K-Projekt Aktsiaselts

In the registerRegistry code: 12203754

K-Projekt Aktsiaselts: 2025 revenue 4,372,054 €, net profit 279,827 € (Company only). 47 employees, 2025 annual average (Company only). Äriregister. Snapshot: 10.11.2026.

  • Current tax-debt statusNot listedEMTA. Observation: 09.11.2026Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.
  • Report 2025FiledÄriregisterCompany only
  • NoticesNo warning noticesAmetlikud Teadaanded. Observation: 09.11.2026
  • Revenue 20254,372,054 €ÄriregisterCompany only
  • Employees 202547Äriregisterannual average; Company only

Place in the peer group

EMTAK 71121, Harju County, 2025

Revenue 2025, company only, n = 949 filed reports

0100p25p50 (median)p7512,072 €38,380 €113,342 €K-Projekt Aktsiaselts4,372,054 €, p1000100p25medianp7512,072 €38,380 €113,342 €K-Projekt Aktsiaselts4,372,054 €, p100

marker = company, band = p25–p75, axis = percentile 0–100

The company against its peer group by metric, 2025 · Company only
MetricCompanyMedianPer­cen­tile
Revenue4,372,054 €38,380 €p100 (n = 949)
Net profit279,827 €2,142 €p98 (n = 1,215)
Equity1,123,426 €26,731 €p98 (n = 1,217)
Employees470p100 (n = 1,215)

Each percentile is computed separately, so n differs; hidden below 5 companies; medians and quartiles in whole euros (rounded). Source: Business Register (annual reports), snapshot 10.11.2026.

Not an official extract; no credit rating is provided.

Register details and contacts
Registered name
K-Projekt Aktsiaselts
Registry code
12203754
Status
in the register (R)
Legal form
Public limited company
Registered
09.12.2011
Share capital
37,080 €
VAT number
EE101501806
Address
Harju County · Tallinn, Kesklinna linnaosa, Ahtri tn 6a

Source: Business Register (open data), CC BY 4.0

Former names / legal succession
  • Division: related company · 09.12.2011: 10329480

Business Register (open data)

Names of current board members load in the interactive view.

K-Projekt Aktsiaselts is a public limited company. In 2025, revenue grew 14.9 % to 4,372,054 €, profit fell 41.2 %. The main activity is NACE class: Engineering activities and related technical consultancy (71121). The company is located in Harju County. Registered 09.12.2011. Share capital is 37,080 €. 2025 annual-report figures (Company only): profit 279,827 €, annual average employees 47. Taxes for III quarter of 2026 were 363,739 €. Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026. There are 9 state aid and grant records. There are 13 activity-licence records (including history). There are 66 single-winner procurement wins (2023–2026); recorded contract/framework ceiling value 5,719,065 €, not actual payments. Shared-award ceilings are recorded separately and are not added to this company total.

What are the company indicators (2025)?

K-Projekt Aktsiaselts: revenue 4,372,054 € (period: 2025; company only; source: Äriregister; snapshot: 10.11.2026).

#naitajadSnapshot

Annual-report figures: Company only Tax data refers to this legal entity.

Peer group: 71121 · Harju County · 2025 · n = 949

↔ Scroll horizontally to see all columns.

Key figures
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
RevenueRevenue: 2019 to 2025, min 2019 · 2,472,095 €, max 2025 · 4,372,054 €, latest 2025 · 4,372,054 €2019 – 20254,372,054 €+14.9 %p100 (n = 949)2025; Company onlyRIKchecked 10.11.2026Δ: +14.9 %Position: p100 (n = 949)2025; Company onlyRIKAs of: checked 10.11.2026
Net profitNet profit: 2019 to 2025, min 2019 · -551,222 €, max 2024 · 475,591 €, latest 2025 · 279,827 €2019 – 2025279,827 €-41.2 %p98 (n = 1215)2025 · margin 6.4 % (previous year 12.5 %); Company onlyRIKchecked 10.11.2026Δ: -41.2 %Position: p98 (n = 1215)2025 · margin 6.4 % (previous year 12.5 %); Company onlyRIKAs of: checked 10.11.2026
EquityEquity: 2019 to 2025, min 2019 · 383,689 €, max 2025 · 1,123,426 €, latest 2025 · 1,123,426 €2019 – 20251,123,426 €—p98 (n = 1217)2025 · share of assets 64.9 % (previous year 65.9 %); Company onlyRIKchecked 10.11.2026Position: p98 (n = 1217)2025 · share of assets 64.9 % (previous year 65.9 %); Company onlyRIKAs of: checked 10.11.2026
EmployeesEmployees: 2019 to 2025, min 2024 · 46, max 2019 · 50, latest 2025 · 472019 – 202547—p100 (n = 1215)2025; Company onlyRIKchecked 10.11.2026Position: p100 (n = 1215)2025; Company onlyRIKAs of: checked 10.11.2026
Turnover per the Tax BoardTurnover per the Tax Board: 2022 I to 2026 III, min 2022 III · 502,085 €, max 2025 I · 1,293,048 €, latest 2026 III · 877,375 €2022 I – 2026 III1,040,313 €——2025 IV · VAT registered; Company onlyMTAchecked 10.11.20262025 IV · VAT registered; Company onlyMTAAs of: checked 10.11.2026
State taxesState taxes: 2022 I to 2026 III, min 2022 IV · 271,194 €, max 2025 I · 469,905 €, latest 2026 III · 363,739 €2022 I – 2026 III412,333 €——2025 IV; Company onlyMTAchecked 10.11.20262025 IV; Company onlyMTAAs of: checked 10.11.2026
Labour taxesLabour taxes: 2022 I to 2026 III, min 2022 I · 175,010 €, max 2026 I · 263,675 €, latest 2026 III · 261,642 €2022 I – 2026 III256,005 €——2025 IV; Company onlyMTAchecked 10.11.20262025 IV; Company onlyMTAAs of: checked 10.11.2026
State aid and grants630,199.35 €——8 decisions and 1 projectsRAR, RTKsnapshot 10.11.20268 decisions and 1 projectsRAR, RTKAs of: snapshot 10.11.2026
Report 2025filed———RIKchecked 10.11.2026RIKAs of: checked 10.11.2026

EMTA: state taxes are paid taxes net of refunds; labour taxes are paid income and social tax plus pension and unemployment insurance contributions.

The percentile (p) is the company rank among peers in the same activity and county in the same year. It is hidden when fewer than 5 companies qualify. Each figure shows its period and source.

Which legal entities are related to the company (snapshot 10.11.2026)?

K-Projekt Aktsiaselts: ownership links are between legal entities only; shared-board links show companies, not people (source: Äriregister; snapshot: 10.11.2026).

#seosedSnapshot

Dated register facts. No signals does not confirm the absence of liabilities.

Owners and holdings

Shareholders are recorded in the securities register (Nasdaq CSD), not in the Business Register open data — owners are unknown here.

No holdings in other legal entities.

Business Register shareholders

State property contracts

Fees exclude VAT; currency is unknown. Each fee has its own period. Never sum or annualise fees. Types and statuses are source assertions; this is not a general property ownership register.

Rows on this page / total records: 1 / 1

Download this page as CSV

Ended (1)

State property contracts · Ended
Contract codeContract type (source)Subtype (source)Company’s roleSource statusValid from (source)Valid until (source)Concluded on (source)Ended on (source)Source feeVAT applies (source)
LL26-151Grant use · KASUTANDlihtsustatud kokkulepeReceiving partyEnded2026-01-222026-01-312026-01-222026-02-020, currency unknown, period unknown, excluding VATNo (source assertion)

Source: Riigi kinnisvararegister · CC0 1.0

Companies sharing a board member

RIK

Same query via MCP

Source: Äriregister · Riigi kinnisvararegister · Äriregister: Source observation date unknown · Riigi kinnisvararegister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What are the company signals (snapshot 10.11.2026)?

we count and cite; we do not grade

K-Projekt Aktsiaselts: Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026.

#signaalidSnapshot

↔ Scroll horizontally to see all columns.

Public signals
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Current tax-debt statusNot on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.Check directly: EMTA ———EMTA09.11.2026EMTAAs of: 09.11.2026
Debt episode (history)missing——off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTA09.11.2026off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTAAs of: 09.11.2026
Annual reportsReport 2025 filed———RIKchecked 10.11.2026RIKAs of: checked 10.11.2026
Official noticesNo bankruptcy, liquidation, restructuring or enforcement notices——5 yearsAmetlikud Teadaandedchecked 10.11.20265 yearsAmetlikud TeadaandedAs of: checked 10.11.2026
StatusStatus changes: 1——status history: 6 entriesRIKchecked 10.11.2026status history: 6 entriesRIKAs of: checked 10.11.2026
Composite signal (derived)Lowview——Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt—Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt
Commercial pledgeNo commercial pledge——pledgee names withheldRIKchecked 10.11.2026pledgee names withheldRIKAs of: checked 10.11.2026
Court decisions · sanctions · trademarkssource missing——a company-level link has not been published yet——a company-level link has not been published yet
Composite signal components (derived, not an official score)

Score (derived) 0/100 derived

A composite signal from structured data, not an official assessment or credit rating. It describes data known at calculation time; no forecast horizon is specified.

Calculated 10.11.2026 10:15.

Methodology version: 1.3.

Stored component contributions

  1. Tax debt · 0 points
  2. Financial health · 0 points
  3. Board changes · 0 points
  4. Insolvency notices · 0 points
  5. Licence loss · 0 points

A stored 0 proves neither absence of events nor complete source coverage. Without detail, its cause is unknown.

The underlying record reference is unavailable. No specific event or document can be identified.

methodology

Calculated 10.11.2026 10:15. The score is not a credit rating and not a default forecast. methodology · The score is not a credit rating

Snapshot: Äriregister: 10.11.2026 19:44 · EMTA: 10.11.2026 19:44 · Ametlikud Teadaanded: 10.11.2026 19:44
Source: Äriregister · EMTA · Ametlikud TeadaandedLatest available report year: 2025 (annual reporting) · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · Score calculated: 10.11.2026 · Calculation and snapshot publication do not establish source freshness · Äriregister: Source observation date unknown · EMTA: Debt list observed: 09.11.2026 · daily debt list · Ametlikud Teadaanded: Latest retained notice published: 09.11.2026 · Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026View company sourcesAll sources and licences

What are the company financial results (2025)?

K-Projekt Aktsiaselts: net profit 279,827 € (period: 2025; company only; source: Äriregister; snapshot: 10.11.2026).

#finantsSnapshot

2025 · Company only: revenue 4,372,054 €, net profit 279,827 €.

Annual reports 2019–2025

↔ Scroll horizontally to see all columns.

Financials
MetricValueΔPeriod and basisSourceAs ofComparison and sources
Revenue4,372,054 €+14.9 %2025; Company onlyRIKchecked 10.11.2026Δ: +14.9 %2025; Company onlyRIKAs of: checked 10.11.2026
Net profit279,827 €-41.2 %2025; Company onlyRIKchecked 10.11.2026Δ: -41.2 %2025; Company onlyRIKAs of: checked 10.11.2026
Equity1,123,426 €+8.1 %2025; Company onlyRIKchecked 10.11.2026Δ: +8.1 %2025; Company onlyRIKAs of: checked 10.11.2026
Assets1,731,679 €+9.9 %2025; Company onlyRIKchecked 10.11.2026Δ: +9.9 %2025; Company onlyRIKAs of: checked 10.11.2026
Employees47+2.2 %2025; Company onlyRIKchecked 10.11.2026Δ: +2.2 %2025; Company onlyRIKAs of: checked 10.11.2026
Revenue3,806,652 €+16.2 %2024; Company onlyRIKchecked 10.11.2026Δ: +16.2 %2024; Company onlyRIKAs of: checked 10.11.2026
Net profit475,591 €+250.5 %2024; Company onlyRIKchecked 10.11.2026Δ: +250.5 %2024; Company onlyRIKAs of: checked 10.11.2026
Equity1,038,839 €+36.5 %2024; Company onlyRIKchecked 10.11.2026Δ: +36.5 %2024; Company onlyRIKAs of: checked 10.11.2026
Assets1,575,287 €+30.8 %2024; Company onlyRIKchecked 10.11.2026Δ: +30.8 %2024; Company onlyRIKAs of: checked 10.11.2026
Employees46-8 %2024; Company onlyRIKchecked 10.11.2026Δ: -8 %2024; Company onlyRIKAs of: checked 10.11.2026
Revenue3,277,103 €+10.2 %2023; Company onlyRIKchecked 10.11.2026Δ: +10.2 %2023; Company onlyRIKAs of: checked 10.11.2026
Net profit135,696 €+164.1 %2023; Company onlyRIKchecked 10.11.2026Δ: +164.1 %2023; Company onlyRIKAs of: checked 10.11.2026
Equity761,077 €+21.7 %2023; Company onlyRIKchecked 10.11.2026Δ: +21.7 %2023; Company onlyRIKAs of: checked 10.11.2026
Assets1,204,233 €+8.8 %2023; Company onlyRIKchecked 10.11.2026Δ: +8.8 %2023; Company onlyRIKAs of: checked 10.11.2026
Employees500 %2023; Company onlyRIKchecked 10.11.2026Δ: 0 %2023; Company onlyRIKAs of: checked 10.11.2026
Revenue2,974,607 €+1.9 %2022; Company onlyRIKchecked 10.11.2026Δ: +1.9 %2022; Company onlyRIKAs of: checked 10.11.2026
Net profit51,381 €-80.6 %2022; Company onlyRIKchecked 10.11.2026Δ: -80.6 %2022; Company onlyRIKAs of: checked 10.11.2026
Equity625,381 €-7.3 %2022; Company onlyRIKchecked 10.11.2026Δ: -7.3 %2022; Company onlyRIKAs of: checked 10.11.2026
Assets1,106,553 €+4 %2022; Company onlyRIKchecked 10.11.2026Δ: +4 %2022; Company onlyRIKAs of: checked 10.11.2026
Employees50+6.4 %2022; Company onlyRIKchecked 10.11.2026Δ: +6.4 %2022; Company onlyRIKAs of: checked 10.11.2026
Revenue2,917,960 €+16.9 %2021; Company onlyRIKchecked 10.11.2026Δ: +16.9 %2021; Company onlyRIKAs of: checked 10.11.2026
Net profit264,484 €—2021; Company onlyRIKchecked 10.11.20262021; Company onlyRIKAs of: checked 10.11.2026
Equity674,717 €+64.5 %2021; Company onlyRIKchecked 10.11.2026Δ: +64.5 %2021; Company onlyRIKAs of: checked 10.11.2026
Assets1,063,926 €+59.5 %2021; Company onlyRIKchecked 10.11.2026Δ: +59.5 %2021; Company onlyRIKAs of: checked 10.11.2026
Employees47-4.1 %2021; Company onlyRIKchecked 10.11.2026Δ: -4.1 %2021; Company onlyRIKAs of: checked 10.11.2026
Revenue2,497,054 €+1 %2020; Company onlyRIKchecked 10.11.2026Δ: +1 %2020; Company onlyRIKAs of: checked 10.11.2026
Net profit26,544 €+104.8 %2020; Company onlyRIKchecked 10.11.2026Δ: +104.8 %2020; Company onlyRIKAs of: checked 10.11.2026
Equity410,233 €+6.9 %2020; Company onlyRIKchecked 10.11.2026Δ: +6.9 %2020; Company onlyRIKAs of: checked 10.11.2026
Assets666,882 €-13.7 %2020; Company onlyRIKchecked 10.11.2026Δ: -13.7 %2020; Company onlyRIKAs of: checked 10.11.2026
Employees49-2 %2020; Company onlyRIKchecked 10.11.2026Δ: -2 %2020; Company onlyRIKAs of: checked 10.11.2026
Revenue2,472,095 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Net profit-551,222 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Equity383,689 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Assets772,982 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Employees50—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026

Same query via MCP

Source: Äriregister · Latest available report year: 2025 (annual reporting) · Äriregister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

How much tax did the company pay (2026 III)?

K-Projekt Aktsiaselts: state taxes 363,739 € (period: 2026 III; company only; source: EMTA; snapshot: 10.11.2026).

#maksudSnapshot

↔ Scroll horizontally to see all columns.

Tax figures by quarter
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Quarterly declared turnover (EMTA)877,375 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
State taxes363,739 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Labour taxes261,642 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Employees (EMTA quarter, legal entity)55——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Tax Board public tax data
QuarterQuarterly declared turnover (EMTA) (€)State taxes €Labour taxes €Employees (EMTA quarter, legal entity)
2026 III877,375363,739261,64255
2026 II1,143,625413,926243,85253
2026 I958,832395,200263,67549
2025 IV1,040,313412,333256,00552
2025 III903,353402,859254,52952
2025 II1,005,426348,964238,11252
2025 I1,293,048469,905243,43148
2024 IV1,043,231376,393227,56050
2024 III879,503323,220229,97850
2024 II916,517313,450212,16649

Showing 10 / 19

Source: EMTA · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · EMTA: Debt list observed: 09.11.2026 · daily debt list · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What state aid has the company received (snapshot 10.11.2026)?

K-Projekt Aktsiaselts: displayed state aid decisions and project grants 9 (source: RAR, RTK; snapshot: 10.11.2026).

#toetusedSnapshot
Ettevõtluse ja Innovatsiooni Sihtasutus · T&A VTA >> T&A VTA · 28.09.2026

Amount €: 7,929.34

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:118119 | 2026-09-28 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:118119 · 2026-09-28

ariregister:12203754 · 2011-12-09

Ettevõtluse ja Innovatsiooni Sihtasutus · T&A VTA >> T&A VTA · 21.03.2026

Amount €: 7,438.52

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:82103 | 2026-03-21 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:82103 · 2026-03-21

ariregister:12203754 · 2011-12-09

Ettevõtluse ja Innovatsiooni Sihtasutus · T&A VTA >> T&A VTA · 03.10.2025

Amount €: 6,539.49

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:64250 | 2025-10-03 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:64250 · 2025-10-03

ariregister:12203754 · 2011-12-09

Ettevõtluse ja Innovatsiooni Sihtasutus · Koolitus VTA >> Koolitus VTA · 08.11.2023

Amount €: 9,292

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:24704 | 2023-11-08 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:24704 · 2023-11-08

ariregister:12203754 · 2011-12-09

Ettevõtluse ja Innovatsiooni Sihtasutus · EK grupierandi määrus 651/2014 VKEdele antav abi (artiklid 17 -20) >> VKEdele nõustamiseks antav abi (artikkel 18) · 10.03.2023

Amount €: 30,000

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:36469 | 2023-03-10 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:36469 · 2023-03-10

ariregister:12203754 · 2011-12-09

Ettevõtluse ja Innovatsiooni Sihtasutus · EK grupierandi määrus 651/2014 Teadus- ja arendustegevuseks ning innovatsiooniks antav abi (artiklid 25-30) >> Protsessi- ja organisatsiooniinnovatsiooniks antav abi (artikkel 29) · 10.03.2023

Amount €: 213,500

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:36468 | 2023-03-10 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:36468 · 2023-03-10

ariregister:12203754 · 2011-12-09

Ettevõtluse ja Innovatsiooni Sihtasutus · EK grupierandi määrus 651/2014 Koolitusabi (artikkel 31) >> Koolitusabi · 10.03.2023

Amount €: 8,400

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:36467 | 2023-03-10 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:36467 · 2023-03-10

ariregister:12203754 · 2011-12-09

Ettevõtluse ja Innovatsiooni Sihtasutus · Muu >> Muu · 10.03.2023

Amount €: 47,600

Incorporated < 90 days before decision: Rule not met; ; ; state_aid:36466 | 2023-03-10 | https://rar.fin.ee/rar/providedAidsByRecipientAndMeasureReviewPage.action; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

state_aid:36466 · 2023-03-10

ariregister:12203754 · 2011-12-09

K-Projekti digipööre · 01.04.2023

Amount €: 299,500

Unknown Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

Observed ship-register entries

Owner entry in the register, may not be current owner. Current ownership is unverified. Separate revisions are separate entries, not additional vessels. Type and use retain the source wording.

No observed entries for open ships in this snapshot.

Source: Centre of Registers and Information Systems, ship register · Licence: CC BY-SA 4.0 · RIK Laev.xml, CC BY-SA 4.0 · Registrite ja Infosüsteemide Keskus (RIK) · Data catalogue

Environmental records

Source presence and source status do not confirm permit validity. Emission sources and waste facilities are separate record types. Record counts are not an environmental footprint or pollution quantities. Location is unknown.

No environmental records in this snapshot.

Source: Keskkonnaamet, KOTKAS permits, AvTS § 3¹(9)

Source: RTK · MTR · Keskkonnaamet · RTK: Source observation date unknown · MTR: Source observation date unknown · Keskkonnaamet: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What procurement has the company won (snapshot 10.11.2026)?

K-Projekt Aktsiaselts: procurement wins 66 (source: Riigihangete register; snapshot: 10.11.2026).

#hankedSnapshot

Won a tender. The company has won a public tender, 66 wins.

Informational indicators, not accusations or proof of wrongdoing. Free CSV exports the loaded rows. Load more to include further results.

Lasteaedade ja koolide ümbruste korrastamise projekteerimine · 03.11.2026

Incorporated < 90 days before decision: Rule not met; ; ; 73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/12203754 | 2026-11-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313257; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Rule not met; ; ; 73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/12203754 | 2026-11-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313257 Repeated recorded procedures: Indicator present; Distinct procedures: 16; Retained award dates: 2023-08-04 – 2026-11-03; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 17534391-7037-4c30-a891-dedff779f8f0/1ad38d97-8902-4362-8a8e-84a35fed0200/RES-0000/TEN-0001/12203754 | 2023-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/266378; 3ea98211-c94d-480b-aeae-aee54b9b3c9c/9b2a165e-4db3-4dd1-a236-0dc795b30075/RES-0000/TEN-0001/12203754 | 2025-09-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296159; 40e880e0-b9b0-470d-a01e-c83fa1009715/73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/TEN-0001/12203754 | 2026-11-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313257; 497a5537-436d-47c9-a6b2-abbeefebb1f1/362565e8-3134-43af-9dec-ff96b26dc0e7/RES-0000/TEN-0001/12203754 | 2024-01-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/273151; 75123e81-9c02-483b-b3a4-4cbc3ebfdc15/e1ce7b66-3724-4c03-b4af-2de4a34e1140/RES-0000/TEN-0001/12203754 | 2023-08-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/265814; 7a4f73e7-e53c-4b29-a74c-959a937cc680/0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/TEN-0001/12203754 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306311; 8028e46c-1def-4789-80c9-851e28dcd87f/eaf8e9a5-9e58-48c1-9956-1171f27cf378/RES-0000/TEN-0001/12203754 | 2025-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295114; 85bd448e-dd17-429d-8cb2-610ca73e1763/f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/TEN-0001/12203754 | 2026-02-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303257; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0000/TEN-0001/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0001/TEN-0002/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0002/TEN-0003/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0003/TEN-0004/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0004/TEN-0005/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0005/TEN-0006/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0006/TEN-0007/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/6b09534c-798d-41a5-9a63-223c6b073a3b/RES-0000/TEN-0001/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a97ddb7c-65e6-41b5-a893-3886ce74eb0d/ec4988d7-30e5-4434-a78a-504096e21d48/RES-0000/TEN-0001/12203754 | 2025-04-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288921; b9966b02-dc0a-4860-83ae-46e02442f2b9/7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/TEN-0001/12203754 | 2026-05-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306043; c4ba9378-70e8-4b27-b073-e17d18368f3f/d3985c28-918d-4ea6-b778-b7f0b38b7b37/RES-0000/TEN-0001/12203754 | 2024-03-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/273641; d1979e72-0465-4162-a4af-0c0b8553d6c0/e0b7e9b8-9dde-4c54-97df-5d1a251c73da/RES-0000/TEN-0001/12203754 | 2024-03-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274099; e7578e36-8254-41ab-9102-5cf16c79b294/1d8ec90e-c815-4de1-a534-6e25e54caeff/RES-0000/TEN-0001/12203754 | 2025-11-14 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299283; ef8f5b55-d77b-4af1-8959-94394aff2245/da2b343f-ffee-4331-a367-56054cf23e40/RES-0000/TEN-0001/12203754 | 2025-12-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298524; f3827a20-5b57-468c-9f2a-7d056e407921/5ce2bfdd-060a-4228-9c3d-ee692d851d92/RES-0000/TEN-0001/12203754 | 2025-10-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/297478 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/12203754 · 2026-11-03

ariregister:12203754 · 2011-12-09

73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/12203754 · 2026-11-03

17534391-7037-4c30-a891-dedff779f8f0/1ad38d97-8902-4362-8a8e-84a35fed0200/RES-0000/TEN-0001/12203754 · 2023-09-18

3ea98211-c94d-480b-aeae-aee54b9b3c9c/9b2a165e-4db3-4dd1-a236-0dc795b30075/RES-0000/TEN-0001/12203754 · 2025-09-10

40e880e0-b9b0-470d-a01e-c83fa1009715/73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/TEN-0001/12203754 · 2026-11-03

497a5537-436d-47c9-a6b2-abbeefebb1f1/362565e8-3134-43af-9dec-ff96b26dc0e7/RES-0000/TEN-0001/12203754 · 2024-01-26

75123e81-9c02-483b-b3a4-4cbc3ebfdc15/e1ce7b66-3724-4c03-b4af-2de4a34e1140/RES-0000/TEN-0001/12203754 · 2023-08-04

7a4f73e7-e53c-4b29-a74c-959a937cc680/0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/TEN-0001/12203754 · 2026-04-10

8028e46c-1def-4789-80c9-851e28dcd87f/eaf8e9a5-9e58-48c1-9956-1171f27cf378/RES-0000/TEN-0001/12203754 · 2025-07-01

85bd448e-dd17-429d-8cb2-610ca73e1763/f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/TEN-0001/12203754 · 2026-02-10

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0000/TEN-0001/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0001/TEN-0002/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0002/TEN-0003/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0003/TEN-0004/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0004/TEN-0005/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0005/TEN-0006/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0006/TEN-0007/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/6b09534c-798d-41a5-9a63-223c6b073a3b/RES-0000/TEN-0001/12203754 · 2023-12-01

a97ddb7c-65e6-41b5-a893-3886ce74eb0d/ec4988d7-30e5-4434-a78a-504096e21d48/RES-0000/TEN-0001/12203754 · 2025-04-29

b9966b02-dc0a-4860-83ae-46e02442f2b9/7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/TEN-0001/12203754 · 2026-05-29

c4ba9378-70e8-4b27-b073-e17d18368f3f/d3985c28-918d-4ea6-b778-b7f0b38b7b37/RES-0000/TEN-0001/12203754 · 2024-03-11

d1979e72-0465-4162-a4af-0c0b8553d6c0/e0b7e9b8-9dde-4c54-97df-5d1a251c73da/RES-0000/TEN-0001/12203754 · 2024-03-11

e7578e36-8254-41ab-9102-5cf16c79b294/1d8ec90e-c815-4de1-a534-6e25e54caeff/RES-0000/TEN-0001/12203754 · 2025-11-14

ef8f5b55-d77b-4af1-8959-94394aff2245/da2b343f-ffee-4331-a367-56054cf23e40/RES-0000/TEN-0001/12203754 · 2025-12-08

f3827a20-5b57-468c-9f2a-7d056e407921/5ce2bfdd-060a-4228-9c3d-ee692d851d92/RES-0000/TEN-0001/12203754 · 2025-10-28

Rannavälja põik kergliiklustee ehitusprojekti koostamine · 28.10.2026

Incorporated < 90 days before decision: Rule not met; ; ; a48f27da-9641-45ae-8752-debb91fd9440/RES-0000/12203754 | 2026-10-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315117; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Rule not met; ; ; a48f27da-9641-45ae-8752-debb91fd9440/RES-0000/12203754 | 2026-10-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315117 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-10-28 – 2026-10-28; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; f64b11ec-ceaf-4646-96f2-4e7e3f6e4c1a/a48f27da-9641-45ae-8752-debb91fd9440/RES-0000/TEN-0001/12203754 | 2026-10-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/315117 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

a48f27da-9641-45ae-8752-debb91fd9440/RES-0000/12203754 · 2026-10-28

ariregister:12203754 · 2011-12-09

a48f27da-9641-45ae-8752-debb91fd9440/RES-0000/12203754 · 2026-10-28

f64b11ec-ceaf-4646-96f2-4e7e3f6e4c1a/a48f27da-9641-45ae-8752-debb91fd9440/RES-0000/TEN-0001/12203754 · 2026-10-28

Ühistranspordi reaalaja tabloode ja bussiootepaviljonide projekteerimine · 26.10.2026

Incorporated < 90 days before decision: Rule not met; ; ; e1e45992-543e-4e1d-9cc6-18f48fd922df/RES-0000/12203754 | 2026-10-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314991; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Rule not met; ; ; e1e45992-543e-4e1d-9cc6-18f48fd922df/RES-0000/12203754 | 2026-10-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314991 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-10-26 – 2026-10-26; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 3b194e15-be2e-456a-81fc-11034b4b4f98/e1e45992-543e-4e1d-9cc6-18f48fd922df/RES-0000/TEN-0001/12203754 | 2026-10-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/314991 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

e1e45992-543e-4e1d-9cc6-18f48fd922df/RES-0000/12203754 · 2026-10-26

ariregister:12203754 · 2011-12-09

e1e45992-543e-4e1d-9cc6-18f48fd922df/RES-0000/12203754 · 2026-10-26

3b194e15-be2e-456a-81fc-11034b4b4f98/e1e45992-543e-4e1d-9cc6-18f48fd922df/RES-0000/TEN-0001/12203754 · 2026-10-26

Ülemiste veepuhastusjaama 1.astme pumpla survetrasside rekonstrueerimise projekteerimine · 29.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; b35cafd0-a420-4971-9103-54053e73b0cb/RES-0000/12203754 | 2026-07-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311547; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Rule not met; ; ; b35cafd0-a420-4971-9103-54053e73b0cb/RES-0000/12203754 | 2026-07-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311547 Repeated recorded procedures: Indicator present; Distinct procedures: 7; Retained award dates: 2023-04-26 – 2026-07-29; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 50db8455-7f09-4f4e-98ab-205da5f101dc/5e62ffb9-a9a1-47ab-832d-82d4893acc8c/RES-0000/TEN-0001/12203754 | 2025-03-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/289297; 65793eb8-4281-44d6-919f-dd786ffe7199/7548b989-c4c6-42b6-9c98-20947295b3f8/RES-0000/TEN-0001/12203754 | 2025-08-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296358; 6b8d7562-ea9d-4fd3-b000-af4fee2ec957/32022c9c-68ca-4412-80c0-98d7b4f79f1a/RES-0000/TEN-0001/12203754 | 2025-05-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/293678; 89d49246-dadf-45cc-a6ac-8e2ea3a204e0/f8f12386-3a8f-40d1-bb1d-0ba0f5b0c6b7/RES-0000/TEN-0001/12203754 | 2025-03-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/289854; ab580b1d-6b55-41cd-b77b-3dfafa9f00eb/6d8f50b0-d88d-4c61-9e89-07e5df80353f/RES-0000/TEN-0001/12203754 | 2023-04-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/260983; d0e28138-69f1-4b2b-8d5a-241535e47642/ed6efd8a-7e9c-4f19-b449-ed89bb89ab64/RES-0000/TEN-0001/12203754 | 2023-08-15 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/266829; e3bd51be-0862-44b8-b2ff-1c462ffd447f/b35cafd0-a420-4971-9103-54053e73b0cb/RES-0000/TEN-0001/12203754 | 2026-07-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/311547 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

b35cafd0-a420-4971-9103-54053e73b0cb/RES-0000/12203754 · 2026-07-29

ariregister:12203754 · 2011-12-09

b35cafd0-a420-4971-9103-54053e73b0cb/RES-0000/12203754 · 2026-07-29

50db8455-7f09-4f4e-98ab-205da5f101dc/5e62ffb9-a9a1-47ab-832d-82d4893acc8c/RES-0000/TEN-0001/12203754 · 2025-03-03

65793eb8-4281-44d6-919f-dd786ffe7199/7548b989-c4c6-42b6-9c98-20947295b3f8/RES-0000/TEN-0001/12203754 · 2025-08-04

6b8d7562-ea9d-4fd3-b000-af4fee2ec957/32022c9c-68ca-4412-80c0-98d7b4f79f1a/RES-0000/TEN-0001/12203754 · 2025-05-09

89d49246-dadf-45cc-a6ac-8e2ea3a204e0/f8f12386-3a8f-40d1-bb1d-0ba0f5b0c6b7/RES-0000/TEN-0001/12203754 · 2025-03-19

ab580b1d-6b55-41cd-b77b-3dfafa9f00eb/6d8f50b0-d88d-4c61-9e89-07e5df80353f/RES-0000/TEN-0001/12203754 · 2023-04-26

d0e28138-69f1-4b2b-8d5a-241535e47642/ed6efd8a-7e9c-4f19-b449-ed89bb89ab64/RES-0000/TEN-0001/12203754 · 2023-08-15

e3bd51be-0862-44b8-b2ff-1c462ffd447f/b35cafd0-a420-4971-9103-54053e73b0cb/RES-0000/TEN-0001/12203754 · 2026-07-29

Kadrioru lastepargi mänguväljaku rekonstrueerimisprojekti koostamise ja projekteerija järelevalve teenus · 17.06.2026

Incorporated < 90 days before decision: Rule not met; ; ; 1db8c408-1fbf-4a55-8a09-eb3608779b08/RES-0000/12203754 | 2026-06-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301799; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Rule not met; ; ; 1db8c408-1fbf-4a55-8a09-eb3608779b08/RES-0000/12203754 | 2026-06-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301799 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-06-17 – 2026-06-17; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; f5958d11-38c9-4c0a-bd36-3b4901302cb7/1db8c408-1fbf-4a55-8a09-eb3608779b08/RES-0000/TEN-0001/12203754 | 2026-06-17 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/301799 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

1db8c408-1fbf-4a55-8a09-eb3608779b08/RES-0000/12203754 · 2026-06-17

ariregister:12203754 · 2011-12-09

1db8c408-1fbf-4a55-8a09-eb3608779b08/RES-0000/12203754 · 2026-06-17

f5958d11-38c9-4c0a-bd36-3b4901302cb7/1db8c408-1fbf-4a55-8a09-eb3608779b08/RES-0000/TEN-0001/12203754 · 2026-06-17

„Viru bussiterminali kui sõlmjaama ruumiliste lahenduste välja selgitamine ja eskiiside koostamine“ · 10.06.2026

Incorporated < 90 days before decision: Rule not met; ; ; 0f8cfa7b-94d7-42de-b6da-b8fd72cf014b/RES-0000/12203754 | 2026-06-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309280; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Indicator present; ; ; 0f8cfa7b-94d7-42de-b6da-b8fd72cf014b/RES-0000/12203754 | 2026-06-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309280 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-06-10 – 2026-06-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; f9e978e6-ff8a-4e83-87ac-cb8ae4e7853a/0f8cfa7b-94d7-42de-b6da-b8fd72cf014b/RES-0000/TEN-0001/12203754 | 2026-06-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309280 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

0f8cfa7b-94d7-42de-b6da-b8fd72cf014b/RES-0000/12203754 · 2026-06-10

ariregister:12203754 · 2011-12-09

0f8cfa7b-94d7-42de-b6da-b8fd72cf014b/RES-0000/12203754 · 2026-06-10

f9e978e6-ff8a-4e83-87ac-cb8ae4e7853a/0f8cfa7b-94d7-42de-b6da-b8fd72cf014b/RES-0000/TEN-0001/12203754 · 2026-06-10

Maneeži tänava trammitee projekteerimine · 03.06.2026

Incorporated < 90 days before decision: Rule not met; ; ; a011c09f-eff8-48ea-9c31-3c6635d88ea4/RES-0000/12203754 | 2026-06-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306505; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Indicator present; ; ; a011c09f-eff8-48ea-9c31-3c6635d88ea4/RES-0000/12203754 | 2026-06-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306505 Repeated recorded procedures: Indicator present; Distinct procedures: 2; Retained award dates: 2023-05-11 – 2026-06-03; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 9bb7c23a-b81a-4ed5-9ebe-b14992d0b308/a011c09f-eff8-48ea-9c31-3c6635d88ea4/RES-0000/TEN-0001/12203754 | 2026-06-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306505; e6224fe2-ecc2-4d68-9604-983511460777/2918c9ee-4fe4-4ed1-af32-c9d6cd8d34f4/RES-0000/TEN-0001/12203754 | 2023-05-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/261139; e6224fe2-ecc2-4d68-9604-983511460777/ee1c7427-cf2f-4fb9-ac22-837013b75fb4/RES-0000/TEN-0001/12203754 | 2023-05-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/261139 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

a011c09f-eff8-48ea-9c31-3c6635d88ea4/RES-0000/12203754 · 2026-06-03

ariregister:12203754 · 2011-12-09

a011c09f-eff8-48ea-9c31-3c6635d88ea4/RES-0000/12203754 · 2026-06-03

9bb7c23a-b81a-4ed5-9ebe-b14992d0b308/a011c09f-eff8-48ea-9c31-3c6635d88ea4/RES-0000/TEN-0001/12203754 · 2026-06-03

e6224fe2-ecc2-4d68-9604-983511460777/2918c9ee-4fe4-4ed1-af32-c9d6cd8d34f4/RES-0000/TEN-0001/12203754 · 2023-05-11

e6224fe2-ecc2-4d68-9604-983511460777/ee1c7427-cf2f-4fb9-ac22-837013b75fb4/RES-0000/TEN-0001/12203754 · 2023-05-11

Vana-Kalamaja tn 15 mänguväljaku rekonstrueerimise põhiprojekt koostamine · 29.05.2026

Incorporated < 90 days before decision: Rule not met; ; ; 7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/12203754 | 2026-05-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306043; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Rule not met; ; ; 7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/12203754 | 2026-05-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306043 Repeated recorded procedures: Indicator present; Distinct procedures: 16; Retained award dates: 2023-08-04 – 2026-11-03; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 17534391-7037-4c30-a891-dedff779f8f0/1ad38d97-8902-4362-8a8e-84a35fed0200/RES-0000/TEN-0001/12203754 | 2023-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/266378; 3ea98211-c94d-480b-aeae-aee54b9b3c9c/9b2a165e-4db3-4dd1-a236-0dc795b30075/RES-0000/TEN-0001/12203754 | 2025-09-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296159; 40e880e0-b9b0-470d-a01e-c83fa1009715/73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/TEN-0001/12203754 | 2026-11-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313257; 497a5537-436d-47c9-a6b2-abbeefebb1f1/362565e8-3134-43af-9dec-ff96b26dc0e7/RES-0000/TEN-0001/12203754 | 2024-01-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/273151; 75123e81-9c02-483b-b3a4-4cbc3ebfdc15/e1ce7b66-3724-4c03-b4af-2de4a34e1140/RES-0000/TEN-0001/12203754 | 2023-08-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/265814; 7a4f73e7-e53c-4b29-a74c-959a937cc680/0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/TEN-0001/12203754 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306311; 8028e46c-1def-4789-80c9-851e28dcd87f/eaf8e9a5-9e58-48c1-9956-1171f27cf378/RES-0000/TEN-0001/12203754 | 2025-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295114; 85bd448e-dd17-429d-8cb2-610ca73e1763/f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/TEN-0001/12203754 | 2026-02-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303257; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0000/TEN-0001/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0001/TEN-0002/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0002/TEN-0003/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0003/TEN-0004/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0004/TEN-0005/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0005/TEN-0006/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0006/TEN-0007/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/6b09534c-798d-41a5-9a63-223c6b073a3b/RES-0000/TEN-0001/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a97ddb7c-65e6-41b5-a893-3886ce74eb0d/ec4988d7-30e5-4434-a78a-504096e21d48/RES-0000/TEN-0001/12203754 | 2025-04-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288921; b9966b02-dc0a-4860-83ae-46e02442f2b9/7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/TEN-0001/12203754 | 2026-05-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306043; c4ba9378-70e8-4b27-b073-e17d18368f3f/d3985c28-918d-4ea6-b778-b7f0b38b7b37/RES-0000/TEN-0001/12203754 | 2024-03-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/273641; d1979e72-0465-4162-a4af-0c0b8553d6c0/e0b7e9b8-9dde-4c54-97df-5d1a251c73da/RES-0000/TEN-0001/12203754 | 2024-03-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274099; e7578e36-8254-41ab-9102-5cf16c79b294/1d8ec90e-c815-4de1-a534-6e25e54caeff/RES-0000/TEN-0001/12203754 | 2025-11-14 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299283; ef8f5b55-d77b-4af1-8959-94394aff2245/da2b343f-ffee-4331-a367-56054cf23e40/RES-0000/TEN-0001/12203754 | 2025-12-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298524; f3827a20-5b57-468c-9f2a-7d056e407921/5ce2bfdd-060a-4228-9c3d-ee692d851d92/RES-0000/TEN-0001/12203754 | 2025-10-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/297478 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/12203754 · 2026-05-29

ariregister:12203754 · 2011-12-09

7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/12203754 · 2026-05-29

17534391-7037-4c30-a891-dedff779f8f0/1ad38d97-8902-4362-8a8e-84a35fed0200/RES-0000/TEN-0001/12203754 · 2023-09-18

3ea98211-c94d-480b-aeae-aee54b9b3c9c/9b2a165e-4db3-4dd1-a236-0dc795b30075/RES-0000/TEN-0001/12203754 · 2025-09-10

40e880e0-b9b0-470d-a01e-c83fa1009715/73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/TEN-0001/12203754 · 2026-11-03

497a5537-436d-47c9-a6b2-abbeefebb1f1/362565e8-3134-43af-9dec-ff96b26dc0e7/RES-0000/TEN-0001/12203754 · 2024-01-26

75123e81-9c02-483b-b3a4-4cbc3ebfdc15/e1ce7b66-3724-4c03-b4af-2de4a34e1140/RES-0000/TEN-0001/12203754 · 2023-08-04

7a4f73e7-e53c-4b29-a74c-959a937cc680/0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/TEN-0001/12203754 · 2026-04-10

8028e46c-1def-4789-80c9-851e28dcd87f/eaf8e9a5-9e58-48c1-9956-1171f27cf378/RES-0000/TEN-0001/12203754 · 2025-07-01

85bd448e-dd17-429d-8cb2-610ca73e1763/f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/TEN-0001/12203754 · 2026-02-10

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0000/TEN-0001/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0001/TEN-0002/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0002/TEN-0003/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0003/TEN-0004/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0004/TEN-0005/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0005/TEN-0006/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0006/TEN-0007/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/6b09534c-798d-41a5-9a63-223c6b073a3b/RES-0000/TEN-0001/12203754 · 2023-12-01

a97ddb7c-65e6-41b5-a893-3886ce74eb0d/ec4988d7-30e5-4434-a78a-504096e21d48/RES-0000/TEN-0001/12203754 · 2025-04-29

b9966b02-dc0a-4860-83ae-46e02442f2b9/7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/TEN-0001/12203754 · 2026-05-29

c4ba9378-70e8-4b27-b073-e17d18368f3f/d3985c28-918d-4ea6-b778-b7f0b38b7b37/RES-0000/TEN-0001/12203754 · 2024-03-11

d1979e72-0465-4162-a4af-0c0b8553d6c0/e0b7e9b8-9dde-4c54-97df-5d1a251c73da/RES-0000/TEN-0001/12203754 · 2024-03-11

e7578e36-8254-41ab-9102-5cf16c79b294/1d8ec90e-c815-4de1-a534-6e25e54caeff/RES-0000/TEN-0001/12203754 · 2025-11-14

ef8f5b55-d77b-4af1-8959-94394aff2245/da2b343f-ffee-4331-a367-56054cf23e40/RES-0000/TEN-0001/12203754 · 2025-12-08

f3827a20-5b57-468c-9f2a-7d056e407921/5ce2bfdd-060a-4228-9c3d-ee692d851d92/RES-0000/TEN-0001/12203754 · 2025-10-28

Mustamäe tee 167, 169, 171 ja 171a majade vahelise hooviala projekteerimine · 10.04.2026

Incorporated < 90 days before decision: Rule not met; ; ; 0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/12203754 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306311; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Rule not met; ; ; 0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/12203754 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306311 Repeated recorded procedures: Indicator present; Distinct procedures: 16; Retained award dates: 2023-08-04 – 2026-11-03; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 17534391-7037-4c30-a891-dedff779f8f0/1ad38d97-8902-4362-8a8e-84a35fed0200/RES-0000/TEN-0001/12203754 | 2023-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/266378; 3ea98211-c94d-480b-aeae-aee54b9b3c9c/9b2a165e-4db3-4dd1-a236-0dc795b30075/RES-0000/TEN-0001/12203754 | 2025-09-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296159; 40e880e0-b9b0-470d-a01e-c83fa1009715/73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/TEN-0001/12203754 | 2026-11-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313257; 497a5537-436d-47c9-a6b2-abbeefebb1f1/362565e8-3134-43af-9dec-ff96b26dc0e7/RES-0000/TEN-0001/12203754 | 2024-01-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/273151; 75123e81-9c02-483b-b3a4-4cbc3ebfdc15/e1ce7b66-3724-4c03-b4af-2de4a34e1140/RES-0000/TEN-0001/12203754 | 2023-08-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/265814; 7a4f73e7-e53c-4b29-a74c-959a937cc680/0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/TEN-0001/12203754 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306311; 8028e46c-1def-4789-80c9-851e28dcd87f/eaf8e9a5-9e58-48c1-9956-1171f27cf378/RES-0000/TEN-0001/12203754 | 2025-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295114; 85bd448e-dd17-429d-8cb2-610ca73e1763/f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/TEN-0001/12203754 | 2026-02-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303257; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0000/TEN-0001/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0001/TEN-0002/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0002/TEN-0003/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0003/TEN-0004/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0004/TEN-0005/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0005/TEN-0006/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0006/TEN-0007/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/6b09534c-798d-41a5-9a63-223c6b073a3b/RES-0000/TEN-0001/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a97ddb7c-65e6-41b5-a893-3886ce74eb0d/ec4988d7-30e5-4434-a78a-504096e21d48/RES-0000/TEN-0001/12203754 | 2025-04-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288921; b9966b02-dc0a-4860-83ae-46e02442f2b9/7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/TEN-0001/12203754 | 2026-05-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306043; c4ba9378-70e8-4b27-b073-e17d18368f3f/d3985c28-918d-4ea6-b778-b7f0b38b7b37/RES-0000/TEN-0001/12203754 | 2024-03-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/273641; d1979e72-0465-4162-a4af-0c0b8553d6c0/e0b7e9b8-9dde-4c54-97df-5d1a251c73da/RES-0000/TEN-0001/12203754 | 2024-03-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274099; e7578e36-8254-41ab-9102-5cf16c79b294/1d8ec90e-c815-4de1-a534-6e25e54caeff/RES-0000/TEN-0001/12203754 | 2025-11-14 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299283; ef8f5b55-d77b-4af1-8959-94394aff2245/da2b343f-ffee-4331-a367-56054cf23e40/RES-0000/TEN-0001/12203754 | 2025-12-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298524; f3827a20-5b57-468c-9f2a-7d056e407921/5ce2bfdd-060a-4228-9c3d-ee692d851d92/RES-0000/TEN-0001/12203754 | 2025-10-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/297478 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/12203754 · 2026-04-10

ariregister:12203754 · 2011-12-09

0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/12203754 · 2026-04-10

17534391-7037-4c30-a891-dedff779f8f0/1ad38d97-8902-4362-8a8e-84a35fed0200/RES-0000/TEN-0001/12203754 · 2023-09-18

3ea98211-c94d-480b-aeae-aee54b9b3c9c/9b2a165e-4db3-4dd1-a236-0dc795b30075/RES-0000/TEN-0001/12203754 · 2025-09-10

40e880e0-b9b0-470d-a01e-c83fa1009715/73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/TEN-0001/12203754 · 2026-11-03

497a5537-436d-47c9-a6b2-abbeefebb1f1/362565e8-3134-43af-9dec-ff96b26dc0e7/RES-0000/TEN-0001/12203754 · 2024-01-26

75123e81-9c02-483b-b3a4-4cbc3ebfdc15/e1ce7b66-3724-4c03-b4af-2de4a34e1140/RES-0000/TEN-0001/12203754 · 2023-08-04

7a4f73e7-e53c-4b29-a74c-959a937cc680/0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/TEN-0001/12203754 · 2026-04-10

8028e46c-1def-4789-80c9-851e28dcd87f/eaf8e9a5-9e58-48c1-9956-1171f27cf378/RES-0000/TEN-0001/12203754 · 2025-07-01

85bd448e-dd17-429d-8cb2-610ca73e1763/f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/TEN-0001/12203754 · 2026-02-10

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0000/TEN-0001/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0001/TEN-0002/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0002/TEN-0003/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0003/TEN-0004/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0004/TEN-0005/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0005/TEN-0006/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0006/TEN-0007/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/6b09534c-798d-41a5-9a63-223c6b073a3b/RES-0000/TEN-0001/12203754 · 2023-12-01

a97ddb7c-65e6-41b5-a893-3886ce74eb0d/ec4988d7-30e5-4434-a78a-504096e21d48/RES-0000/TEN-0001/12203754 · 2025-04-29

b9966b02-dc0a-4860-83ae-46e02442f2b9/7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/TEN-0001/12203754 · 2026-05-29

c4ba9378-70e8-4b27-b073-e17d18368f3f/d3985c28-918d-4ea6-b778-b7f0b38b7b37/RES-0000/TEN-0001/12203754 · 2024-03-11

d1979e72-0465-4162-a4af-0c0b8553d6c0/e0b7e9b8-9dde-4c54-97df-5d1a251c73da/RES-0000/TEN-0001/12203754 · 2024-03-11

e7578e36-8254-41ab-9102-5cf16c79b294/1d8ec90e-c815-4de1-a534-6e25e54caeff/RES-0000/TEN-0001/12203754 · 2025-11-14

ef8f5b55-d77b-4af1-8959-94394aff2245/da2b343f-ffee-4331-a367-56054cf23e40/RES-0000/TEN-0001/12203754 · 2025-12-08

f3827a20-5b57-468c-9f2a-7d056e407921/5ce2bfdd-060a-4228-9c3d-ee692d851d92/RES-0000/TEN-0001/12203754 · 2025-10-28

Pääsküla raba kaitseala kraavivõrgustiku ja külastustaristu rekonstrueerimise projekti koostamine · 10.02.2026

Incorporated < 90 days before decision: Rule not met; ; ; f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/12203754 | 2026-02-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303257; ariregister:12203754 | 2011-12-09 | https://ariregister.rik.ee/est/company/12203754 One tender reported: Indicator present; ; ; f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/12203754 | 2026-02-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303257 Repeated recorded procedures: Indicator present; Distinct procedures: 16; Retained award dates: 2023-08-04 – 2026-11-03; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 17534391-7037-4c30-a891-dedff779f8f0/1ad38d97-8902-4362-8a8e-84a35fed0200/RES-0000/TEN-0001/12203754 | 2023-09-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/266378; 3ea98211-c94d-480b-aeae-aee54b9b3c9c/9b2a165e-4db3-4dd1-a236-0dc795b30075/RES-0000/TEN-0001/12203754 | 2025-09-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/296159; 40e880e0-b9b0-470d-a01e-c83fa1009715/73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/TEN-0001/12203754 | 2026-11-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/313257; 497a5537-436d-47c9-a6b2-abbeefebb1f1/362565e8-3134-43af-9dec-ff96b26dc0e7/RES-0000/TEN-0001/12203754 | 2024-01-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/273151; 75123e81-9c02-483b-b3a4-4cbc3ebfdc15/e1ce7b66-3724-4c03-b4af-2de4a34e1140/RES-0000/TEN-0001/12203754 | 2023-08-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/265814; 7a4f73e7-e53c-4b29-a74c-959a937cc680/0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/TEN-0001/12203754 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306311; 8028e46c-1def-4789-80c9-851e28dcd87f/eaf8e9a5-9e58-48c1-9956-1171f27cf378/RES-0000/TEN-0001/12203754 | 2025-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295114; 85bd448e-dd17-429d-8cb2-610ca73e1763/f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/TEN-0001/12203754 | 2026-02-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303257; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0000/TEN-0001/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0001/TEN-0002/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0002/TEN-0003/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0003/TEN-0004/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0004/TEN-0005/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0005/TEN-0006/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0006/TEN-0007/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a96bc98b-d96c-4e38-909b-5de6415f673d/6b09534c-798d-41a5-9a63-223c6b073a3b/RES-0000/TEN-0001/12203754 | 2023-12-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/270280; a97ddb7c-65e6-41b5-a893-3886ce74eb0d/ec4988d7-30e5-4434-a78a-504096e21d48/RES-0000/TEN-0001/12203754 | 2025-04-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/288921; b9966b02-dc0a-4860-83ae-46e02442f2b9/7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/TEN-0001/12203754 | 2026-05-29 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306043; c4ba9378-70e8-4b27-b073-e17d18368f3f/d3985c28-918d-4ea6-b778-b7f0b38b7b37/RES-0000/TEN-0001/12203754 | 2024-03-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/273641; d1979e72-0465-4162-a4af-0c0b8553d6c0/e0b7e9b8-9dde-4c54-97df-5d1a251c73da/RES-0000/TEN-0001/12203754 | 2024-03-11 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274099; e7578e36-8254-41ab-9102-5cf16c79b294/1d8ec90e-c815-4de1-a534-6e25e54caeff/RES-0000/TEN-0001/12203754 | 2025-11-14 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299283; ef8f5b55-d77b-4af1-8959-94394aff2245/da2b343f-ffee-4331-a367-56054cf23e40/RES-0000/TEN-0001/12203754 | 2025-12-08 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298524; f3827a20-5b57-468c-9f2a-7d056e407921/5ce2bfdd-060a-4228-9c3d-ee692d851d92/RES-0000/TEN-0001/12203754 | 2025-10-28 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/297478 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/12203754 · 2026-02-10

ariregister:12203754 · 2011-12-09

f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/12203754 · 2026-02-10

17534391-7037-4c30-a891-dedff779f8f0/1ad38d97-8902-4362-8a8e-84a35fed0200/RES-0000/TEN-0001/12203754 · 2023-09-18

3ea98211-c94d-480b-aeae-aee54b9b3c9c/9b2a165e-4db3-4dd1-a236-0dc795b30075/RES-0000/TEN-0001/12203754 · 2025-09-10

40e880e0-b9b0-470d-a01e-c83fa1009715/73e39109-98f6-457d-bec5-95024ad5e919/RES-0000/TEN-0001/12203754 · 2026-11-03

497a5537-436d-47c9-a6b2-abbeefebb1f1/362565e8-3134-43af-9dec-ff96b26dc0e7/RES-0000/TEN-0001/12203754 · 2024-01-26

75123e81-9c02-483b-b3a4-4cbc3ebfdc15/e1ce7b66-3724-4c03-b4af-2de4a34e1140/RES-0000/TEN-0001/12203754 · 2023-08-04

7a4f73e7-e53c-4b29-a74c-959a937cc680/0d7bbcb0-4b3a-41ce-9729-1c3c93d5fe16/RES-0000/TEN-0001/12203754 · 2026-04-10

8028e46c-1def-4789-80c9-851e28dcd87f/eaf8e9a5-9e58-48c1-9956-1171f27cf378/RES-0000/TEN-0001/12203754 · 2025-07-01

85bd448e-dd17-429d-8cb2-610ca73e1763/f25f4654-9bab-43f8-bf3c-55ff3637d978/RES-0000/TEN-0001/12203754 · 2026-02-10

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0000/TEN-0001/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0001/TEN-0002/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0002/TEN-0003/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0003/TEN-0004/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0004/TEN-0005/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0005/TEN-0006/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/49419aa5-0c45-4e07-9605-ba9aa434c90e/RES-0006/TEN-0007/12203754 · 2023-12-01

a96bc98b-d96c-4e38-909b-5de6415f673d/6b09534c-798d-41a5-9a63-223c6b073a3b/RES-0000/TEN-0001/12203754 · 2023-12-01

a97ddb7c-65e6-41b5-a893-3886ce74eb0d/ec4988d7-30e5-4434-a78a-504096e21d48/RES-0000/TEN-0001/12203754 · 2025-04-29

b9966b02-dc0a-4860-83ae-46e02442f2b9/7ab50b9c-1d41-4653-ad50-0142f49a8020/RES-0000/TEN-0001/12203754 · 2026-05-29

c4ba9378-70e8-4b27-b073-e17d18368f3f/d3985c28-918d-4ea6-b778-b7f0b38b7b37/RES-0000/TEN-0001/12203754 · 2024-03-11

d1979e72-0465-4162-a4af-0c0b8553d6c0/e0b7e9b8-9dde-4c54-97df-5d1a251c73da/RES-0000/TEN-0001/12203754 · 2024-03-11

e7578e36-8254-41ab-9102-5cf16c79b294/1d8ec90e-c815-4de1-a534-6e25e54caeff/RES-0000/TEN-0001/12203754 · 2025-11-14

ef8f5b55-d77b-4af1-8959-94394aff2245/da2b343f-ffee-4331-a367-56054cf23e40/RES-0000/TEN-0001/12203754 · 2025-12-08

f3827a20-5b57-468c-9f2a-7d056e407921/5ce2bfdd-060a-4228-9c3d-ee692d851d92/RES-0000/TEN-0001/12203754 · 2025-10-28

Showing 10 · View market winners

Source: Riigihangete register · Riigihangete register: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What changed in the company history (snapshot 10.11.2026)?

K-Projekt Aktsiaselts: the timeline shows historical events, not an assessment of current status (source: Äriregister, EMTA, Ametlikud Teadaanded, RAR; snapshot: 10.11.2026).

#ajajoonSnapshot

2026

  • Share capital changed: €34,280 → €37,080
    register
Reports, taxes and grants (2)
  • Tax Board 2026 III: turnover €877.4k, employees: 55
    taxes
  • State aid decision: Ettevõtluse ja Innovatsiooni Sihtasutus · T&A VTA >> T&A VTA, €7.93k
    aidsource ↗

2025

  • Share capital changed: €29,520 → €34,280
    register

2024

  • Share capital changed: €25,000 → €29,520
    register

2011

  • Entered in the business register
    register
  • Share capital changed: missing → €25,000
    register
  • Name changed: missing → K-Projekt Aktsiaselts
    register
  • Status changed: missing → in the register
    register
  • Division: related company 10329480
    register

Showing 10 / 35

Events: 35 · newest first · Sources: Business Register, Tax Board, RTK, Official Notices

Which sources supply the data (snapshot 10.11.2026)?

K-Projekt Aktsiaselts: displayed source records 9 (source: Äriregister, EMTA, RTK, MTR, Keskkonnaamet, Ametlikud Teadaanded, Riigi kinnisvararegister, Riigihangete register, RIK laevakinnistusraamat; snapshot: 10.11.2026).

#allikadSnapshot
View Markdown

↔ Scroll horizontally to see all columns.

Block, source, licence, period, vintage and official link
BlockSourceLicenceExpected cadenceSource observationSnapshotCheckedOfficial record
Business RegisterÄriregisterCC BY 4.0nightlySource observation date unknown10.11.2026 19:4410.11.2026open ↗
TaxesEMTACC BY-SA 3.0quarterly tax figures / daily debt listDebt list observed: 09.11.2026 · daily debt list10.11.2026 19:4410.11.2026open ↗
GrantsRTKCC BY-SA 3.0 (Euroopa Liidu struktuuritoetus). RAR: AvTS § 3¹ lg 9.missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
LicencesMTRCC BY-SA 3.0missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
LicencesKeskkonnaametAvTS § 3¹ lg 9missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
AnnouncementsAmetlikud TeadaandedCC BY-SA 4.0nightlyLatest retained notice published: 09.11.2026 · Source observation date unknown10.11.2026 19:4410.11.2026open ↗
State propertyRiigi kinnisvararegisterCC0 1.0missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
Public procurementRiigihangete registerCC BY-SA 3.0nightlySource observation date unknown10.11.2026 19:4410.11.2026open ↗
missingRIK laevakinnistusraamatCC BY-SA 4.0missingSource observation date unknownmissingmissingopen ↗
Court decisions, trademarks, sanctionssource missing — a company-level link has not been published yet; this does not mean there are no records
Dates and their basis

Source observation is the source’s own as-of date; the latest notice publication does not prove observation. Snapshot is the data extract publication time. Checked is the source availability check. Missing clocks are not inferred from other dates.

Shortcuts

Quick search/ Ctrl+K
Home · Sectors · Regionsg h · g s · g r
Grants · Procurement · Compare · Watchlistg t · g k · g v · g j
In a table: move · open · compare · watchjk · ↵ · c · w
On a company page: sections1–9
←→↑↓ · Home · End

Use arrow keys to explore data points. Home and End move to the first and last point.

Close / backesc