Terrat AS
In the registerRegistry code: 10095208
Terrat AS: 2025 revenue 8,550,730 €, net profit 1,549,051 € (Company only). 38 employees, 2025 annual average (Company only). Äriregister. Snapshot: 10.11.2026.
- Current tax-debt statusNot listedEMTA. Observation: 09.11.2026Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.
- Report 2025FiledÄriregisterCompany only
- NoticesNo warning noticesAmetlikud Teadaanded. Observation: 09.11.2026
- Revenue 20258,550,730 ۀriregisterCompany only
- Employees 202538Äriregisterannual average; Company only
Place in the peer group
EMTAK 4221, Harju County, 2025
Revenue 2025, company only, n = 27 filed reports
marker = company, band = p25–p75, axis = percentile 0–100
| Metric | Company | Median | Percentile |
|---|---|---|---|
| Revenue | 8,550,730 € | 438,031 € | p96 (n = 27) |
| Net profit | 1,549,051 € | 5,052 € | p100 (n = 32) |
| Equity | 5,678,777 € | 138,060 € | p97 (n = 32) |
| Employees | 38 | 2 | p100 (n = 33) |
Each percentile is computed separately, so n differs; hidden below 5 companies; medians and quartiles in whole euros (rounded). Source: Business Register (annual reports), snapshot 10.11.2026.
Not an official extract; no credit rating is provided.
Register details and contacts
- Registered name
- Aktsiaselts Terrat
- Registry code
- 10095208
- Status
- in the register (R)
- Legal form
- Public limited company
- Registered
- 11.11.1996
- Share capital
- 429,478 €
- VAT number
- EE100434945
- Main activity
- 4221 Construction of utility projects for fluids
- Address
- Harju County · Harku vald, Tutermaa küla, Meistri tee 4
- Website
- terrat.ee
- Phone
- +372 6790977
- info@terrat.ee
Source: Business Register (open data), CC BY 4.0
Names of current board members load in the interactive view.
Aktsiaselts Terrat is a public limited company. In 2025, revenue grew 5.6 % to 8,550,730 €, profit grew 209.6 %. The main activity is Construction of utility projects for fluids (4221). The company is located in Harju County. Registered 11.11.1996. Share capital is 429,478 €. 2025 annual-report figures (Company only): profit 1,549,051 €, annual average employees 38. Taxes for III quarter of 2026 were 313,739 €. Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026. There are 7 activity-licence records (including history). There are 38 single-winner procurement wins (2023–2026); recorded contract/framework ceiling value 17,066,247.34 €, not actual payments. Shared-award ceilings are recorded separately and are not added to this company total.
What are the company indicators (2025)?
Terrat AS: revenue 8,550,730 € (period: 2025; company only; source: Äriregister; snapshot: 10.11.2026).
Annual-report figures: Company only Tax data refers to this legal entity.
Peer group: 4221 · Harju County · 2025 · n = 27
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Revenue2019 – 2025 | 8,550,730 € | +5.6 % | p96 (n = 27) | 2025; Company only | RIK | checked 10.11.2026 | +5.6 %p96 (n = 27)2025; Company onlyRIKchecked 10.11.2026 |
| Net profit2019 – 2025 | 1,549,051 € | +209.6 % | p100 (n = 32) | 2025 · margin 18.1 % (previous year 6.2 %); Company only | RIK | checked 10.11.2026 | +209.6 %p100 (n = 32)2025 · margin 18.1 % (previous year 6.2 %); Company onlyRIKchecked 10.11.2026 |
| Equity2019 – 2025 | 5,678,777 € | — | p97 (n = 32) | 2025 · share of assets 80.1 % (previous year 80.4 %); Company only | RIK | checked 10.11.2026 | p97 (n = 32)2025 · share of assets 80.1 % (previous year 80.4 %); Company onlyRIKchecked 10.11.2026 |
| Employees2019 – 2025 | 38 | — | p100 (n = 33) | 2025; Company only | RIK | checked 10.11.2026 | p100 (n = 33)2025; Company onlyRIKchecked 10.11.2026 |
| Turnover per the Tax Board2022 I – 2026 III | 2,231,663 € | — | — | 2025 IV · VAT registered; Company only | MTA | checked 10.11.2026 | 2025 IV · VAT registered; Company onlyMTAchecked 10.11.2026 |
| State taxes2022 I – 2026 III | 513,156 € | — | — | 2025 IV; Company only | MTA | checked 10.11.2026 | 2025 IV; Company onlyMTAchecked 10.11.2026 |
| Labour taxes2022 I – 2026 III | 156,066 € | — | — | 2025 IV; Company only | MTA | checked 10.11.2026 | 2025 IV; Company onlyMTAchecked 10.11.2026 |
| State aid received | missing | — | — | no state-aid decisions | RAR, RTK | checked 10.11.2026 | no state-aid decisionsRAR, RTKchecked 10.11.2026 |
| Report 2025 | filed | — | — | — | RIK | checked 10.11.2026 | RIKchecked 10.11.2026 |
EMTA: state taxes are paid taxes net of refunds; labour taxes are paid income and social tax plus pension and unemployment insurance contributions.
The percentile (p) is the company rank among peers in the same activity and county in the same year. It is hidden when fewer than 5 companies qualify. Each figure shows its period and source.
Which legal entities are related to the company (snapshot 10.11.2026)?
Terrat AS: ownership links are between legal entities only; shared-board links show companies, not people (source: Äriregister; snapshot: 10.11.2026).
Dated register facts. No signals does not confirm the absence of liabilities.
Owners and holdings
Shareholders are recorded in the securities register (Nasdaq CSD), not in the Business Register open data — owners are unknown here.
Business Register shareholders
State property contracts
Fees exclude VAT; currency is unknown. Each fee has its own period. Never sum or annualise fees. Types and statuses are source assertions; this is not a general property ownership register.
Rows on this page / total records: 0 / 0
No state property contracts in this snapshot.
Companies sharing a board member
Source: Äriregister · Riigi kinnisvararegister · Äriregister: Source observation date unknown · Riigi kinnisvararegister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences
What are the company signals (snapshot 10.11.2026)?
we count and cite; we do not gradeTerrat AS: Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026.
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Current tax-debt status | Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.Check directly: EMTA | — | — | — | EMTA | 09.11.2026 | EMTA09.11.2026 |
| Debt episode (history) | missing | — | — | off the list after 3 consecutive absences (EMTA ~11th/~21st swings) | EMTA | 09.11.2026 | off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTA09.11.2026 |
| Annual reports | Report 2025 filed | — | — | — | RIK | checked 10.11.2026 | RIKchecked 10.11.2026 |
| Official notices | No bankruptcy, liquidation, restructuring or enforcement notices | — | — | 5 years | Ametlikud Teadaanded | checked 10.11.2026 | 5 yearsAmetlikud Teadaandedchecked 10.11.2026 |
| Status | Status changes: 1 | — | — | status history: 7 entries | RIK | checked 10.11.2026 | status history: 7 entriesRIKchecked 10.11.2026 |
| Composite signal (derived) | Lowview | — | — | Report lateness is not scored. Notice selection and time windows differ from those used for the score. | Ärikratt | — | Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt |
| Commercial pledge | 3 pledges · total 1,075,204.84 € | — | — | latest entry 10.04.2013 · pledgee names withheld | RIK | checked 10.11.2026 | latest entry 10.04.2013 · pledgee names withheldRIKchecked 10.11.2026 |
| Court decisions · sanctions · trademarks | source missing | — | — | a company-level link has not been published yet | — | — | a company-level link has not been published yet |
Composite signal components (derived, not an official score)
Score (derived) 0/100 derived
A composite signal from structured data, not an official assessment or credit rating. It describes data known at calculation time; no forecast horizon is specified.
Calculated 10.11.2026 10:15.
Methodology version: 1.3.
Stored component contributions
- Tax debt · 0 points
- Financial health · 0 points
- Board changes · 0 points
- Insolvency notices · 0 points
- Licence loss · 0 points
A stored 0 proves neither absence of events nor complete source coverage. Without detail, its cause is unknown.
The underlying record reference is unavailable. No specific event or document can be identified.
methodologyCalculated 10.11.2026 10:15. The score is not a credit rating and not a default forecast. methodology · The score is not a credit rating
Snapshot: Äriregister: 10.11.2026 19:44 · EMTA: 10.11.2026 19:44 · Ametlikud Teadaanded: 10.11.2026 19:44
What are the company financial results (2025)?
Terrat AS: net profit 1,549,051 € (period: 2025; company only; source: Äriregister; snapshot: 10.11.2026).
2025 · Company only: revenue 8,550,730 €, net profit 1,549,051 €.
Annual reports 2019–2025
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|
| Revenue | 8,550,730 € | +5.6 % | 2025; Company only | RIK | checked 10.11.2026 | +5.6 %2025; Company onlyRIKchecked 10.11.2026 |
| Net profit | 1,549,051 € | +209.6 % | 2025; Company only | RIK | checked 10.11.2026 | +209.6 %2025; Company onlyRIKchecked 10.11.2026 |
| Equity | 5,678,777 € | +25.4 % | 2025; Company only | RIK | checked 10.11.2026 | +25.4 %2025; Company onlyRIKchecked 10.11.2026 |
| Assets | 7,092,185 € | +26 % | 2025; Company only | RIK | checked 10.11.2026 | +26 %2025; Company onlyRIKchecked 10.11.2026 |
| Employees | 38 | 0 % | 2025; Company only | RIK | checked 10.11.2026 | 0 %2025; Company onlyRIKchecked 10.11.2026 |
| Revenue | 8,095,139 € | +12.7 % | 2024; Company only | RIK | checked 10.11.2026 | +12.7 %2024; Company onlyRIKchecked 10.11.2026 |
| Net profit | 500,342 € | -33.8 % | 2024; Company only | RIK | checked 10.11.2026 | -33.8 %2024; Company onlyRIKchecked 10.11.2026 |
| Equity | 4,529,726 € | -10.6 % | 2024; Company only | RIK | checked 10.11.2026 | -10.6 %2024; Company onlyRIKchecked 10.11.2026 |
| Assets | 5,630,672 € | -9.2 % | 2024; Company only | RIK | checked 10.11.2026 | -9.2 %2024; Company onlyRIKchecked 10.11.2026 |
| Employees | 38 | -2.6 % | 2024; Company only | RIK | checked 10.11.2026 | -2.6 %2024; Company onlyRIKchecked 10.11.2026 |
| Revenue | 7,180,412 € | -15.7 % | 2023; Company only | RIK | checked 10.11.2026 | -15.7 %2023; Company onlyRIKchecked 10.11.2026 |
| Net profit | 755,602 € | -25.2 % | 2023; Company only | RIK | checked 10.11.2026 | -25.2 %2023; Company onlyRIKchecked 10.11.2026 |
| Equity | 5,067,871 € | +4.6 % | 2023; Company only | RIK | checked 10.11.2026 | +4.6 %2023; Company onlyRIKchecked 10.11.2026 |
| Assets | 6,201,503 € | -1.3 % | 2023; Company only | RIK | checked 10.11.2026 | -1.3 %2023; Company onlyRIKchecked 10.11.2026 |
| Employees | 39 | -9.3 % | 2023; Company only | RIK | checked 10.11.2026 | -9.3 %2023; Company onlyRIKchecked 10.11.2026 |
| Revenue | 8,520,892 € | +21.1 % | 2022; Company only | RIK | checked 10.11.2026 | +21.1 %2022; Company onlyRIKchecked 10.11.2026 |
| Net profit | 1,010,584 € | +4.5 % | 2022; Company only | RIK | checked 10.11.2026 | +4.5 %2022; Company onlyRIKchecked 10.11.2026 |
| Equity | 4,843,009 € | +6.5 % | 2022; Company only | RIK | checked 10.11.2026 | +6.5 %2022; Company onlyRIKchecked 10.11.2026 |
| Assets | 6,281,660 € | +9.9 % | 2022; Company only | RIK | checked 10.11.2026 | +9.9 %2022; Company onlyRIKchecked 10.11.2026 |
| Employees | 43 | +4.9 % | 2022; Company only | RIK | checked 10.11.2026 | +4.9 %2022; Company onlyRIKchecked 10.11.2026 |
| Revenue | 7,034,101 € | +24.6 % | 2021; Company only | RIK | checked 10.11.2026 | +24.6 %2021; Company onlyRIKchecked 10.11.2026 |
| Net profit | 966,963 € | +58.5 % | 2021; Company only | RIK | checked 10.11.2026 | +58.5 %2021; Company onlyRIKchecked 10.11.2026 |
| Equity | 4,546,503 € | +14.1 % | 2021; Company only | RIK | checked 10.11.2026 | +14.1 %2021; Company onlyRIKchecked 10.11.2026 |
| Assets | 5,713,837 € | +14 % | 2021; Company only | RIK | checked 10.11.2026 | +14 %2021; Company onlyRIKchecked 10.11.2026 |
| Employees | 41 | -2.4 % | 2021; Company only | RIK | checked 10.11.2026 | -2.4 %2021; Company onlyRIKchecked 10.11.2026 |
| Revenue | 5,643,084 € | -19.1 % | 2020; Company only | RIK | checked 10.11.2026 | -19.1 %2020; Company onlyRIKchecked 10.11.2026 |
| Net profit | 610,201 € | -38.3 % | 2020; Company only | RIK | checked 10.11.2026 | -38.3 %2020; Company onlyRIKchecked 10.11.2026 |
| Equity | 3,984,177 € | +11.5 % | 2020; Company only | RIK | checked 10.11.2026 | +11.5 %2020; Company onlyRIKchecked 10.11.2026 |
| Assets | 5,010,948 € | +5.2 % | 2020; Company only | RIK | checked 10.11.2026 | +5.2 %2020; Company onlyRIKchecked 10.11.2026 |
| Employees | 42 | 0 % | 2020; Company only | RIK | checked 10.11.2026 | 0 %2020; Company onlyRIKchecked 10.11.2026 |
| Revenue | 6,971,765 € | — | 2019; Company only | RIK | checked 10.11.2026 | 2019; Company onlyRIKchecked 10.11.2026 |
| Net profit | 988,496 € | — | 2019; Company only | RIK | checked 10.11.2026 | 2019; Company onlyRIKchecked 10.11.2026 |
| Equity | 3,573,975 € | — | 2019; Company only | RIK | checked 10.11.2026 | 2019; Company onlyRIKchecked 10.11.2026 |
| Assets | 4,764,276 € | — | 2019; Company only | RIK | checked 10.11.2026 | 2019; Company onlyRIKchecked 10.11.2026 |
| Employees | 42 | — | 2019; Company only | RIK | checked 10.11.2026 | 2019; Company onlyRIKchecked 10.11.2026 |
Source: Äriregister · Latest available report year: 2025 (annual reporting) · Äriregister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences
How much tax did the company pay (2026 III)?
Terrat AS: state taxes 313,739 € (period: 2026 III; company only; source: EMTA; snapshot: 10.11.2026).
↔ Scroll horizontally to see all columns.
| Metric | Value | Δ | Position | Period and basis | Source | As of | Comparison and sources |
|---|---|---|---|---|---|---|---|
| Quarterly declared turnover (EMTA) | 1,746,246 € | — | — | 2026 III; Company only | EMTA | checked 10.11.2026 | 2026 III; Company onlyEMTAchecked 10.11.2026 |
| State taxes | 313,739 € | — | — | 2026 III; Company only | EMTA | checked 10.11.2026 | 2026 III; Company onlyEMTAchecked 10.11.2026 |
| Labour taxes | 145,190 € | — | — | 2026 III; Company only | EMTA | checked 10.11.2026 | 2026 III; Company onlyEMTAchecked 10.11.2026 |
| Employees (EMTA quarter, legal entity) | 36 | — | — | 2026 III; Company only | EMTA | checked 10.11.2026 | 2026 III; Company onlyEMTAchecked 10.11.2026 |
| Quarter | Quarterly declared turnover (EMTA) (€) | State taxes € | Labour taxes € | Employees (EMTA quarter, legal entity) |
|---|---|---|---|---|
| 2026 III | 1,746,246 | 313,739 | 145,190 | 36 |
| 2026 II | 1,860,482 | 705,962 | 327,126 | 36 |
| 2026 I | 1,133,862 | 311,149 | 148,410 | 36 |
| 2025 IV | 2,231,663 | 513,156 | 156,066 | 36 |
| 2025 III | 2,699,566 | 324,366 | 169,598 | 36 |
| 2025 II | 2,606,068 | 404,205 | 240,904 | 36 |
| 2025 I | 1,642,515 | 357,820 | 144,688 | 36 |
| 2024 IV | 2,384,739 | 326,802 | 144,388 | 36 |
| 2024 III | 2,222,075 | 345,956 | 156,207 | 36 |
| 2024 II | 1,540,546 | 416,880 | 252,156 | 36 |
Showing 10 / 19
Source: EMTA · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · EMTA: Debt list observed: 09.11.2026 · daily debt list · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences
What state aid has the company received (snapshot 10.11.2026)?
Terrat AS: displayed state aid decisions and project grants 0 (source: RAR, RTK; snapshot: 10.11.2026).
Observed ship-register entries
Owner entry in the register, may not be current owner. Current ownership is unverified. Separate revisions are separate entries, not additional vessels. Type and use retain the source wording.
No observed entries for open ships in this snapshot.
Source: Centre of Registers and Information Systems, ship register · Licence: CC BY-SA 4.0 · RIK Laev.xml, CC BY-SA 4.0 · Registrite ja Infosüsteemide Keskus (RIK) · Data catalogue
Environmental records
Source presence and source status do not confirm permit validity. Emission sources and waste facilities are separate record types. Record counts are not an environmental footprint or pollution quantities. Location is unknown.
No environmental records in this snapshot.
Source: RTK · MTR · Keskkonnaamet · RTK: Source observation date unknown · MTR: Source observation date unknown · Keskkonnaamet: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences
What procurement has the company won (snapshot 10.11.2026)?
Terrat AS: procurement wins 38 (source: Riigihangete register; snapshot: 10.11.2026).
Won a tender. The company has won a public tender, 38 wins.
Informational indicators, not accusations or proof of wrongdoing. Free CSV exports the loaded rows. Load more to include further results.
Kanalisatsioonitorustike rekonstrueerimine CIPP meetodil · 16.06.2026
Incorporated < 90 days before decision: Rule not met; ; ; f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/10095208 | 2026-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306891; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Unknown; ; ; f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/10095208 | 2026-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306891 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-11-07 – 2026-06-16; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 10078fae-9d76-48d1-8f63-8100d3b4ebeb/afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/TEN-0001/10095208 | 2025-11-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300413; 57cbad06-01ae-4d80-8019-2aeeab5ab980/5991b782-ea71-4ad0-9028-71519036ec59/RES-0000/TEN-0001/10095208 | 2024-06-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277671; 777a72a1-49bd-46d0-8744-d5f3c850d53b/14243cd2-b4f0-4bd1-986b-c57c4621a174/RES-0002/TEN-0003/10095208 | 2023-11-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/269138; bbcd2a47-350c-4fee-9608-74442d59554b/56770979-94d9-498c-97f3-b3672b782147/RES-0000/TEN-0001/10095208 | 2026-05-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309956; cab6839f-58d5-437f-8eba-8ae815a9b758/5451a3f7-4ca4-4370-a5bd-749ccc413537/RES-0000/TEN-0001/10095208 | 2025-04-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290171; d679687f-556f-4b71-adaa-ca0d74223785/f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/TEN-0001/10095208 | 2026-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306891; ea2d5b26-a2ca-4864-9369-23244eda5615/9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/TEN-0001/10095208 | 2025-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299461; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/TEN-0001/10095208 | 2026-04-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307208; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/TEN-0001/10095208 | 2026-03-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306724; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/ca4fdfdf-8777-45d5-8ba6-e44996cb1a60/RES-0000/TEN-0001/10095208 | 2024-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277521; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/f1b117fa-4703-4893-bc1c-d5da563d7153/RES-0000/TEN-0001/10095208 | 2024-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274273 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/10095208 · 2026-06-16
ariregister:10095208 · 1996-11-11
f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/10095208 · 2026-06-16
Vana-Keila mnt 69, Saue · 19.05.2026
Incorporated < 90 days before decision: Rule not met; ; ; 56770979-94d9-498c-97f3-b3672b782147/RES-0000/10095208 | 2026-05-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309956; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Unknown; ; ; 56770979-94d9-498c-97f3-b3672b782147/RES-0000/10095208 | 2026-05-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309956 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-11-07 – 2026-06-16; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 10078fae-9d76-48d1-8f63-8100d3b4ebeb/afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/TEN-0001/10095208 | 2025-11-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300413; 57cbad06-01ae-4d80-8019-2aeeab5ab980/5991b782-ea71-4ad0-9028-71519036ec59/RES-0000/TEN-0001/10095208 | 2024-06-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277671; 777a72a1-49bd-46d0-8744-d5f3c850d53b/14243cd2-b4f0-4bd1-986b-c57c4621a174/RES-0002/TEN-0003/10095208 | 2023-11-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/269138; bbcd2a47-350c-4fee-9608-74442d59554b/56770979-94d9-498c-97f3-b3672b782147/RES-0000/TEN-0001/10095208 | 2026-05-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309956; cab6839f-58d5-437f-8eba-8ae815a9b758/5451a3f7-4ca4-4370-a5bd-749ccc413537/RES-0000/TEN-0001/10095208 | 2025-04-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290171; d679687f-556f-4b71-adaa-ca0d74223785/f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/TEN-0001/10095208 | 2026-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306891; ea2d5b26-a2ca-4864-9369-23244eda5615/9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/TEN-0001/10095208 | 2025-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299461; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/TEN-0001/10095208 | 2026-04-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307208; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/TEN-0001/10095208 | 2026-03-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306724; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/ca4fdfdf-8777-45d5-8ba6-e44996cb1a60/RES-0000/TEN-0001/10095208 | 2024-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277521; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/f1b117fa-4703-4893-bc1c-d5da563d7153/RES-0000/TEN-0001/10095208 | 2024-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274273 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
56770979-94d9-498c-97f3-b3672b782147/RES-0000/10095208 · 2026-05-19
ariregister:10095208 · 1996-11-11
56770979-94d9-498c-97f3-b3672b782147/RES-0000/10095208 · 2026-05-19
Kaluri tn 11, Tallinn · 02.04.2026
Incorporated < 90 days before decision: Rule not met; ; ; 068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/10095208 | 2026-04-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307208; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Unknown; ; ; 068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/10095208 | 2026-04-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307208 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-11-07 – 2026-06-16; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 10078fae-9d76-48d1-8f63-8100d3b4ebeb/afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/TEN-0001/10095208 | 2025-11-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300413; 57cbad06-01ae-4d80-8019-2aeeab5ab980/5991b782-ea71-4ad0-9028-71519036ec59/RES-0000/TEN-0001/10095208 | 2024-06-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277671; 777a72a1-49bd-46d0-8744-d5f3c850d53b/14243cd2-b4f0-4bd1-986b-c57c4621a174/RES-0002/TEN-0003/10095208 | 2023-11-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/269138; bbcd2a47-350c-4fee-9608-74442d59554b/56770979-94d9-498c-97f3-b3672b782147/RES-0000/TEN-0001/10095208 | 2026-05-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309956; cab6839f-58d5-437f-8eba-8ae815a9b758/5451a3f7-4ca4-4370-a5bd-749ccc413537/RES-0000/TEN-0001/10095208 | 2025-04-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290171; d679687f-556f-4b71-adaa-ca0d74223785/f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/TEN-0001/10095208 | 2026-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306891; ea2d5b26-a2ca-4864-9369-23244eda5615/9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/TEN-0001/10095208 | 2025-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299461; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/TEN-0001/10095208 | 2026-04-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307208; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/TEN-0001/10095208 | 2026-03-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306724; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/ca4fdfdf-8777-45d5-8ba6-e44996cb1a60/RES-0000/TEN-0001/10095208 | 2024-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277521; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/f1b117fa-4703-4893-bc1c-d5da563d7153/RES-0000/TEN-0001/10095208 | 2024-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274273 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/10095208 · 2026-04-02
ariregister:10095208 · 1996-11-11
068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/10095208 · 2026-04-02
Peterburi tee 103, Tallinn · 26.03.2026
Incorporated < 90 days before decision: Rule not met; ; ; 4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/10095208 | 2026-03-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306724; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Unknown; ; ; 4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/10095208 | 2026-03-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306724 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-11-07 – 2026-06-16; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 10078fae-9d76-48d1-8f63-8100d3b4ebeb/afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/TEN-0001/10095208 | 2025-11-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300413; 57cbad06-01ae-4d80-8019-2aeeab5ab980/5991b782-ea71-4ad0-9028-71519036ec59/RES-0000/TEN-0001/10095208 | 2024-06-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277671; 777a72a1-49bd-46d0-8744-d5f3c850d53b/14243cd2-b4f0-4bd1-986b-c57c4621a174/RES-0002/TEN-0003/10095208 | 2023-11-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/269138; bbcd2a47-350c-4fee-9608-74442d59554b/56770979-94d9-498c-97f3-b3672b782147/RES-0000/TEN-0001/10095208 | 2026-05-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309956; cab6839f-58d5-437f-8eba-8ae815a9b758/5451a3f7-4ca4-4370-a5bd-749ccc413537/RES-0000/TEN-0001/10095208 | 2025-04-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290171; d679687f-556f-4b71-adaa-ca0d74223785/f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/TEN-0001/10095208 | 2026-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306891; ea2d5b26-a2ca-4864-9369-23244eda5615/9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/TEN-0001/10095208 | 2025-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299461; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/TEN-0001/10095208 | 2026-04-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307208; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/TEN-0001/10095208 | 2026-03-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306724; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/ca4fdfdf-8777-45d5-8ba6-e44996cb1a60/RES-0000/TEN-0001/10095208 | 2024-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277521; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/f1b117fa-4703-4893-bc1c-d5da563d7153/RES-0000/TEN-0001/10095208 | 2024-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274273 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/10095208 · 2026-03-26
ariregister:10095208 · 1996-11-11
4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/10095208 · 2026-03-26
Maardu linnas Loodepargi sademeveerajatiste ehitustööd · 18.02.2026
Incorporated < 90 days before decision: Rule not met; ; ; b2e09185-6a17-4c1c-9880-f98e828cf6a6/RES-0000/10095208 | 2026-02-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299251; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Rule not met; ; ; b2e09185-6a17-4c1c-9880-f98e828cf6a6/RES-0000/10095208 | 2026-02-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299251 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-02-18 – 2026-02-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; a5a35cd1-a133-4b10-83ee-9b23febb5932/b2e09185-6a17-4c1c-9880-f98e828cf6a6/RES-0000/TEN-0001/10095208 | 2026-02-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299251 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
b2e09185-6a17-4c1c-9880-f98e828cf6a6/RES-0000/10095208 · 2026-02-18
ariregister:10095208 · 1996-11-11
b2e09185-6a17-4c1c-9880-f98e828cf6a6/RES-0000/10095208 · 2026-02-18
Kõima reoveepuhasti rekonstrueerimine · 18.02.2026
Incorporated < 90 days before decision: Rule not met; ; ; a3808a08-d844-4a74-b4a0-37729013b464/RES-0000/10095208 | 2026-02-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303904; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Rule not met; ; ; a3808a08-d844-4a74-b4a0-37729013b464/RES-0000/10095208 | 2026-02-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303904 Repeated recorded procedures: Indicator present; Distinct procedures: 6; Retained award dates: 2024-04-09 – 2026-02-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 30915564-83f7-4b70-a02e-3ef8c36155ec/a3808a08-d844-4a74-b4a0-37729013b464/RES-0000/TEN-0001/10095208 | 2026-02-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303904; 404a96be-83aa-4565-9962-dd01121f6c29/122d71d7-2aec-4e84-87e1-d6334eaca8a1/RES-0000/TEN-0001/10095208 | 2025-04-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292102; 4c3d87ef-6ed5-48f1-a7c5-0531dff309a6/92dbdc8f-fcba-4af4-b0ea-91c9d5b2cfe8/RES-0000/TEN-0001/10095208 | 2024-05-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/278634; 92719834-cab8-40d1-8450-4c973e9122af/220b4161-04b0-4a4e-88a5-5d096a30bd54/RES-0000/TEN-0001/10095208 | 2024-04-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/276225; 9b983231-d4dd-4ef5-8ee9-569bc8f3b4b8/751ed539-5707-4ee4-ad74-fb8319471b3e/RES-0000/TEN-0001/10095208 | 2025-10-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298977; ad42b5f6-6d08-4971-8241-9dece8cef441/3007f390-0bdc-4733-9fb5-9b6142fd0aaa/RES-0000/TEN-0001/10095208 | 2024-04-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277063 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
a3808a08-d844-4a74-b4a0-37729013b464/RES-0000/10095208 · 2026-02-18
ariregister:10095208 · 1996-11-11
a3808a08-d844-4a74-b4a0-37729013b464/RES-0000/10095208 · 2026-02-18
Liiva kalmistul kastmisvee pumpla ehitus · 14.11.2025
Incorporated < 90 days before decision: Rule not met; ; ; 6003a06e-58a9-4144-82fc-477b165483c3/RES-0000/10095208 | 2025-11-14 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300041; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Rule not met; ; ; 6003a06e-58a9-4144-82fc-477b165483c3/RES-0000/10095208 | 2025-11-14 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300041 Repeated recorded procedures: Indicator present; Distinct procedures: 2; Retained award dates: 2024-04-19 – 2025-11-14; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; b6eb8039-1491-44f0-9f75-00e918b333b3/6003a06e-58a9-4144-82fc-477b165483c3/RES-0000/TEN-0001/10095208 | 2025-11-14 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300041; e1d81054-9da0-4a1c-8c44-7d1076939bd2/29506866-1074-4779-9e0f-b53315ad611e/RES-0000/TEN-0001/10095208 | 2024-04-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/271766 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
6003a06e-58a9-4144-82fc-477b165483c3/RES-0000/10095208 · 2025-11-14
ariregister:10095208 · 1996-11-11
6003a06e-58a9-4144-82fc-477b165483c3/RES-0000/10095208 · 2025-11-14
Kanalisatsioonitorustike rekonstrueerimine CIPP 2025 Nõmme piirkond II · 10.11.2025
Incorporated < 90 days before decision: Rule not met; ; ; afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/10095208 | 2025-11-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300413; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Rule not met; ; ; afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/10095208 | 2025-11-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300413 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-11-07 – 2026-06-16; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 10078fae-9d76-48d1-8f63-8100d3b4ebeb/afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/TEN-0001/10095208 | 2025-11-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300413; 57cbad06-01ae-4d80-8019-2aeeab5ab980/5991b782-ea71-4ad0-9028-71519036ec59/RES-0000/TEN-0001/10095208 | 2024-06-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277671; 777a72a1-49bd-46d0-8744-d5f3c850d53b/14243cd2-b4f0-4bd1-986b-c57c4621a174/RES-0002/TEN-0003/10095208 | 2023-11-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/269138; bbcd2a47-350c-4fee-9608-74442d59554b/56770979-94d9-498c-97f3-b3672b782147/RES-0000/TEN-0001/10095208 | 2026-05-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309956; cab6839f-58d5-437f-8eba-8ae815a9b758/5451a3f7-4ca4-4370-a5bd-749ccc413537/RES-0000/TEN-0001/10095208 | 2025-04-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290171; d679687f-556f-4b71-adaa-ca0d74223785/f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/TEN-0001/10095208 | 2026-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306891; ea2d5b26-a2ca-4864-9369-23244eda5615/9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/TEN-0001/10095208 | 2025-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299461; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/TEN-0001/10095208 | 2026-04-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307208; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/TEN-0001/10095208 | 2026-03-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306724; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/ca4fdfdf-8777-45d5-8ba6-e44996cb1a60/RES-0000/TEN-0001/10095208 | 2024-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277521; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/f1b117fa-4703-4893-bc1c-d5da563d7153/RES-0000/TEN-0001/10095208 | 2024-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274273 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/10095208 · 2025-11-10
ariregister:10095208 · 1996-11-11
afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/10095208 · 2025-11-10
Pärnus, Ringi tn 26 ühissademeveekanalisatsiooni liitumispunkti rajamine · 30.10.2025
Incorporated < 90 days before decision: Rule not met; ; ; 751ed539-5707-4ee4-ad74-fb8319471b3e/RES-0000/10095208 | 2025-10-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298977; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Rule not met; ; ; 751ed539-5707-4ee4-ad74-fb8319471b3e/RES-0000/10095208 | 2025-10-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298977 Repeated recorded procedures: Indicator present; Distinct procedures: 6; Retained award dates: 2024-04-09 – 2026-02-18; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 30915564-83f7-4b70-a02e-3ef8c36155ec/a3808a08-d844-4a74-b4a0-37729013b464/RES-0000/TEN-0001/10095208 | 2026-02-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/303904; 404a96be-83aa-4565-9962-dd01121f6c29/122d71d7-2aec-4e84-87e1-d6334eaca8a1/RES-0000/TEN-0001/10095208 | 2025-04-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/292102; 4c3d87ef-6ed5-48f1-a7c5-0531dff309a6/92dbdc8f-fcba-4af4-b0ea-91c9d5b2cfe8/RES-0000/TEN-0001/10095208 | 2024-05-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/278634; 92719834-cab8-40d1-8450-4c973e9122af/220b4161-04b0-4a4e-88a5-5d096a30bd54/RES-0000/TEN-0001/10095208 | 2024-04-09 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/276225; 9b983231-d4dd-4ef5-8ee9-569bc8f3b4b8/751ed539-5707-4ee4-ad74-fb8319471b3e/RES-0000/TEN-0001/10095208 | 2025-10-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/298977; ad42b5f6-6d08-4971-8241-9dece8cef441/3007f390-0bdc-4733-9fb5-9b6142fd0aaa/RES-0000/TEN-0001/10095208 | 2024-04-30 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277063 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
751ed539-5707-4ee4-ad74-fb8319471b3e/RES-0000/10095208 · 2025-10-30
ariregister:10095208 · 1996-11-11
751ed539-5707-4ee4-ad74-fb8319471b3e/RES-0000/10095208 · 2025-10-30
Tuuleveski tn ja Pakase tn kanalisatsioonitorustike rekonstrueerimine kinnisel meetodil · 02.10.2025
Incorporated < 90 days before decision: Rule not met; ; ; 9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/10095208 | 2025-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299461; ariregister:10095208 | 1996-11-11 | https://ariregister.rik.ee/est/company/10095208 One tender reported: Unknown; ; ; 9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/10095208 | 2025-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299461 Repeated recorded procedures: Indicator present; Distinct procedures: 8; Retained award dates: 2023-11-07 – 2026-06-16; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 10078fae-9d76-48d1-8f63-8100d3b4ebeb/afb3134f-bdfa-4efc-9609-dcc7cd537aca/RES-0000/TEN-0001/10095208 | 2025-11-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/300413; 57cbad06-01ae-4d80-8019-2aeeab5ab980/5991b782-ea71-4ad0-9028-71519036ec59/RES-0000/TEN-0001/10095208 | 2024-06-04 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277671; 777a72a1-49bd-46d0-8744-d5f3c850d53b/14243cd2-b4f0-4bd1-986b-c57c4621a174/RES-0002/TEN-0003/10095208 | 2023-11-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/269138; bbcd2a47-350c-4fee-9608-74442d59554b/56770979-94d9-498c-97f3-b3672b782147/RES-0000/TEN-0001/10095208 | 2026-05-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309956; cab6839f-58d5-437f-8eba-8ae815a9b758/5451a3f7-4ca4-4370-a5bd-749ccc413537/RES-0000/TEN-0001/10095208 | 2025-04-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/290171; d679687f-556f-4b71-adaa-ca0d74223785/f95f7f39-9823-4445-9f4c-a7591b27cdab/RES-0000/TEN-0001/10095208 | 2026-06-16 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306891; ea2d5b26-a2ca-4864-9369-23244eda5615/9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/TEN-0001/10095208 | 2025-10-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/299461; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/068eda27-66db-4eed-9a0f-67e928f27b27/RES-0000/TEN-0001/10095208 | 2026-04-02 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307208; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/4c99c5f8-6af1-4ae7-a4ab-1195b3d4010c/RES-0000/TEN-0001/10095208 | 2026-03-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/306724; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/ca4fdfdf-8777-45d5-8ba6-e44996cb1a60/RES-0000/TEN-0001/10095208 | 2024-05-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/277521; fbeb0bf7-151f-46ef-b1a4-6400df11d7d9/f1b117fa-4703-4893-bc1c-d5da563d7153/RES-0000/TEN-0001/10095208 | 2024-03-18 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/274273 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context
9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/10095208 · 2025-10-02
ariregister:10095208 · 1996-11-11
9eaecb3a-5888-4f37-bac3-e16811b378f7/RES-0000/10095208 · 2025-10-02
Showing 10 / 39
Source: Riigihangete register · Riigihangete register: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences
What changed in the company history (snapshot 10.11.2026)?
Terrat AS: the timeline shows historical events, not an assessment of current status (source: Äriregister, EMTA, Ametlikud Teadaanded; snapshot: 10.11.2026).
2026
Reports, taxes and grants (2)
- Tax Board 2026 III: turnover €1.75m, employees: 36
- Tax Board 2026 II: turnover €1.86m, employees: 36
2011
- Share capital changed: 6720000.0 EEK → €429,478
2002
- Share capital changed: 7056000.0 EEK → 6720000.0 EEK
1998
- Share capital changed: 784000.0 EEK → 7056000.0 EEK
- Share capital changed: 592000.0 EEK → 784000.0 EEK
1996
- Entered in the business register
- Share capital changed: missing → 592000.0 EEK
- Name changed: missing → Aktsiaselts Terrat
- Status changed: missing → in the register
Showing 10 / 27
Events: 27 · newest first · Sources: Business Register, Tax Board, RTK, Official Notices
Which sources supply the data (snapshot 10.11.2026)?
Terrat AS: displayed source records 9 (source: Äriregister, EMTA, RTK, MTR, Keskkonnaamet, Ametlikud Teadaanded, Riigi kinnisvararegister, Riigihangete register, RIK laevakinnistusraamat; snapshot: 10.11.2026).
↔ Scroll horizontally to see all columns.
| Block | Source | Licence | Expected cadence | Source observation | Snapshot | Checked | Official record |
|---|---|---|---|---|---|---|---|
| Business Register | Äriregister | CC BY 4.0 | nightly | Source observation date unknown | 10.11.2026 19:44 | 10.11.2026 | open ↗ |
| Taxes | EMTA | CC BY-SA 3.0 | quarterly tax figures / daily debt list | Debt list observed: 09.11.2026 · daily debt list | 10.11.2026 19:44 | 10.11.2026 | open ↗ |
| Grants | RTK | CC BY-SA 3.0 (Euroopa Liidu struktuuritoetus). RAR: AvTS § 3¹ lg 9. | missing | Source observation date unknown | 10.11.2026 19:44 | 10.11.2026 | open ↗ |
| Licences | MTR | CC BY-SA 3.0 | missing | Source observation date unknown | 10.11.2026 19:44 | 10.11.2026 | open ↗ |
| Licences | Keskkonnaamet | AvTS § 3¹ lg 9 | missing | Source observation date unknown | 10.11.2026 19:44 | 10.11.2026 | open ↗ |
| Announcements | Ametlikud Teadaanded | CC BY-SA 4.0 | nightly | Latest retained notice published: 09.11.2026 · Source observation date unknown | 10.11.2026 19:44 | 10.11.2026 | open ↗ |
| State property | Riigi kinnisvararegister | CC0 1.0 | missing | Source observation date unknown | 10.11.2026 19:44 | 10.11.2026 | open ↗ |
| Public procurement | Riigihangete register | CC BY-SA 3.0 | nightly | Source observation date unknown | 10.11.2026 19:44 | 10.11.2026 | open ↗ |
| missing | RIK laevakinnistusraamat | CC BY-SA 4.0 | missing | Source observation date unknown | missing | missing | open ↗ |
| Court decisions, trademarks, sanctions | source missing — a company-level link has not been published yet; this does not mean there are no records | ||||||
Dates and their basis
Source observation is the source’s own as-of date; the latest notice publication does not prove observation. Snapshot is the data extract publication time. Checked is the source availability check. Missing clocks are not inferred from other dates.