SV Torutööd OÜ

In the registerRegistry code: 11132667

SV Torutööd OÜ: 2025 revenue 3,383,176 €, net profit 1,476,442 € (Company only). 28 employees, 2025 annual average (Company only). Äriregister. Snapshot: 10.11.2026.

  • Current tax-debt statusNot listedEMTA. Observation: 09.11.2026Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.
  • Report 2025FiledÄriregisterCompany only
  • NoticesNo warning noticesAmetlikud Teadaanded. Observation: 09.11.2026
  • Revenue 20253,383,176 €ÄriregisterCompany only
  • Employees 202528Äriregisterannual average; Company only

Place in the peer group

EMTAK 4221, Saare County, 2025

Revenue: fewer than 5 companies, the percentile and quartiles are hidden.

The company against its peer group by metric, 2025 · Company only
MetricCompanyMedianPer­cen­tile
Revenue3,383,176 €——
Net profit1,476,442 €——
Equity7,047,238 €——
Employees28——

Each percentile is computed separately, so n differs; hidden below 5 companies; medians and quartiles in whole euros (rounded). Source: Business Register (annual reports), snapshot 10.11.2026.

Not an official extract; no credit rating is provided.

Register details and contacts
Registered name
SV Torutööd OÜ
Registry code
11132667
Status
in the register (R)
Legal form
Private limited company
Registered
14.06.2005
Share capital
2,556 €
VAT number
EE100978508
Address
Saare County · Saaremaa vald, Sikassaare küla, Põlluvahe tn 4

Names of current board members load in the interactive view.

Report coverage

Annual reports found in our data as of 2026-11-10

Cohort: R-status OÜs registered before 2023, with a 31 December fiscal year end. Years 2024 and 2025 are fixed, independent of the financial benchmark year. Sector and county use current principal company details.

Absence from our data is not evidence of non-filing. Each company counts once per year, including zero or missing revenue. Completeness of national coverage is unknown.

Source extract cutoff: 2026-10-31

↔ Scroll horizontally to see all columns.

Report coverage
Fiscal yearData status
2024Found in data
2025Found in data
Äriregister · CC BY 4.0; calculations by Ärikratt2026-11-10

SV Torutööd OÜ is a private limited company. In 2025, revenue grew 51.1 % to 3,383,176 €, profit grew 53.5 %. The main activity is Construction of utility projects for fluids (4221). The company is located in Saare County. Registered 14.06.2005. Share capital is 2,556 €. 2025 annual-report figures (Company only): profit 1,476,442 €, annual average employees 28. Taxes for III quarter of 2026 were 125,660 €. Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026. There are 5 activity-licence records (including history). There are 15 single-winner procurement wins (2023–2026); recorded contract/framework ceiling value 2,819,443.58 €, not actual payments.

What are the company indicators (2025)?

SV Torutööd OÜ: revenue 3,383,176 € (period: 2025; company only; source: Äriregister; snapshot: 10.11.2026).

#naitajadSnapshot

Annual-report figures: Company only Tax data refers to this legal entity.

Peer group: fewer than 5 companies, percentile is hidden.

↔ Scroll horizontally to see all columns.

Key figures
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
RevenueRevenue: 2019 to 2025, min 2021 · 2,115,082 €, max 2025 · 3,383,176 €, latest 2025 · 3,383,176 €2019 – 20253,383,176 €+51.1 %not shown (fewer than 5 companies) (n = 3)2025; Company onlyRIKchecked 10.11.2026Δ: +51.1 %Position: not shown (fewer than 5 companies) (n = 3)2025; Company onlyRIKAs of: checked 10.11.2026
Net profitNet profit: 2019 to 2025, min 2021 · 107,303 €, max 2025 · 1,476,442 €, latest 2025 · 1,476,442 €2019 – 20251,476,442 €+53.5 %not shown (fewer than 5 companies) (n = 4)2025 · margin 43.6 % (previous year 43 %); Company onlyRIKchecked 10.11.2026Δ: +53.5 %Position: not shown (fewer than 5 companies) (n = 4)2025 · margin 43.6 % (previous year 43 %); Company onlyRIKAs of: checked 10.11.2026
EquityEquity: 2019 to 2025, min 2019 · 3,257,767 €, max 2025 · 7,047,238 €, latest 2025 · 7,047,238 €2019 – 20257,047,238 €—not shown (fewer than 5 companies) (n = 4)2025 · share of assets 96.8 % (previous year 96.5 %); Company onlyRIKchecked 10.11.2026Position: not shown (fewer than 5 companies) (n = 4)2025 · share of assets 96.8 % (previous year 96.5 %); Company onlyRIKAs of: checked 10.11.2026
EmployeesEmployees: 2019 to 2025, min 2021 · 28, max 2023 · 30, latest 2025 · 282019 – 202528—not shown (fewer than 5 companies) (n = 4)2025; Company onlyRIKchecked 10.11.2026Position: not shown (fewer than 5 companies) (n = 4)2025; Company onlyRIKAs of: checked 10.11.2026
Turnover per the Tax BoardTurnover per the Tax Board: 2022 I to 2026 III, min 2022 I · 394,008 €, max 2025 IV · 987,688 €, latest 2026 III · 860,007 €2022 I – 2026 III987,688 €——2025 IV · VAT registered; Company onlyMTAchecked 10.11.20262025 IV · VAT registered; Company onlyMTAAs of: checked 10.11.2026
State taxesState taxes: 2022 I to 2026 III, min 2023 II · 52,984 €, max 2025 IV · 159,178 €, latest 2026 III · 125,660 €2022 I – 2026 III159,178 €——2025 IV; Company onlyMTAchecked 10.11.20262025 IV; Company onlyMTAAs of: checked 10.11.2026
Labour taxesLabour taxes: 2022 I to 2026 III, min 2022 II · 35,117 €, max 2026 III · 66,449 €, latest 2026 III · 66,449 €2022 I – 2026 III59,666 €——2025 IV; Company onlyMTAchecked 10.11.20262025 IV; Company onlyMTAAs of: checked 10.11.2026
State aid receivedmissing——no state-aid decisionsRAR, RTKchecked 10.11.2026no state-aid decisionsRAR, RTKAs of: checked 10.11.2026
Report 2025filed———RIKchecked 10.11.2026RIKAs of: checked 10.11.2026

EMTA: state taxes are paid taxes net of refunds; labour taxes are paid income and social tax plus pension and unemployment insurance contributions.

The percentile (p) is the company rank among peers in the same activity and county in the same year. It is hidden when fewer than 5 companies qualify. Each figure shows its period and source.

Which legal entities are related to the company (snapshot 10.11.2026)?

SV Torutööd OÜ: ownership links are between legal entities only; shared-board links show companies, not people (source: Äriregister; snapshot: 10.11.2026).

#seosedSnapshot

Dated register facts. No signals does not confirm the absence of liabilities.

Owners and holdings

No legal-entity owners or holdings.

Business Register shareholders · Natural-person owners are hidden, so the percentages may stay below 100 %.

State property contracts

Fees exclude VAT; currency is unknown. Each fee has its own period. Never sum or annualise fees. Types and statuses are source assertions; this is not a general property ownership register.

Rows on this page / total records: 0 / 0

No state property contracts in this snapshot.

Source: Riigi kinnisvararegister · CC0 1.0

Companies sharing a board member

RIK

Same query via MCP

Source: Äriregister · Riigi kinnisvararegister · Äriregister: Source observation date unknown · Riigi kinnisvararegister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What are the company signals (snapshot 10.11.2026)?

we count and cite; we do not grade

SV Torutööd OÜ: Not on the EMTA public tax-debt list (≥100 €) as of 09.11.2026. EMTA. Snapshot: 10.11.2026.

#signaalidSnapshot

↔ Scroll horizontally to see all columns.

Public signals
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Current tax-debt statusNot on the EMTA public tax-debt list (≥100 €) as of 09.11.2026.Check directly: EMTA ———EMTA09.11.2026EMTAAs of: 09.11.2026
Debt episode (history)missing——off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTA09.11.2026off the list after 3 consecutive absences (EMTA ~11th/~21st swings)EMTAAs of: 09.11.2026
Annual reportsReport 2025 filed———RIKchecked 10.11.2026RIKAs of: checked 10.11.2026
Official noticesNo bankruptcy, liquidation, restructuring or enforcement notices——5 yearsAmetlikud Teadaandedchecked 10.11.20265 yearsAmetlikud TeadaandedAs of: checked 10.11.2026
StatusStatus changes: 1——status history: 4 entriesRIKchecked 10.11.2026status history: 4 entriesRIKAs of: checked 10.11.2026
Composite signal (derived)Lowview——Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt—Report lateness is not scored. Notice selection and time windows differ from those used for the score.Ärikratt
Commercial pledgeNo commercial pledge——pledgee names withheldRIKchecked 10.11.2026pledgee names withheldRIKAs of: checked 10.11.2026
Court decisions · sanctions · trademarkssource missing——a company-level link has not been published yet——a company-level link has not been published yet
Composite signal components (derived, not an official score)

Score (derived) 0/100 derived

A composite signal from structured data, not an official assessment or credit rating. It describes data known at calculation time; no forecast horizon is specified.

Calculated 10.11.2026 10:15.

Methodology version: 1.3.

Stored component contributions

  1. Tax debt · 0 points
  2. Financial health · 0 points
  3. Board changes · 0 points
  4. Insolvency notices · 0 points
  5. Licence loss · 0 points

A stored 0 proves neither absence of events nor complete source coverage. Without detail, its cause is unknown.

The underlying record reference is unavailable. No specific event or document can be identified.

methodology

Calculated 10.11.2026 10:15. The score is not a credit rating and not a default forecast. methodology · The score is not a credit rating

Snapshot: Äriregister: 10.11.2026 19:44 · EMTA: 10.11.2026 19:44 · Ametlikud Teadaanded: 10.11.2026 19:44
Source: Äriregister · EMTA · Ametlikud TeadaandedLatest available report year: 2025 (annual reporting) · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · Score calculated: 10.11.2026 · Calculation and snapshot publication do not establish source freshness · Äriregister: Source observation date unknown · EMTA: Debt list observed: 09.11.2026 · daily debt list · Ametlikud Teadaanded: Latest retained notice published: 09.11.2026 · Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026View company sourcesAll sources and licences

What are the company financial results (2025)?

SV Torutööd OÜ: net profit 1,476,442 € (period: 2025; company only; source: Äriregister; snapshot: 10.11.2026).

#finantsSnapshot

2025 · Company only: revenue 3,383,176 €, net profit 1,476,442 €.

Annual reports 2019–2025

↔ Scroll horizontally to see all columns.

Financials
MetricValueΔPeriod and basisSourceAs ofComparison and sources
Revenue3,383,176 €+51.1 %2025; Company onlyRIKchecked 10.11.2026Δ: +51.1 %2025; Company onlyRIKAs of: checked 10.11.2026
Net profit1,476,442 €+53.5 %2025; Company onlyRIKchecked 10.11.2026Δ: +53.5 %2025; Company onlyRIKAs of: checked 10.11.2026
Equity7,047,238 €+26.5 %2025; Company onlyRIKchecked 10.11.2026Δ: +26.5 %2025; Company onlyRIKAs of: checked 10.11.2026
Assets7,278,642 €+26.1 %2025; Company onlyRIKchecked 10.11.2026Δ: +26.1 %2025; Company onlyRIKAs of: checked 10.11.2026
Employees28-3.4 %2025; Company onlyRIKchecked 10.11.2026Δ: -3.4 %2025; Company onlyRIKAs of: checked 10.11.2026
Revenue2,238,897 €-24.5 %2024; Company onlyRIKchecked 10.11.2026Δ: -24.5 %2024; Company onlyRIKAs of: checked 10.11.2026
Net profit961,629 €+79 %2024; Company onlyRIKchecked 10.11.2026Δ: +79 %2024; Company onlyRIKAs of: checked 10.11.2026
Equity5,571,928 €+20.9 %2024; Company onlyRIKchecked 10.11.2026Δ: +20.9 %2024; Company onlyRIKAs of: checked 10.11.2026
Assets5,772,305 €+18.9 %2024; Company onlyRIKchecked 10.11.2026Δ: +18.9 %2024; Company onlyRIKAs of: checked 10.11.2026
Employees29-3.3 %2024; Company onlyRIKchecked 10.11.2026Δ: -3.3 %2024; Company onlyRIKAs of: checked 10.11.2026
Revenue2,964,023 €+17.1 %2023; Company onlyRIKchecked 10.11.2026Δ: +17.1 %2023; Company onlyRIKAs of: checked 10.11.2026
Net profit537,330 €+208.6 %2023; Company onlyRIKchecked 10.11.2026Δ: +208.6 %2023; Company onlyRIKAs of: checked 10.11.2026
Equity4,610,297 €+13.2 %2023; Company onlyRIKchecked 10.11.2026Δ: +13.2 %2023; Company onlyRIKAs of: checked 10.11.2026
Assets4,852,754 €+12.6 %2023; Company onlyRIKchecked 10.11.2026Δ: +12.6 %2023; Company onlyRIKAs of: checked 10.11.2026
Employees30+3.4 %2023; Company onlyRIKchecked 10.11.2026Δ: +3.4 %2023; Company onlyRIKAs of: checked 10.11.2026
Revenue2,531,634 €+19.7 %2022; Company onlyRIKchecked 10.11.2026Δ: +19.7 %2022; Company onlyRIKAs of: checked 10.11.2026
Net profit174,122 €+62.3 %2022; Company onlyRIKchecked 10.11.2026Δ: +62.3 %2022; Company onlyRIKAs of: checked 10.11.2026
Equity4,072,969 €+4.5 %2022; Company onlyRIKchecked 10.11.2026Δ: +4.5 %2022; Company onlyRIKAs of: checked 10.11.2026
Assets4,310,013 €+5.4 %2022; Company onlyRIKchecked 10.11.2026Δ: +5.4 %2022; Company onlyRIKAs of: checked 10.11.2026
Employees29+3.6 %2022; Company onlyRIKchecked 10.11.2026Δ: +3.6 %2022; Company onlyRIKAs of: checked 10.11.2026
Revenue2,115,082 €-20.4 %2021; Company onlyRIKchecked 10.11.2026Δ: -20.4 %2021; Company onlyRIKAs of: checked 10.11.2026
Net profit107,303 €-79.9 %2021; Company onlyRIKchecked 10.11.2026Δ: -79.9 %2021; Company onlyRIKAs of: checked 10.11.2026
Equity3,898,846 €+2.8 %2021; Company onlyRIKchecked 10.11.2026Δ: +2.8 %2021; Company onlyRIKAs of: checked 10.11.2026
Assets4,089,286 €+2.8 %2021; Company onlyRIKchecked 10.11.2026Δ: +2.8 %2021; Company onlyRIKAs of: checked 10.11.2026
Employees28-3.4 %2021; Company onlyRIKchecked 10.11.2026Δ: -3.4 %2021; Company onlyRIKAs of: checked 10.11.2026
Revenue2,658,753 €-1.3 %2020; Company onlyRIKchecked 10.11.2026Δ: -1.3 %2020; Company onlyRIKAs of: checked 10.11.2026
Net profit533,776 €+7.4 %2020; Company onlyRIKchecked 10.11.2026Δ: +7.4 %2020; Company onlyRIKAs of: checked 10.11.2026
Equity3,791,543 €+16.4 %2020; Company onlyRIKchecked 10.11.2026Δ: +16.4 %2020; Company onlyRIKAs of: checked 10.11.2026
Assets3,979,393 €+12.4 %2020; Company onlyRIKchecked 10.11.2026Δ: +12.4 %2020; Company onlyRIKAs of: checked 10.11.2026
Employees290 %2020; Company onlyRIKchecked 10.11.2026Δ: 0 %2020; Company onlyRIKAs of: checked 10.11.2026
Revenue2,693,568 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Net profit496,782 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Equity3,257,767 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Assets3,540,071 €—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026
Employees29—2019; Company onlyRIKchecked 10.11.20262019; Company onlyRIKAs of: checked 10.11.2026

Same query via MCP

Source: Äriregister · Latest available report year: 2025 (annual reporting) · Äriregister: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

How much tax did the company pay (2026 III)?

SV Torutööd OÜ: state taxes 125,660 € (period: 2026 III; company only; source: EMTA; snapshot: 10.11.2026).

#maksudSnapshot

↔ Scroll horizontally to see all columns.

Tax figures by quarter
MetricValueΔPositionPeriod and basisSourceAs ofComparison and sources
Quarterly declared turnover (EMTA)860,007 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
State taxes125,660 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Labour taxes66,449 €——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Employees (EMTA quarter, legal entity)29——2026 III; Company onlyEMTAchecked 10.11.20262026 III; Company onlyEMTAAs of: checked 10.11.2026
Tax Board public tax data
QuarterQuarterly declared turnover (EMTA) (€)State taxes €Labour taxes €Employees (EMTA quarter, legal entity)
2026 III860,007125,66066,44929
2026 II532,86981,46456,56631
2026 I668,432136,57154,74826
2025 IV987,688159,17859,66626
2025 III970,982130,47357,00026
2025 II831,367119,84849,14427
2025 I461,73383,21253,05925
2024 IV780,409122,62453,15227
2024 III567,08292,56750,65528
2024 II488,51383,55146,31226

Showing 10 / 19

Source: EMTA · Latest available tax quarter: 2026 Q3 (quarterly tax figures) · Company debt-list observation: 09.11.2026 (daily debt list) · EMTA: Debt list observed: 09.11.2026 · daily debt list · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What state aid has the company received (snapshot 10.11.2026)?

SV Torutööd OÜ: displayed state aid decisions and project grants 0 (source: RAR, RTK; snapshot: 10.11.2026).

#toetusedSnapshot

Observed ship-register entries

Owner entry in the register, may not be current owner. Current ownership is unverified. Separate revisions are separate entries, not additional vessels. Type and use retain the source wording.

No observed entries for open ships in this snapshot.

Source: Centre of Registers and Information Systems, ship register · Licence: CC BY-SA 4.0 · RIK Laev.xml, CC BY-SA 4.0 · Registrite ja Infosüsteemide Keskus (RIK) · Data catalogue

Environmental records

Source presence and source status do not confirm permit validity. Emission sources and waste facilities are separate record types. Record counts are not an environmental footprint or pollution quantities. Location is unknown.

Download CSV
Current or confirmed in source (1)
Environmental records · Current or confirmed in source
Record typeNumberSource statusStart dateEnd dateLegal validityOfficial link
Environmental permitJÄ/330089IssuedSource valid from: 2017-12-05Source valid until: 2027-12-01UnknownOfficial link unavailable
Archived or ended (1)
Environmental records · Archived or ended
Record typeNumberSource statusStart dateEnd dateLegal validityOfficial link
Waste facilityJKK7400122ArchivedActivity start: 2019-05-15Activity end: 2020-12-31UnknownOfficial link unavailable

Source: Keskkonnaamet, KOTKAS permits, AvTS § 3¹(9)

Source: RTK · MTR · Keskkonnaamet · RTK: Source observation date unknown · MTR: Source observation date unknown · Keskkonnaamet: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What procurement has the company won (snapshot 10.11.2026)?

SV Torutööd OÜ: procurement wins 15 (source: Riigihangete register; snapshot: 10.11.2026).

#hankedSnapshot

Won a tender. The company has won a public tender, 15 wins.

Informational indicators, not accusations or proof of wrongdoing. Free CSV exports the loaded rows. Load more to include further results.

Käina soojustorustike ehitamine 1. etapp · 20.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; bd00b042-b073-45b3-9287-e16e310cae0a/RES-0000/11132667 | 2026-07-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307060; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Rule not met; ; ; bd00b042-b073-45b3-9287-e16e310cae0a/RES-0000/11132667 | 2026-07-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307060 Repeated recorded procedures: Rule not met; Distinct procedures: 1; Retained award dates: 2026-07-20 – 2026-07-20; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 466799d0-fc66-4353-8ab5-bbdff9141f7d/bd00b042-b073-45b3-9287-e16e310cae0a/RES-0000/TEN-0001/11132667 | 2026-07-20 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/307060 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

bd00b042-b073-45b3-9287-e16e310cae0a/RES-0000/11132667 · 2026-07-20

ariregister:11132667 · 2005-06-14

bd00b042-b073-45b3-9287-e16e310cae0a/RES-0000/11132667 · 2026-07-20

466799d0-fc66-4353-8ab5-bbdff9141f7d/bd00b042-b073-45b3-9287-e16e310cae0a/RES-0000/TEN-0001/11132667 · 2026-07-20

Kuressaare linna Tolli tänava torustike rekonstrueerimine ja katendite taastamine · 13.07.2026

Incorporated < 90 days before decision: Rule not met; ; ; 77e2bd2b-61f5-4ce0-83af-d1df01eff8e4/RES-0000/11132667 | 2026-07-13 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309454; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Rule not met; ; ; 77e2bd2b-61f5-4ce0-83af-d1df01eff8e4/RES-0000/11132667 | 2026-07-13 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309454 Repeated recorded procedures: Indicator present; Distinct procedures: 2; Retained award dates: 2025-01-24 – 2026-07-13; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 6fb5a20d-1615-4bae-bd2d-f1f22004771b/77e2bd2b-61f5-4ce0-83af-d1df01eff8e4/RES-0000/TEN-0001/11132667 | 2026-07-13 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309454; a0431328-afc6-4b11-b741-e3c5fdfd49e0/df619bdc-adb6-43c9-81bc-de49b4cbb1e8/RES-0000/TEN-0001/11132667 | 2025-01-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/285702 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

77e2bd2b-61f5-4ce0-83af-d1df01eff8e4/RES-0000/11132667 · 2026-07-13

ariregister:11132667 · 2005-06-14

77e2bd2b-61f5-4ce0-83af-d1df01eff8e4/RES-0000/11132667 · 2026-07-13

6fb5a20d-1615-4bae-bd2d-f1f22004771b/77e2bd2b-61f5-4ce0-83af-d1df01eff8e4/RES-0000/TEN-0001/11132667 · 2026-07-13

a0431328-afc6-4b11-b741-e3c5fdfd49e0/df619bdc-adb6-43c9-81bc-de49b4cbb1e8/RES-0000/TEN-0001/11132667 · 2025-01-24

Uus-Roomassaare 35a, Vesikaare 2, Pilve 1 ja Pilve 2 soojustorustiku projekteerimine ja ehitamine · 10.04.2026

Incorporated < 90 days before decision: Rule not met; ; ; b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Rule not met; ; ; b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575 Repeated recorded procedures: Indicator present; Distinct procedures: 12; Retained award dates: 2023-06-27 – 2026-04-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 | 2024-06-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279533; 070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960; 17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925; 422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 | 2023-12-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/271929; 477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279532; 53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280; 557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940; 83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 | 2023-08-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/267819; b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683; d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575; fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 | 2023-06-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/264659; fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/11132667 · 2026-04-10

ariregister:11132667 · 2005-06-14

b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/11132667 · 2026-04-10

03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 · 2024-06-07

070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 · 2025-06-26

17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 · 2024-08-06

422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 · 2023-12-07

477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 · 2024-07-01

53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 · 2024-07-01

557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 · 2025-01-03

83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 · 2023-08-24

b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 · 2024-12-19

d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 · 2026-04-10

fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 · 2023-06-27

fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 · 2026-03-10

Kuressaares Aia tn 64, Aia tn 66 a, Körberi tn 12 ja Pikk tn 56 kaugküttetorustiku projekteerimine ning Körberi tn 12 ja Pikk tn 56 kaugküttetorustiku ehitamine. · 10.03.2026

Incorporated < 90 days before decision: Rule not met; ; ; 7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Rule not met; ; ; 7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173 Repeated recorded procedures: Indicator present; Distinct procedures: 12; Retained award dates: 2023-06-27 – 2026-04-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 | 2024-06-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279533; 070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960; 17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925; 422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 | 2023-12-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/271929; 477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279532; 53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280; 557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940; 83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 | 2023-08-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/267819; b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683; d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575; fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 | 2023-06-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/264659; fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/11132667 · 2026-03-10

ariregister:11132667 · 2005-06-14

7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/11132667 · 2026-03-10

03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 · 2024-06-07

070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 · 2025-06-26

17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 · 2024-08-06

422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 · 2023-12-07

477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 · 2024-07-01

53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 · 2024-07-01

557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 · 2025-01-03

83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 · 2023-08-24

b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 · 2024-12-19

d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 · 2026-04-10

fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 · 2023-06-27

fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 · 2026-03-10

Mesilase 4 ja 6 elamute kaugkütte ühendustorustike projekteerimine ja ehitamine · 26.06.2025

Incorporated < 90 days before decision: Rule not met; ; ; 06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Unknown; ; ; 06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960 Repeated recorded procedures: Indicator present; Distinct procedures: 12; Retained award dates: 2023-06-27 – 2026-04-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 | 2024-06-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279533; 070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960; 17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925; 422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 | 2023-12-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/271929; 477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279532; 53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280; 557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940; 83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 | 2023-08-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/267819; b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683; d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575; fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 | 2023-06-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/264659; fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/11132667 · 2025-06-26

ariregister:11132667 · 2005-06-14

06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/11132667 · 2025-06-26

03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 · 2024-06-07

070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 · 2025-06-26

17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 · 2024-08-06

422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 · 2023-12-07

477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 · 2024-07-01

53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 · 2024-07-01

557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 · 2025-01-03

83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 · 2023-08-24

b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 · 2024-12-19

d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 · 2026-04-10

fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 · 2023-06-27

fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 · 2026-03-10

Mändjala reoveekogumisala ÜVK projekteerimis- ehitustööd · 24.01.2025

Incorporated < 90 days before decision: Rule not met; ; ; df619bdc-adb6-43c9-81bc-de49b4cbb1e8/RES-0000/11132667 | 2025-01-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/285702; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Rule not met; ; ; df619bdc-adb6-43c9-81bc-de49b4cbb1e8/RES-0000/11132667 | 2025-01-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/285702 Repeated recorded procedures: Indicator present; Distinct procedures: 2; Retained award dates: 2025-01-24 – 2026-07-13; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 6fb5a20d-1615-4bae-bd2d-f1f22004771b/77e2bd2b-61f5-4ce0-83af-d1df01eff8e4/RES-0000/TEN-0001/11132667 | 2026-07-13 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/309454; a0431328-afc6-4b11-b741-e3c5fdfd49e0/df619bdc-adb6-43c9-81bc-de49b4cbb1e8/RES-0000/TEN-0001/11132667 | 2025-01-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/285702 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

df619bdc-adb6-43c9-81bc-de49b4cbb1e8/RES-0000/11132667 · 2025-01-24

ariregister:11132667 · 2005-06-14

df619bdc-adb6-43c9-81bc-de49b4cbb1e8/RES-0000/11132667 · 2025-01-24

6fb5a20d-1615-4bae-bd2d-f1f22004771b/77e2bd2b-61f5-4ce0-83af-d1df01eff8e4/RES-0000/TEN-0001/11132667 · 2026-07-13

a0431328-afc6-4b11-b741-e3c5fdfd49e0/df619bdc-adb6-43c9-81bc-de49b4cbb1e8/RES-0000/TEN-0001/11132667 · 2025-01-24

Mustjala kooli maakütte projekteerimine ja ehitamine. · 03.01.2025

Incorporated < 90 days before decision: Rule not met; ; ; 51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Rule not met; ; ; 51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940 Repeated recorded procedures: Indicator present; Distinct procedures: 12; Retained award dates: 2023-06-27 – 2026-04-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 | 2024-06-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279533; 070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960; 17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925; 422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 | 2023-12-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/271929; 477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279532; 53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280; 557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940; 83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 | 2023-08-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/267819; b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683; d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575; fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 | 2023-06-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/264659; fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/11132667 · 2025-01-03

ariregister:11132667 · 2005-06-14

51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/11132667 · 2025-01-03

03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 · 2024-06-07

070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 · 2025-06-26

17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 · 2024-08-06

422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 · 2023-12-07

477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 · 2024-07-01

53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 · 2024-07-01

557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 · 2025-01-03

83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 · 2023-08-24

b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 · 2024-12-19

d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 · 2026-04-10

fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 · 2023-06-27

fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 · 2026-03-10

Lehe 5 soojustorustiku projekteerimine ja ehitamine · 19.12.2024

Incorporated < 90 days before decision: Rule not met; ; ; 426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Rule not met; ; ; 426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683 Repeated recorded procedures: Indicator present; Distinct procedures: 12; Retained award dates: 2023-06-27 – 2026-04-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 | 2024-06-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279533; 070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960; 17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925; 422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 | 2023-12-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/271929; 477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279532; 53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280; 557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940; 83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 | 2023-08-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/267819; b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683; d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575; fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 | 2023-06-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/264659; fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/11132667 · 2024-12-19

ariregister:11132667 · 2005-06-14

426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/11132667 · 2024-12-19

03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 · 2024-06-07

070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 · 2025-06-26

17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 · 2024-08-06

422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 · 2023-12-07

477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 · 2024-07-01

53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 · 2024-07-01

557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 · 2025-01-03

83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 · 2023-08-24

b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 · 2024-12-19

d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 · 2026-04-10

fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 · 2023-06-27

fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 · 2026-03-10

Komandandi 10 soojustorustiku ehitus · 06.08.2024

Incorporated < 90 days before decision: Rule not met; ; ; 919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Indicator present; ; ; 919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925 Repeated recorded procedures: Indicator present; Distinct procedures: 12; Retained award dates: 2023-06-27 – 2026-04-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 | 2024-06-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279533; 070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960; 17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925; 422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 | 2023-12-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/271929; 477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279532; 53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280; 557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940; 83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 | 2023-08-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/267819; b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683; d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575; fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 | 2023-06-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/264659; fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/11132667 · 2024-08-06

ariregister:11132667 · 2005-06-14

919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/11132667 · 2024-08-06

03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 · 2024-06-07

070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 · 2025-06-26

17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 · 2024-08-06

422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 · 2023-12-07

477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 · 2024-07-01

53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 · 2024-07-01

557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 · 2025-01-03

83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 · 2023-08-24

b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 · 2024-12-19

d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 · 2026-04-10

fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 · 2023-06-27

fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 · 2026-03-10

Mesilase tn 2 soojustorustiku projekteerimine ja ehitamine · 01.07.2024

Incorporated < 90 days before decision: Rule not met; ; ; e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280; ariregister:11132667 | 2005-06-14 | https://ariregister.rik.ee/est/company/11132667 One tender reported: Unknown; ; ; e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280 Repeated recorded procedures: Indicator present; Distinct procedures: 12; Retained award dates: 2023-06-27 – 2026-04-10; Same corporate buyer and supplier; distinct unambiguous folder IDs across all retained records, independent of the page filters.; ; 03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 | 2024-06-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279533; 070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 | 2025-06-26 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/295960; 17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 | 2024-08-06 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/281925; 422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 | 2023-12-07 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/271929; 477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/279532; 53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 | 2024-07-01 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/280280; 557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 | 2025-01-03 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/282940; 83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 | 2023-08-24 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/267819; b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 | 2024-12-19 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/286683; d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 | 2026-04-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305575; fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 | 2023-06-27 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/264659; fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 | 2026-03-10 | https://riigihanked.riik.ee/rhr-web/#/procurement-ref/305173 On the EMTA list on the decision date: Unknown; ; ; Informational indicators, not accusations or proof of wrongdoing. Methodology and limitations: /en/info#award-context

e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/11132667 · 2024-07-01

ariregister:11132667 · 2005-06-14

e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/11132667 · 2024-07-01

03ea177e-a4fb-4af3-8f63-8a665b15c0af/bbea5807-6532-4318-9362-187f89434b39/RES-0000/TEN-0001/11132667 · 2024-06-07

070527e8-8e9c-4077-b08d-8ea8b7cf1592/06f7c140-56a2-4bc3-922d-b671c5ad4dd4/RES-0000/TEN-0001/11132667 · 2025-06-26

17c9c972-c7bf-43bf-932f-499549d6d91e/919963b9-32be-4f8a-9d94-3bad3df67567/RES-0000/TEN-0001/11132667 · 2024-08-06

422f9f4b-62a7-49f9-a6bb-990458e4a5db/8bdd11df-83ad-43f6-b294-8fa01d7eb76b/RES-0000/TEN-0001/11132667 · 2023-12-07

477f07f7-0617-4fa5-b2e5-e9c796fa6e4b/b156b5b4-9ae3-4c9d-bffb-01fc1f0c1853/RES-0000/TEN-0001/11132667 · 2024-07-01

53bbc7f8-21b6-4b79-af5b-cc7c03d69a42/e833d318-0750-4e67-9d0d-cd23bcf285bf/RES-0000/TEN-0001/11132667 · 2024-07-01

557819df-dc2e-4109-a16f-34009760650a/51b1d02c-784a-468c-880e-cc70f04e5d5e/RES-0000/TEN-0001/11132667 · 2025-01-03

83422fad-22a8-4d97-a137-6c1415451bc1/ea0e7656-238d-46f3-8a90-b5547791878e/RES-0000/TEN-0001/11132667 · 2023-08-24

b08e2711-e702-436e-8d9c-2b74dfc5fc92/426f80f7-ccc3-45ac-9ef5-89726b26caf4/RES-0000/TEN-0001/11132667 · 2024-12-19

d8962174-0adb-46da-b9d6-774b886dafcd/b79fa3d9-f827-4fa4-bda3-8e53492fd68c/RES-0000/TEN-0001/11132667 · 2026-04-10

fe8470f9-4d70-4158-9910-2b893833f3e7/2758b89d-4969-41e5-9c3d-ccb8ae17d420/RES-0000/TEN-0001/11132667 · 2023-06-27

fe864503-6037-4570-a5f7-a0c10b22979f/7ad04bfd-bb59-4ddd-b80e-8535f6f10408/RES-0000/TEN-0001/11132667 · 2026-03-10

Showing 10 / 15

Source: Riigihangete register · Riigihangete register: Source observation date unknown · Source acquisition date unknown · Snapshot published: 10.11.2026 · View company sources · All sources and licences

What changed in the company history (snapshot 10.11.2026)?

SV Torutööd OÜ: the timeline shows historical events, not an assessment of current status (source: Äriregister, EMTA, Ametlikud Teadaanded; snapshot: 10.11.2026).

#ajajoonSnapshot

2026

Reports, taxes and grants (3)
  • Tax Board 2026 III: turnover €860k, employees: 29
    taxes
  • Tax Board 2026 II: turnover €532.9k, employees: 31
    taxes
  • Tax Board 2026 I: turnover €668.4k, employees: 26
    taxes

2025

Reports, taxes and grants (2)
  • Tax Board 2025 IV: turnover €987.7k, employees: 26
    taxes
  • Tax Board 2025 III: turnover €971k, employees: 26
    taxes

2011

  • Share capital changed: 40000.0 EEK → €2,556
    register

2005

  • Entered in the business register
    register
  • Share capital changed: missing → 40000.0 EEK
    register
  • Name changed: missing → SV Torutööd OÜ
    register
  • Status changed: missing → in the register
    register

Showing 10 / 24

Events: 24 · newest first · Sources: Business Register, Tax Board, RTK, Official Notices

Which sources supply the data (snapshot 10.11.2026)?

SV Torutööd OÜ: displayed source records 9 (source: Äriregister, EMTA, RTK, MTR, Keskkonnaamet, Ametlikud Teadaanded, Riigi kinnisvararegister, Riigihangete register, RIK laevakinnistusraamat; snapshot: 10.11.2026).

#allikadSnapshot
View Markdown

↔ Scroll horizontally to see all columns.

Block, source, licence, period, vintage and official link
BlockSourceLicenceExpected cadenceSource observationSnapshotCheckedOfficial record
Business RegisterÄriregisterCC BY 4.0nightlySource observation date unknown10.11.2026 19:4410.11.2026open ↗
TaxesEMTACC BY-SA 3.0quarterly tax figures / daily debt listDebt list observed: 09.11.2026 · daily debt list10.11.2026 19:4410.11.2026open ↗
GrantsRTKCC BY-SA 3.0 (Euroopa Liidu struktuuritoetus). RAR: AvTS § 3¹ lg 9.missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
LicencesMTRCC BY-SA 3.0missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
LicencesKeskkonnaametAvTS § 3¹ lg 9missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
AnnouncementsAmetlikud TeadaandedCC BY-SA 4.0nightlyLatest retained notice published: 09.11.2026 · Source observation date unknown10.11.2026 19:4410.11.2026open ↗
State propertyRiigi kinnisvararegisterCC0 1.0missingSource observation date unknown10.11.2026 19:4410.11.2026open ↗
Public procurementRiigihangete registerCC BY-SA 3.0nightlySource observation date unknown10.11.2026 19:4410.11.2026open ↗
missingRIK laevakinnistusraamatCC BY-SA 4.0missingSource observation date unknownmissingmissingopen ↗
Court decisions, trademarks, sanctionssource missing — a company-level link has not been published yet; this does not mean there are no records
Dates and their basis

Source observation is the source’s own as-of date; the latest notice publication does not prove observation. Snapshot is the data extract publication time. Checked is the source availability check. Missing clocks are not inferred from other dates.

Shortcuts

Quick search/ Ctrl+K
Home · Sectors · Regionsg h · g s · g r
Grants · Procurement · Compare · Watchlistg t · g k · g v · g j
In a table: move · open · compare · watchjk · ↵ · c · w
On a company page: sections1–9
←→↑↓ · Home · End

Use arrow keys to explore data points. Home and End move to the first and last point.

Close / backesc