OÜ BauEst

In the registerRegistry code: 11220064

OÜ BauEst: 2025 revenue 30,913,120 €, net profit 2,103,558 € (Company only). 53 employees, 2025 annual average (Company only). Äriregister. Snapshot: 10.11.2026.

  • Current tax-debt statusNot listedEMTA. Observation: 09.11.2026Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.
  • Report 2025FiledÄriregisterCompany only
  • NoticesNo warning noticesAmetlikud Teadaanded. Observation: 09.11.2026
  • Revenue 202530,913,120 €ÄriregisterCompany only
  • Employees 202553Äriregisterannual average; Company only

Place in the peer group

EMTAK 41001, Harju County, 2025

Revenue 2025, company only, n = 2,372 filed reports

0100p25p50 (median)p7523,029 €67,647 €271,124 €OÜ BauEst30,913,120 €, p1000100p25medianp7523,029 €67,647 €271,124 €OÜ BauEst30,913,120 €, p100

marker = company, band = p25–p75, axis = percentile 0–100

The company against its peer group by metric, 2025 · Company only
MetricCompanyMedianPer­cen­tile
Revenue30,913,120 €67,647 €p100 (n = 2,372)
Net profit2,103,558 €785 €p100 (n = 3,038)
Equity4,631,431 €17,035 €p99 (n = 3,054)
Employees531p100 (n = 3,049)

Each percentile is computed separately, so n differs; hidden below 5 companies; medians and quartiles in whole euros (rounded). Source: Business Register (annual reports), snapshot 10.11.2026.

Not an official extract; no credit rating is provided.

Register details and contacts
Registered name
OÜ BauEst
Registry code
11220064
Status
in the register (R)
Legal form
Private limited company
Registered
07.02.2006
Share capital
9,588 €
VAT number
EE101031606
Address
Harju County · Rae vald, Peetri alevik, Tuleviku tee 10
Website
bauest.ee

Source: Business Register (open data), CC BY 4.0

Names of current board members load in the interactive view.

Report coverage

Annual reports found in our data as of 2026-11-10

Cohort: R-status OÜs registered before 2023, with a 31 December fiscal year end. Years 2024 and 2025 are fixed, independent of the financial benchmark year. Sector and county use current principal company details.

Absence from our data is not evidence of non-filing. Each company counts once per year, including zero or missing revenue. Completeness of national coverage is unknown.

Source extract cutoff: 2026-10-31

↔ Scroll horizontally to see all columns.

Report coverage
Fiscal yearData status
2024Found in data
2025Found in data
Äriregister · CC BY 4.0; calculations by Ärikratt2026-11-10

OÜ BauEst is a private limited company. In 2025, revenue grew 153 % to 30,913,120 €, profit was 2,103,558 € (previous year -191,390 €). The main activity is NACE class: Construction of residential and non-residential buildings (41001). The company is located in Harju County. Registered 07.02.2006. Share capital is 9,588 €. 2025 annual-report figures (Company only): annual average employees 53. Taxes for III quarter of 2026 were 479,992 €. Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026. There are 23 state aid and grant records. There are 4 activity-licence records (including history). There are 53 single-winner procurement wins (2023–2026); recorded contract/framework ceiling value 59,108,402.43 €, not actual payments. Shared-award ceilings are recorded separately and are not added to this company total.

What are the company indicators (2025)?

OÜ BauEst: revenue 30,913,120 € (period: 2025; company only; source: Äriregister; snapshot: 10.11.2026).

#naitajadSnapshot

Annual-report figures: Company only Tax data refers to this legal entity.

Peer group: 41001 · Harju County · 2025 · n = 2,372

↔ Scroll horizontally to see all columns.

Key figures
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
RevenueRevenue: 2019 to 2025, min 2020 · 10,637,460 €, max 2025 · 30,913,120 €, latest 2025 · 30,913,120 €2019 – 202530,913,120 €+153 %p100 (n = 2372)2025; Company onlyRIKchecked 10.11.2026Δ: +153 %Position: p100 (n = 2372)2025; Company onlyRIKAs of: checked 10.11.2026
Net profitNet profit: 2019 to 2025, min 2021 · -300,341 €, max 2023 · 2,643,924 €, latest 2025 · 2,103,558 €2019 – 20252,103,558 €—p100 (n = 3038)2025 · margin 6.8 % (previous year -1.6 %) · change hidden (near-zero base or over 500%); Company onlyRIKchecked 10.11.2026Position: p100 (n = 3038)2025 · margin 6.8 % (previous year -1.6 %) · change hidden (near-zero base or over 500%); Company onlyRIKAs of: checked 10.11.2026
EquityEquity: 2019 to 2025, min 2021 · 1,044,420 €, max 2025 · 4,631,431 €, latest 2025 · 4,631,431 €2019 – 20254,631,431 €—p99 (n = 3054)2025 · share of assets 51 % (previous year 44.2 %); Company onlyRIKchecked 10.11.2026Position: p99 (n = 3054)2025 · share of assets 51 % (previous year 44.2 %); Company onlyRIKAs of: checked 10.11.2026
EmployeesEmployees: 2019 to 2025, min 2019 · 40, max 2025 · 53, latest 2025 · 532019 – 202553—p100 (n = 3049)2025; Company onlyRIKchecked 10.11.2026Position: p100 (n = 3049)2025; Company onlyRIKAs of: checked 10.11.2026
Turnover per the Tax BoardTurnover per the Tax Board: 2022 I to 2026 III, min 2024 II · 1,565,393 €, max 2025 II · 9,505,761 €, latest 2026 III · 8,955,246 €2022 I – 2026 III8,274,127 €——2025 IV · VAT registered; Company onlyMTAchecked 10.11.20262025 IV · VAT registered; Company onlyMTAAs of: checked 10.11.2026
State taxesState taxes: 2022 I to 2026 III, min 2022 I · 208,736 €, max 2026 II · 838,620 €, latest 2026 III · 479,992 €2022 I – 2026 III396,778 €——2025 IV; Company onlyMTAchecked 10.11.20262025 IV; Company onlyMTAAs of: checked 10.11.2026
Labour taxesLabour taxes: 2022 I to 2026 III, min 2022 I · 141,105 €, max 2026 III · 308,957 €, latest 2026 III · 308,957 €2022 I – 2026 III302,573 €——2025 IV; Company onlyMTAchecked 10.11.20262025 IV; Company onlyMTAAs of: checked 10.11.2026
State aid received309,933.03 €——23 decisions · latest 2026RARsnapshot 10.11.202623 decisions · latest 2026RARAs of: snapshot 10.11.2026
Report 2025filed———RIKchecked 10.11.2026RIKAs of: checked 10.11.2026

EMTA: state taxes are paid taxes net of refunds; labour taxes are paid income and social tax plus pension and unemployment insurance contributions.

The percentile (p) is the company rank among peers in the same activity and county in the same year. It is hidden when fewer than 5 companies qualify. Each figure shows its period and source.

Which legal entities are related to the company (snapshot 10.11.2026)?

OÜ BauEst: ownership links are between legal entities only; shared-board links show companies, not people (source: Äriregister; snapshot: 10.11.2026).

#seosedSnapshot

Dated register facts. No signals does not confirm the absence of liabilities.

Owners and holdings

Observation dates, not legal sale or transfer dates. History starts 2026-07-29 and is incomplete.

Business Register shareholders · Natural-person owners are hidden, so the percentages may stay below 100 %.

State property contracts

Fees exclude VAT; currency is unknown. Each fee has its own period. Never sum or annualise fees. Types and statuses are source assertions; this is not a general property ownership register.

Rows on this page / total records: 1 / 1

Download this page as CSV

Active (1)

State property contracts · Active
Contract codeContract type (source)Subtype (source)Company’s roleSource statusValid from (source)Valid until (source)Concluded on (source)Ended on (source)Source feeVAT applies (source)
LL25-3252Grant use · KASUTANDmaa rentimineReceiving partyActive2025-10-172027-06-30UnknownUnknown4,100, currency unknown, per year, excluding VATNo (source assertion)

Source: Riigi kinnisvararegister · CC0 1.0

Companies sharing a board member

RIK

Same query via MCP

Source: Äriregister · Riigi kinnisvararegister · Äriregister: Source observation date unknown · Riigi kinnisvararegister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What are the company signals (snapshot 10.11.2026)?

we count and cite; we do not grade

OÜ BauEst: Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026.

#signaalidSnapshot

Board appointments: 2 active appointments during 10.11.2025–09.11.2026; latest 18.09.2026. Source: RIK, as of 09.11.2026. Management board members only; the first 30 days after founding are excluded. RIK

↔ Scroll horizontally to see all columns.

Public signals
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Current tax-debt statusNot on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.Check directly: EMTA ———EMTA09.11.2026EMTAAs of: 09.11.2026
Debt episode (history)missing——off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTA09.11.2026off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTAAs of: 09.11.2026
Annual reportsReport 2025 filed———RIKchecked 10.11.2026RIKAs of: checked 10.11.2026
Official noticesNo bankruptcy, liquidation, restructuring or enforcement notices——5 yearsAmetlikud Teadaandedchecked 10.11.20265 yearsAmetlikud TeadaandedAs of: checked 10.11.2026
StatusStatus changes: 1——status history: 5 entriesRIKchecked 10.11.2026status history: 5 entriesRIKAs of: checked 10.11.2026
Composite signal (derived)LowviewDistress score trend: 19.09.2026 10:15 to 26.09.2026 15:13, min 26.09.2026 15:13 · 10 / 100, max 19.09.2026 10:15 · 20 / 100, latest 26.09.2026 15:13 · 10 / 10019.09.2026 10:15 – 26.09.2026 15:13——Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt—Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt
Commercial pledge2 pledges · total 750,040.57 €——latest entry 19.02.2025 · pledgee names withheldRIKchecked 10.11.2026latest entry 19.02.2025 · pledgee names withheldRIKAs of: checked 10.11.2026
Court decisions · sanctions · trademarkssource missing——a company-level link has not been published yet——a company-level link has not been published yet
Composite signal components (derived, not an official score)

Score (derived) 10/100 derived

A composite signal from structured data, not an official assessment or credit rating. It describes data known at calculation time; no forecast horizon is specified.

Calculated 10.11.2026 10:15.

Methodology version: 1.3.

Stored component contributions

  1. Tax debt · 0 points
  2. Financial health · 0 points
  3. Board changes · 10 points
    View stored evidence

    Stored contribution: 10 points.

  4. Insolvency notices · 0 points
  5. Licence loss · 0 points

A stored 0 proves neither absence of events nor complete source coverage. Without detail, its cause is unknown.

The underlying record reference is unavailable. No specific event or document can be identified.

methodology

Calculated 10.11.2026 10:15. The score is not a credit rating and not a default forecast. methodology · The score is not a credit rating

Snapshot: Äriregister: 10.11.2026 19:44 · EMTA: 10.11.2026 19:44 · Ametlikud Teadaanded: 10.11.2026 19:44
Source: Äriregister · EMTA · Ametlikud TeadaandedLatest available report year: 2025 (annual reporting) · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · Score calculated: 10.11.2026 · Calculation and snapshot publication do not establish source freshness · Äriregister: Source observation date unknown · EMTA: Debt list observed: 09.11.2026 · daily debt list · Ametlikud Teadaanded: Latest retained notice published: 09.11.2026 · Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026View company sourcesAll sources and licences

What are the company financial results (2025)?

OÜ BauEst: net profit 2,103,558 € (period: 2025; company only; source: Äriregister; snapshot: 10.11.2026).

#finantsSnapshot

2025 · Company only: revenue 30,913,120 €, net profit 2,103,558 €.

Annual reports 2019–2025

↔ Scroll horizontally to see all columns.

Financials
MetricValueΔPeriod and basisSourceAs ofComparison and sources
Revenue30,913,120 €+153 %2025; Company onlyRIKchecked 10.11.2026Δ: +153 %2025; Company onlyRIKAs of: checked 10.11.2026
Net profit2,103,558 €—2025; Company onlyRIKchecked 10.11.20262025; Company onlyRIKAs of: checked 10.11.2026
Equity4,631,431 €+83.2 %2025; Company onlyRIKchecked 10.11.2026Δ: +83.2 %2025; Company onlyRIKAs of: checked 10.11.2026
Assets9,073,177 €+58.6 %2025; Company onlyRIKchecked 10.11.2026Δ: +58.6 %2025; Company onlyRIKAs of: checked 10.11.2026
Employees53+17.8 %2025; Company onlyRIKchecked 10.11.2026Δ: +17.8 %2025; Company onlyRIKAs of: checked 10.11.2026
Revenue12,216,607 €-52.8 %2024; Company onlyRIKchecked 10.11.2026Δ: -52.8 %2024; Company onlyRIKAs of: checked 10.11.2026
Net profit-191,390 €-107.2 %2024; Company onlyRIKchecked 10.11.2026Δ: -107.2 %2024; Company onlyRIKAs of: checked 10.11.2026
Equity2,527,873 €-33.1 %2024; Company onlyRIKchecked 10.11.2026Δ: -33.1 %2024; Company onlyRIKAs of: checked 10.11.2026
Assets5,721,806 €-28.9 %2024; Company onlyRIKchecked 10.11.2026Δ: -28.9 %2024; Company onlyRIKAs of: checked 10.11.2026
Employees45-6.3 %2024; Company onlyRIKchecked 10.11.2026Δ: -6.3 %2024; Company onlyRIKAs of: checked 10.11.2026
Revenue25,902,274 €+45.2 %2023; Company onlyRIKchecked 10.11.2026Δ: +45.2 %2023; Company onlyRIKAs of: checked 10.11.2026
Net profit2,643,924 €—2023; Company onlyRIKchecked 10.11.20262023; Company onlyRIKAs of: checked 10.11.2026
Equity3,776,063 €+192.2 %2023; Company onlyRIKchecked 10.11.2026Δ: +192.2 %2023; Company onlyRIKAs of: checked 10.11.2026
Assets8,050,278 €+105.6 %2023; Company onlyRIKchecked 10.11.2026Δ: +105.6 %2023; Company onlyRIKAs of: checked 10.11.2026
Employees48+2.1 %2023; Company onlyRIKchecked 10.11.2026Δ: +2.1 %2023; Company onlyRIKAs of: checked 10.11.2026
Revenue17,837,583 €+13.5 %2022; Company onlyRIKchecked 10.11.2026Δ: +13.5 %2022; Company onlyRIKAs of: checked 10.11.2026
Net profit247,719 €+182.5 %2022; Company onlyRIKchecked 10.11.2026Δ: +182.5 %2022; Company onlyRIKAs of: checked 10.11.2026
Equity1,292,139 €+23.7 %2022; Company onlyRIKchecked 10.11.2026Δ: +23.7 %2022; Company onlyRIKAs of: checked 10.11.2026
Assets3,916,233 €-2.9 %2022; Company onlyRIKchecked 10.11.2026Δ: -2.9 %2022; Company onlyRIKAs of: checked 10.11.2026
Employees47+2.2 %2022; Company onlyRIKchecked 10.11.2026Δ: +2.2 %2022; Company onlyRIKAs of: checked 10.11.2026
Revenue15,710,153 €+47.7 %2021; Company onlyRIKchecked 10.11.2026Δ: +47.7 %2021; Company onlyRIKAs of: checked 10.11.2026
Net profit-300,341 €-261.6 %2021; Company onlyRIKchecked 10.11.2026Δ: -261.6 %2021; Company onlyRIKAs of: checked 10.11.2026
Equity1,044,420 €-22.3 %2021; Company onlyRIKchecked 10.11.2026Δ: -22.3 %2021; Company onlyRIKAs of: checked 10.11.2026
Assets4,032,052 €+29.5 %2021; Company onlyRIKchecked 10.11.2026Δ: +29.5 %2021; Company onlyRIKAs of: checked 10.11.2026
Employees46+15 %2021; Company onlyRIKchecked 10.11.2026Δ: +15 %2021; Company onlyRIKAs of: checked 10.11.2026
Revenue10,637,460 €-18.6 %2020; Company onlyRIKchecked 10.11.2026Δ: -18.6 %2020; Company onlyRIKAs of: checked 10.11.2026
Net profit185,905 €-16.3 %2020; Company onlyRIKchecked 10.11.2026Δ: -16.3 %2020; Company onlyRIKAs of: checked 10.11.2026
Equity1,344,761 €+16 %2020; Company onlyRIKchecked 10.11.2026Δ: +16 %2020; Company onlyRIKAs of: checked 10.11.2026
Assets3,112,785 €-13.2 %2020; Company onlyRIKchecked 10.11.2026Δ: -13.2 %2020; Company onlyRIKAs of: checked 10.11.2026
Employees400 %2020; Company onlyRIKchecked 10.11.2026Δ: 0 %2020; Company onlyRIKAs of: checked 10.11.2026
Revenue13,069,492 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Net profit222,214 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Equity1,158,856 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Assets3,585,714 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Employees40—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026

Same query via MCP

Source: Äriregister · Latest available report year: 2025 (annual reporting) · Äriregister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

How much tax did the company pay (2026 III)?

OÜ BauEst: state taxes 479,992 € (period: 2026 III; company only; source: EMTA; snapshot: 10.11.2026).

#maksudSnapshot

↔ Scroll horizontally to see all columns.

Tax figures by quarter
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Quarterly declared turnover (EMTA)8,955,246 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
State taxes479,992 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Labour taxes308,957 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Employees (EMTA quarter, legal entity)58——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Tax Board public tax data
QuarterQuarterly declared turnover (EMTA) (€)State taxes €Labour taxes €Employees (EMTA quarter, legal entity)
2026 III8,955,246479,992308,95758
2026 II9,101,520838,620297,63058
2026 I6,943,368694,221298,58855
2025 IV8,274,127396,778302,57356
2025 III7,423,401334,620296,79555
2025 II9,505,761272,790252,13653
2025 I7,742,254393,213219,92849
2024 IV4,868,953565,976210,15345
2024 III2,787,425276,194194,14443
2024 II1,565,393433,055211,29641

Showing 10 / 19

Source: EMTA · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · EMTA: Debt list observed: 09.11.2026 · daily debt list · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What state aid has the company received (snapshot 10.11.2026)?

OÜ BauEst: displayed state aid decisions and project grants 23 (source: RAR; snapshot: 10.11.2026).

#toetusedSnapshot
Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu · 02.11.2026

Amount €: 7,703

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:123225 | 2026-11-02 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:123225 · 2026-11-02

ariregister:11220064 · 2006-02-07

Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu · 14.01.2026

Amount €: 6,815

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:84956 | 2026-01-14 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:84956 · 2026-01-14

ariregister:11220064 · 2006-02-07

Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu · 28.10.2025

Amount €: 3,775

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:63100 | 2025-10-28 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:63100 · 2025-10-28

ariregister:11220064 · 2006-02-07

Eesti Töötukassa · EK grupierandi määrus 651/2014 Koolitusabi (artikkel 31) >> Koolitusabi · 12.09.2025

Amount €: 1,250

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:65912 | 2025-09-12 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:65912 · 2025-09-12

ariregister:11220064 · 2006-02-07

Eesti Töötukassa · Koolitus VTA >> Koolitus VTA · 12.09.2025

Amount €: 2,000

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:65911 | 2025-09-12 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:65911 · 2025-09-12

ariregister:11220064 · 2006-02-07

Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu · 27.02.2025

Amount €: 66,152

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:76334 | 2025-02-27 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:76334 · 2025-02-27

ariregister:11220064 · 2006-02-07

Eesti Töötukassa · Koolitus VTA >> Koolitus VTA · 25.02.2025

Amount €: 2,000

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:76468 | 2025-02-25 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:76468 · 2025-02-25

ariregister:11220064 · 2006-02-07

Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu · 18.11.2024

Amount €: 74,498

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:41637 | 2024-11-18 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:41637 · 2024-11-18

ariregister:11220064 · 2006-02-07

Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu · 03.05.2024

Amount €: 12,202

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:52032 | 2024-05-03 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:52032 · 2024-05-03

ariregister:11220064 · 2006-02-07

Riigi Tugiteenuste Keskus · Regionaalareng (VTA) >> Muu · 13.10.2023

Amount €: 7.81

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:26342 | 2023-10-13 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:26342 · 2023-10-13

ariregister:11220064 · 2006-02-07

Showing 10 / 23

Observed ship-register entries

Owner entry in the register, may not be current owner. Current ownership is unverified. Separate revisions are separate entries, not additional vessels. Type and use retain the source wording.

Download ship entries CSV
Observed ship-register entries
Register / entryVessel type (source)Use (source)Build yearGross tonnage (GT)Net tonnage (NT)Home portShip register statusOwner-entry statusSource entry start (not proof of current ownership)Source revisionOwner entry last observedEntry no longer observed sinceShip status observedOfficial dataset
1000 / 1Teisaldatav ujuvvahendUnknownUnknownUnknownUnknownMiidurannaOpenObserved / historical; current owner unverified2025-07-18T13:41:33.403Unknown2026-11-08T09:00:03+00:00Unknown2026-11-08T09:00:03+00:00Official dataset
1000 / 1Teisaldatav ujuvvahendUnknownUnknownUnknownUnknownMiidurannaOpenObserved / historical; current owner unverified2025-07-18T13:41:33.403Unknown2026-10-04T08:00:03+00:002026-10-11T08:00:03+00:002026-11-08T09:00:03+00:00Official dataset
3N14I02 / 2Teisaldatav ujuvvahendUnknownUnknown00Hiiu maakond, Hiiu vald, Lehtma külaOpenObserved / historical; current owner unverified2022-02-10T11:58:42.483Unknown2026-10-04T08:00:03+00:002026-10-11T08:00:03+00:002026-11-08T09:00:03+00:00Official dataset
3N14I02 / 2Teisaldatav ujuvvahendUnknownUnknown00Hiiu maakond, Hiiu vald, Lehtma külaOpenObserved / historical; current owner unverified2022-02-10T11:58:42.483Unknown2026-11-08T09:00:03+00:00Unknown2026-11-08T09:00:03+00:00Official dataset

Source: Centre of Registers and Information Systems, ship register · Licence: CC BY-SA 4.0 · RIK Laev.xml, CC BY-SA 4.0 · Registrite ja Infosüsteemide Keskus (RIK) · Data catalogue

Environmental records

Source presence and source status do not confirm permit validity. Emission sources and waste facilities are separate record types. Record counts are not an environmental footprint or pollution quantities. Location is unknown.

Download CSV
Current or confirmed in source (6)
Environmental records · Current or confirmed in source
Record typeNumberSource statusStart dateEnd dateLegal validityOfficial link
Environmental permitKL-523449IssuedSource valid from: 2025-03-27Source valid until: 2030-02-28UnknownOfficial link unavailable
Environmental permitKL-527403IssuedSource valid from: 2026-08-18Source valid until: 2031-08-18UnknownOfficial link unavailable
Environmental permitRE.VT/525810IssuedSource valid from: 2025-11-24Source valid until: 2027-09-14UnknownOfficial link unavailable
Environmental permitRE.VT/525835IssuedSource valid from: 2025-11-25Source valid until: 2027-09-14UnknownOfficial link unavailable
Environmental permitRE.VT/527172IssuedSource valid from: 2026-06-09Source valid until: 2026-12-31UnknownOfficial link unavailable
Environmental permitRE.VT/527408IssuedSource valid from: 2026-07-22Source valid until: 2027-09-14UnknownOfficial link unavailable
Archived or ended (3)
Environmental records · Archived or ended
Record typeNumberSource statusStart dateEnd dateLegal validityOfficial link
Waste facilityJKK3701217ArchivedActivity start: 2025-03-18Activity end: 2026-06-26UnknownOfficial link unavailable
Waste facilityJKK5700141ArchivedActivity start: 2022-03-16Activity end: 2022-05-31UnknownOfficial link unavailable
Waste facilityJKK7400137ArchivedActivity start: 2020-07-01Activity end: 2020-09-30UnknownOfficial link unavailable

Source: Keskkonnaamet, KOTKAS permits, AvTS § 3¹(9)

Source: RTK · MTR · Keskkonnaamet · RTK: Source observation date unknown · MTR: Source observation date unknown · Keskkonnaamet: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What procurement has the company won (snapshot 10.11.2026)?

OÜ BauEst: procurement wins 53 (source: Riigihangete register; snapshot: 10.11.2026).

#hankedSnapshot

Won a tender. The company has won a public tender, 53 wins.

Informational indicators, not accusations or proof of wrongdoing. Free CSV exports the loaded rows. Load more to include further results.

Aegna tulepaagi ehitustööd · 27.10.2026

Incorporated < 90 days before decision: Rule not met; ; ; 3e345e6c-788f-4f8d-b1a6-f8914aa8c362/RES-0000/11220064 | 2026-10-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314263; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; 3e345e6c-788f-4f8d-b1a6-f8914aa8c362/RES-0000/11220064 | 2026-10-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314263 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-10-27 – 2026-10-27; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 6acb3f30-e388-441d-a5aa-03b05ef6a4bd/3e345e6c-788f-4f8d-b1a6-f8914aa8c362/RES-0000/TEN-0001/11220064 | 2026-10-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314263 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

3e345e6c-788f-4f8d-b1a6-f8914aa8c362/RES-0000/11220064 · 2026-10-27

ariregister:11220064 · 2006-02-07

3e345e6c-788f-4f8d-b1a6-f8914aa8c362/RES-0000/11220064 · 2026-10-27

6acb3f30-e388-441d-a5aa-03b05ef6a4bd/3e345e6c-788f-4f8d-b1a6-f8914aa8c362/RES-0000/TEN-0001/11220064 · 2026-10-27

Mahu sadama süvendustööd · 17.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; 27e1073c-20b4-4e0e-b52b-bd09c68f5bb3/RES-0000/11220064 | 2026-07-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311499; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; 27e1073c-20b4-4e0e-b52b-bd09c68f5bb3/RES-0000/11220064 | 2026-07-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311499 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-07-17 – 2026-07-17; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; bde3ba55-5b25-4869-90cf-442e21c464b9/27e1073c-20b4-4e0e-b52b-bd09c68f5bb3/RES-0000/TEN-0001/11220064 | 2026-07-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311499 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

27e1073c-20b4-4e0e-b52b-bd09c68f5bb3/RES-0000/11220064 · 2026-07-17

ariregister:11220064 · 2006-02-07

27e1073c-20b4-4e0e-b52b-bd09c68f5bb3/RES-0000/11220064 · 2026-07-17

bde3ba55-5b25-4869-90cf-442e21c464b9/27e1073c-20b4-4e0e-b52b-bd09c68f5bb3/RES-0000/TEN-0001/11220064 · 2026-07-17

Roomassaare sadama kai nr 4 venderkaitsesüsteemi uuendamise ehitustööd · 09.06.2026

Incorporated < 90 days before decision: Rule not met; ; ; e233e998-6dc7-4f8b-8ab3-18c85d6a8720/RES-0000/11220064 | 2026-06-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308266; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; e233e998-6dc7-4f8b-8ab3-18c85d6a8720/RES-0000/11220064 | 2026-06-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308266 Repeated recorded procedures: Indicator present; Distinct procedures: 9; Retained award dates: 2024-08-05 – 2026-06-09; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 47831b23-0404-4304-b9ca-e7af03454844/77a3f2b9-1bda-4918-b51e-c3a885573988/RES-0000/TEN-0001/11220064 | 2025-08-13 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/297361; 849c3993-02ea-43f1-88fe-3392db3c96cd/f37138fc-5702-4762-8629-26938be5d871/RES-0000/TEN-0001/11220064 | 2025-04-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/291108; 8bb0fc99-bdee-4f17-b0d8-25ece12d50cc/f7a752d8-aeed-4b0b-8133-bda66e7aae2c/RES-0000/TEN-0001/11220064 | 2025-04-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290495; 9af9301f-3ac3-4a3d-98b0-9cb1038c93db/d613d894-bf66-4f1d-91a6-8b8d568c7a7b/RES-0000/TEN-0001/11220064 | 2024-11-12 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286816; a2bc633a-f512-43ff-b8ba-9f04b1e91d94/2ee4da81-306a-4b03-9e03-31f28f2da795/RES-0000/TEN-0001/11220064 | 2024-08-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281829; a93caa2b-174f-4762-abb2-a15c3177d43a/a3d842ac-542d-4e20-b9aa-eb1a14145e46/RES-0000/TEN-0001/11220064 | 2025-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298632; e15c2894-84f9-4d46-a03c-b345cfbc23e5/e233e998-6dc7-4f8b-8ab3-18c85d6a8720/RES-0000/TEN-0001/11220064 | 2026-06-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308266; e308bb21-08f0-4076-90ed-05be55cbc34a/7bd5ac0b-00ad-4ed0-bf9a-0fe1bba1e1de/RES-0000/TEN-0001/11220064 | 2025-04-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/291157; f152f721-6640-42dd-bae2-4f93b0b702ea/3547a2a4-cd9f-45f8-b3a9-6ca9273d5c85/RES-0000/TEN-0001/11220064 | 2026-06-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309803 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

e233e998-6dc7-4f8b-8ab3-18c85d6a8720/RES-0000/11220064 · 2026-06-09

ariregister:11220064 · 2006-02-07

e233e998-6dc7-4f8b-8ab3-18c85d6a8720/RES-0000/11220064 · 2026-06-09

47831b23-0404-4304-b9ca-e7af03454844/77a3f2b9-1bda-4918-b51e-c3a885573988/RES-0000/TEN-0001/11220064 · 2025-08-13

849c3993-02ea-43f1-88fe-3392db3c96cd/f37138fc-5702-4762-8629-26938be5d871/RES-0000/TEN-0001/11220064 · 2025-04-08

8bb0fc99-bdee-4f17-b0d8-25ece12d50cc/f7a752d8-aeed-4b0b-8133-bda66e7aae2c/RES-0000/TEN-0001/11220064 · 2025-04-03

9af9301f-3ac3-4a3d-98b0-9cb1038c93db/d613d894-bf66-4f1d-91a6-8b8d568c7a7b/RES-0000/TEN-0001/11220064 · 2024-11-12

a2bc633a-f512-43ff-b8ba-9f04b1e91d94/2ee4da81-306a-4b03-9e03-31f28f2da795/RES-0000/TEN-0001/11220064 · 2024-08-05

a93caa2b-174f-4762-abb2-a15c3177d43a/a3d842ac-542d-4e20-b9aa-eb1a14145e46/RES-0000/TEN-0001/11220064 · 2025-09-18

e15c2894-84f9-4d46-a03c-b345cfbc23e5/e233e998-6dc7-4f8b-8ab3-18c85d6a8720/RES-0000/TEN-0001/11220064 · 2026-06-09

e308bb21-08f0-4076-90ed-05be55cbc34a/7bd5ac0b-00ad-4ed0-bf9a-0fe1bba1e1de/RES-0000/TEN-0001/11220064 · 2025-04-30

f152f721-6640-42dd-bae2-4f93b0b702ea/3547a2a4-cd9f-45f8-b3a9-6ca9273d5c85/RES-0000/TEN-0001/11220064 · 2026-06-09

Heltermaa sadama kai nr 4 kaldarambi rekonstrueerimine · 09.06.2026

Incorporated < 90 days before decision: Rule not met; ; ; 3547a2a4-cd9f-45f8-b3a9-6ca9273d5c85/RES-0000/11220064 | 2026-06-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309803; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Indicator present; ; ; 3547a2a4-cd9f-45f8-b3a9-6ca9273d5c85/RES-0000/11220064 | 2026-06-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309803 Repeated recorded procedures: Indicator present; Distinct procedures: 9; Retained award dates: 2024-08-05 – 2026-06-09; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 47831b23-0404-4304-b9ca-e7af03454844/77a3f2b9-1bda-4918-b51e-c3a885573988/RES-0000/TEN-0001/11220064 | 2025-08-13 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/297361; 849c3993-02ea-43f1-88fe-3392db3c96cd/f37138fc-5702-4762-8629-26938be5d871/RES-0000/TEN-0001/11220064 | 2025-04-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/291108; 8bb0fc99-bdee-4f17-b0d8-25ece12d50cc/f7a752d8-aeed-4b0b-8133-bda66e7aae2c/RES-0000/TEN-0001/11220064 | 2025-04-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290495; 9af9301f-3ac3-4a3d-98b0-9cb1038c93db/d613d894-bf66-4f1d-91a6-8b8d568c7a7b/RES-0000/TEN-0001/11220064 | 2024-11-12 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286816; a2bc633a-f512-43ff-b8ba-9f04b1e91d94/2ee4da81-306a-4b03-9e03-31f28f2da795/RES-0000/TEN-0001/11220064 | 2024-08-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281829; a93caa2b-174f-4762-abb2-a15c3177d43a/a3d842ac-542d-4e20-b9aa-eb1a14145e46/RES-0000/TEN-0001/11220064 | 2025-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298632; e15c2894-84f9-4d46-a03c-b345cfbc23e5/e233e998-6dc7-4f8b-8ab3-18c85d6a8720/RES-0000/TEN-0001/11220064 | 2026-06-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308266; e308bb21-08f0-4076-90ed-05be55cbc34a/7bd5ac0b-00ad-4ed0-bf9a-0fe1bba1e1de/RES-0000/TEN-0001/11220064 | 2025-04-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/291157; f152f721-6640-42dd-bae2-4f93b0b702ea/3547a2a4-cd9f-45f8-b3a9-6ca9273d5c85/RES-0000/TEN-0001/11220064 | 2026-06-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309803 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

3547a2a4-cd9f-45f8-b3a9-6ca9273d5c85/RES-0000/11220064 · 2026-06-09

ariregister:11220064 · 2006-02-07

3547a2a4-cd9f-45f8-b3a9-6ca9273d5c85/RES-0000/11220064 · 2026-06-09

47831b23-0404-4304-b9ca-e7af03454844/77a3f2b9-1bda-4918-b51e-c3a885573988/RES-0000/TEN-0001/11220064 · 2025-08-13

849c3993-02ea-43f1-88fe-3392db3c96cd/f37138fc-5702-4762-8629-26938be5d871/RES-0000/TEN-0001/11220064 · 2025-04-08

8bb0fc99-bdee-4f17-b0d8-25ece12d50cc/f7a752d8-aeed-4b0b-8133-bda66e7aae2c/RES-0000/TEN-0001/11220064 · 2025-04-03

9af9301f-3ac3-4a3d-98b0-9cb1038c93db/d613d894-bf66-4f1d-91a6-8b8d568c7a7b/RES-0000/TEN-0001/11220064 · 2024-11-12

a2bc633a-f512-43ff-b8ba-9f04b1e91d94/2ee4da81-306a-4b03-9e03-31f28f2da795/RES-0000/TEN-0001/11220064 · 2024-08-05

a93caa2b-174f-4762-abb2-a15c3177d43a/a3d842ac-542d-4e20-b9aa-eb1a14145e46/RES-0000/TEN-0001/11220064 · 2025-09-18

e15c2894-84f9-4d46-a03c-b345cfbc23e5/e233e998-6dc7-4f8b-8ab3-18c85d6a8720/RES-0000/TEN-0001/11220064 · 2026-06-09

e308bb21-08f0-4076-90ed-05be55cbc34a/7bd5ac0b-00ad-4ed0-bf9a-0fe1bba1e1de/RES-0000/TEN-0001/11220064 · 2025-04-30

f152f721-6640-42dd-bae2-4f93b0b702ea/3547a2a4-cd9f-45f8-b3a9-6ca9273d5c85/RES-0000/TEN-0001/11220064 · 2026-06-09

Viimsi erihoolekande hoone rekonstrueerimine · 05.06.2026

Incorporated < 90 days before decision: Rule not met; ; ; 847bd8f4-9250-4671-b379-0e4d8599b1fb/RES-0000/11220064 | 2026-06-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309088; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; 847bd8f4-9250-4671-b379-0e4d8599b1fb/RES-0000/11220064 | 2026-06-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309088 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-06-05 – 2026-06-05; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 664cff9b-a3db-467a-a338-1c141e524eaa/847bd8f4-9250-4671-b379-0e4d8599b1fb/RES-0000/TEN-0001/11220064 | 2026-06-05 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309088 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

847bd8f4-9250-4671-b379-0e4d8599b1fb/RES-0000/11220064 · 2026-06-05

ariregister:11220064 · 2006-02-07

847bd8f4-9250-4671-b379-0e4d8599b1fb/RES-0000/11220064 · 2026-06-05

664cff9b-a3db-467a-a338-1c141e524eaa/847bd8f4-9250-4671-b379-0e4d8599b1fb/RES-0000/TEN-0001/11220064 · 2026-06-05

Raudoja-Aavoja kanali hooldusremont · 25.05.2026

Incorporated < 90 days before decision: Rule not met; ; ; 1e487d3f-5f9e-4ed6-adc0-1e6dbb6563c4/RES-0000/11220064 | 2026-05-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308978; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; 1e487d3f-5f9e-4ed6-adc0-1e6dbb6563c4/RES-0000/11220064 | 2026-05-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308978 Repeated recorded procedures: Indicator present; Distinct procedures: 3; Retained award dates: 2024-05-27 – 2026-05-25; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 579f08fe-40ab-4792-bc98-f7aef01337f0/f32ba011-893e-4f8a-872e-884c3ddf8ab8/RES-0000/TEN-0001/11220064 | 2026-02-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301905; 58417eef-33bd-45a4-b7aa-f6118cd1d52d/db59f8c4-d374-413a-8cda-9a440002d4a9/RES-0000/TEN-0001/11220064 | 2024-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274573; 72bfd733-3f7b-4e2e-8912-07a945e9e5da/1e487d3f-5f9e-4ed6-adc0-1e6dbb6563c4/RES-0000/TEN-0001/11220064 | 2026-05-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308978 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

1e487d3f-5f9e-4ed6-adc0-1e6dbb6563c4/RES-0000/11220064 · 2026-05-25

ariregister:11220064 · 2006-02-07

1e487d3f-5f9e-4ed6-adc0-1e6dbb6563c4/RES-0000/11220064 · 2026-05-25

579f08fe-40ab-4792-bc98-f7aef01337f0/f32ba011-893e-4f8a-872e-884c3ddf8ab8/RES-0000/TEN-0001/11220064 · 2026-02-25

58417eef-33bd-45a4-b7aa-f6118cd1d52d/db59f8c4-d374-413a-8cda-9a440002d4a9/RES-0000/TEN-0001/11220064 · 2024-05-27

72bfd733-3f7b-4e2e-8912-07a945e9e5da/1e487d3f-5f9e-4ed6-adc0-1e6dbb6563c4/RES-0000/TEN-0001/11220064 · 2026-05-25

Elektrilevi Haapsalu piirkonnakeskuse projekteerimise - ja ehitustööd · 27.04.2026

Incorporated < 90 days before decision: Rule not met; ; ; cdc1a035-aee1-4678-89ad-1fb24400c431/RES-0000/11220064 | 2026-04-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300813; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; cdc1a035-aee1-4678-89ad-1fb24400c431/RES-0000/11220064 | 2026-04-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300813 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-04-27 – 2026-04-27; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 93ea92c6-1e82-4675-86e4-dfe2e20c2605/cdc1a035-aee1-4678-89ad-1fb24400c431/RES-0000/TEN-0001/11220064 | 2026-04-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300813 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

cdc1a035-aee1-4678-89ad-1fb24400c431/RES-0000/11220064 · 2026-04-27

ariregister:11220064 · 2006-02-07

cdc1a035-aee1-4678-89ad-1fb24400c431/RES-0000/11220064 · 2026-04-27

93ea92c6-1e82-4675-86e4-dfe2e20c2605/cdc1a035-aee1-4678-89ad-1fb24400c431/RES-0000/TEN-0001/11220064 · 2026-04-27

Nõva sadama rekonstrueerimistööde III etapp · 20.04.2026

Incorporated < 90 days before decision: Rule not met; ; ; 0ec39c0a-3d5a-469e-be5a-41a7fd2dce93/RES-0000/11220064 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305366; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; 0ec39c0a-3d5a-469e-be5a-41a7fd2dce93/RES-0000/11220064 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305366 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-04-20 – 2026-04-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 83c65e10-7f8b-4592-acf2-d0c908ce39cd/0ec39c0a-3d5a-469e-be5a-41a7fd2dce93/RES-0000/TEN-0001/11220064 | 2026-04-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305366 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

0ec39c0a-3d5a-469e-be5a-41a7fd2dce93/RES-0000/11220064 · 2026-04-20

ariregister:11220064 · 2006-02-07

0ec39c0a-3d5a-469e-be5a-41a7fd2dce93/RES-0000/11220064 · 2026-04-20

83c65e10-7f8b-4592-acf2-d0c908ce39cd/0ec39c0a-3d5a-469e-be5a-41a7fd2dce93/RES-0000/TEN-0001/11220064 · 2026-04-20

Nõo Põhikooli laienduse I etapi ehitustööd · 18.04.2026

Incorporated < 90 days before decision: Rule not met; ; ; cfdc6091-6f1b-4446-abdd-a68067ca105f/RES-0000/11220064 | 2026-04-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305425; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; cfdc6091-6f1b-4446-abdd-a68067ca105f/RES-0000/11220064 | 2026-04-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305425 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-04-18 – 2026-04-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 959616a8-a4de-4c30-a698-fb60213a6352/cfdc6091-6f1b-4446-abdd-a68067ca105f/RES-0000/TEN-0001/11220064 | 2026-04-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305425 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

cfdc6091-6f1b-4446-abdd-a68067ca105f/RES-0000/11220064 · 2026-04-18

ariregister:11220064 · 2006-02-07

cfdc6091-6f1b-4446-abdd-a68067ca105f/RES-0000/11220064 · 2026-04-18

959616a8-a4de-4c30-a698-fb60213a6352/cfdc6091-6f1b-4446-abdd-a68067ca105f/RES-0000/TEN-0001/11220064 · 2026-04-18

Lasnamäe vihmavete merrelasu kaitsepaneelide korrastamine · 25.02.2026

Incorporated < 90 days before decision: Rule not met; ; ; f32ba011-893e-4f8a-872e-884c3ddf8ab8/RES-0000/11220064 | 2026-02-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301905; ariregister:11220064 | 2006-02-07 | https://ariregister.rik.ee/est/company/11220064 One tender reported: Rule not met; ; ; f32ba011-893e-4f8a-872e-884c3ddf8ab8/RES-0000/11220064 | 2026-02-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301905 Repeated recorded procedures: Indicator present; Distinct procedures: 3; Retained award dates: 2024-05-27 – 2026-05-25; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 579f08fe-40ab-4792-bc98-f7aef01337f0/f32ba011-893e-4f8a-872e-884c3ddf8ab8/RES-0000/TEN-0001/11220064 | 2026-02-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301905; 58417eef-33bd-45a4-b7aa-f6118cd1d52d/db59f8c4-d374-413a-8cda-9a440002d4a9/RES-0000/TEN-0001/11220064 | 2024-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274573; 72bfd733-3f7b-4e2e-8912-07a945e9e5da/1e487d3f-5f9e-4ed6-adc0-1e6dbb6563c4/RES-0000/TEN-0001/11220064 | 2026-05-25 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/308978 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

f32ba011-893e-4f8a-872e-884c3ddf8ab8/RES-0000/11220064 · 2026-02-25

ariregister:11220064 · 2006-02-07

f32ba011-893e-4f8a-872e-884c3ddf8ab8/RES-0000/11220064 · 2026-02-25

579f08fe-40ab-4792-bc98-f7aef01337f0/f32ba011-893e-4f8a-872e-884c3ddf8ab8/RES-0000/TEN-0001/11220064 · 2026-02-25

58417eef-33bd-45a4-b7aa-f6118cd1d52d/db59f8c4-d374-413a-8cda-9a440002d4a9/RES-0000/TEN-0001/11220064 · 2024-05-27

72bfd733-3f7b-4e2e-8912-07a945e9e5da/1e487d3f-5f9e-4ed6-adc0-1e6dbb6563c4/RES-0000/TEN-0001/11220064 · 2026-05-25

Showing 10 · View market winners

Source: Riigihangete register · Riigihangete register: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What changed in the company history (snapshot 10.11.2026)?

OÜ BauEst: the timeline shows historical events, not an assessment of current status (source: Äriregister, EMTA, Ametlikud Teadaanded, RAR; snapshot: 10.11.2026).

#ajajoonSnapshot

2026

Reports, taxes and grants (4)
  • State aid decision: Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu, €7.7k
    aidsource ↗
  • Tax Board 2026 III: turnover €8.96m, employees: 58
    taxes
  • Tax Board 2026 II: turnover €9.1m, employees: 58
    taxes
  • Tax Board 2026 I: turnover €6.94m, employees: 55
    taxes

2013

  • Share capital changed: €9,587 → €9,588
    register

2011

  • Share capital changed: 150000.0 EEK → €9,587
    register

2006

  • Entered in the business register
    register
  • Share capital changed: missing → 150000.0 EEK
    register
  • Name changed: missing → OÜ BauEst
    register
  • Status changed: missing → in the register
    register

Showing 10 / 48

Events: 48 · newest first · Sources: Business Register, Tax Board, RTK, Official Notices

Which sources supply the data (snapshot 10.11.2026)?

OÜ BauEst: displayed source records 9 (source: Äriregister, EMTA, RTK, MTR, Keskkonnaamet, Ametlikud Teadaanded, Riigi kinnisvararegister, Riigihangete register, RIK laevakinnistusraamat; snapshot: 10.11.2026).

#allikadSnapshot
View Markdown

↔ Scroll horizontally to see all columns.

Block, source, licence, period, vintage and official link
BlockSourceLicenceExpected cadenceSource observationSnapshotCheckedOfficial record
Business RegisterÄriregisterCC BY 4.0nightlySource observation date unknown10.11.2026 19:4410.11.2026open ↗
TaxesEMTACC BY-SA 3.0quarterly tax figures / daily debt listDebt list observed: 09.11.2026 · daily debt list10.11.2026 19:4410.11.2026open ↗
GrantsRTKCC BY-SA 3.0 (Euroopa Liidu struktuuritoetus). RAR: AvTS § 3¹ lg 9.missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
LicencesMTRCC BY-SA 3.0missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
LicencesKeskkonnaametAvTS § 3¹ lg 9missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
AnnouncementsAmetlikud TeadaandedCC BY-SA 4.0nightlyLatest retained notice published: 09.11.2026 · Source observation date unknown10.11.2026 19:4410.11.2026open ↗
State propertyRiigi kinnisvararegisterCC0 1.0missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
Public procurementRiigihangete registerCC BY-SA 3.0nightlySource observation date unknown10.11.2026 19:4410.11.2026open ↗
missingRIK laevakinnistusraamatCC BY-SA 4.0missingSource observation date unknownmissingmissingopen ↗
Court decisions, trademarks, sanctionssource missing — a company-level link has not been published yet; this does not mean there are no records
Dates and their basis

Source observation is the source’s own as-of date; the latest notice publication does not prove observation. Snapshot is the data extract publication time. Checked is the source availability check. Missing clocks are not inferred from other dates.

Shortcuts

Quick search/ Ctrl+K
Home · Sectors · Regionsg h · g s · g r
Grants · Procurement · Compare · Watchlistg t · g k · g v · g j
In a table: move · open · compare · watchjk · ↵ · c · w
On a company page: sections1–9
←→↑↓ · Home · End

Use arrow keys to explore data points. Home and End move to the first and last point.

Close / backesc