections1–9
←→↑↓ · Home · End

Use arrow keys to explore data points. Home and End move to the first and last point.

Close / backesc